BPCS/LX Tip of the Week: Shop Order Release Date

Anthony Etzel 0 63028 Article rating: No rating

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 66373 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

Filtec Selects Crossroads RMC for Baan Data Collection

Kathy Barthelt 0 32140 Article rating: No rating

Filtec, a leading provider of in-line inspection solutions for the food, beverage, and pharmaceutical industries, has selected the Web Collect, formerly RMC3 data collection solution from Crossroads RMC for their Baan IV system. Filtec plans to implement Labor Reporting and Report Operations Complete as part of this project with the goal of eliminating manual data entry and gaining better visibility to gap time. The project is scheduled to go live in early November 2015.

BPCS/LX TIP OF THE DAY: MATERIAL REQUIREMENT DATES AND LEAD TIME OFFSETS IN MRP

Anthony Etzel 0 68465 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

Baan/LN Tip of the Week: Data Sizing Moving to LN

Kathy Barthelt 0 130425 Article rating: No rating

The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume.  Set the autogrowth to a minimum of 10 percent or 1 GB (for each extent) to avoid fragmentation on file system level. Never use the default extent size of 1 MB.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 65831 Article rating: 3.0

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items

Kathy Barthelt 0 129465 Article rating: 3.0

If you have a parts warehouse and prefer to use SIC for planning (re-order point) but need to use MRP/MPS planning for production, create a non-nettable warehouse for the parts warehouse and run the SIC plan against that warehouse.

When running the SIC plan, be sure to set the Order System to “MPS to MRP” for Baan IV and to “Planned to Planned” for Baan V and LN.

Using this method you keep the parts inventory out of the production planning and in the hands of the parts warehouse planner.

BPCS/LX Tip of the Week: Indirect Time Reporting

Anthony Etzel 0 64349 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.

  • If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  • If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

First120121122123125127128129Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

ERP & the Importance of Accuracy & Productivity

Infor LN & Baan

If you don't think accuracy and productivity are important, you need to take a hard look at HOW you’re running your ERP system.

  • Have you eliminated large amounts of data entry?
  • Is your data error-free at month's end?
  • Do all of your systems talk to one another?

If the answer is no, Crossroads RMC can improve accuracy and productivity with system integration and/or automation.

Too expensive you say? Too time-consuming and way too much effort to make it happen? 
Not necessarily... Crossroads RMC consultants deliver valuable integrations and automated processes at a fraction of the cost of other providers.

Whether you’re running ION on the latest version of Infor LN or using Baan IV or Baan V with no integration platform in place, there are benefits to automation and system integration for every area of your business:

Finance:
Say goodbye to typos that lead to huge problems, like paying invoices late or charging the wrong customer. You’ll have accurate data in your system, so month-end processes run smoother and your employees are freed up to do more important tasks.

Customer Relationship Management:
When it comes to keeping customers happy, speed is crucial. You can automate invoicing, customer reports, and more to ensure that customers always have what they need. Automate report delivery from your system to ensure you always have the right information at your fingertips. And even without automating report delivery, your ERP system brings all the information together in one place, and automated data entry and extraction means it’s accurate.

Supply Chain Management:
Set up automated alerts to the right people. With ERP automation, you can trigger an email when a product has low stock or is overstocked. Keeping inventory levels just right is essential to be able to fulfill orders but not waste resources by having too much on hand.

Manufacturing Resource Planning:
Say goodbye to appending data manually. Let’s say you get a shipment of inventory that is a different color than you’d planned, which means they need different SKUs. Now you have thousands of SKUs to update, but an automated process can append data in the system unattended in a fraction of the time it’d take a person to do it.

Human Resource Management:
It might not be that hard to pull the sales data to calculate commissions manually for one sales rep. But multiply that by a growing sales force every pay period, and you’ll be grateful you automated your ERP system. Integrate with HR platforms to manage data transfers for calculating sales and commissions, even setting up triggers to do this automatically at the same time every week.

These are just a few of the possible ways to simplify your ERP system and produce accurate results that save time and money. 


Crossroads RMC has assisted many clients with integrations and automation for Infor LN and Baan. 800.762.2077 |  solutions@crossroadsrmc.com

Print
20144 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories