Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 73213 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 80158 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 31972 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 67887 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 101975 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance

Kathy Barthelt 0 96810 Article rating: No rating

In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax.

 

In Infor LN, users can select or clear the new Include Tax in Order Balance check box in the COM Parameters (tccom0000s000) session to indicate whether users want to include tax amounts in the order balance amount. This parameter has an effect on various sessions in Order Management.

BPCS/LX Tip of the Week: Product Routing

Anthony Etzel 0 70641 Article rating: No rating

Defining the Product Routing first requires the items to be setup in the Item Master file. Other master files also need to be defined prior to creating the routing.
These include:

  • The Facility defined with a SYS program
  • The Warehouses defined with an INV program
  • Locations defined with an INV program
  • The Machines (required if using capacity planning or an MES interface) defined with an MDM program

After the above data is set up, the Department file and Work Center files can be setup in MDM. Now you are ready to define a product route.

First120121122123125127128129Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Materials Tip: Sales Quotations

Sales quotations are used to supply a sold-to business partner with the required details to make a purchasing decision.

You can create a sales quotation in response to a request for quotation (RFQ) from a business partner, or as a sales tool to initiate the sales process with potential business partners. A quotation includes the dates, terms, items, or item descriptions to be sold, and a success percentage, which reflects the level of certainty that the quotation will be accepted. Sales quotations are included in the planning modules based on their success percentages. Quotations with a high success percentage are considered as sold.

You can print and send quotations to business partners. You can specify the results of the returned quotations in Sales. If the quotation is not accepted, you can specify the reason for failure and the competitor who won the quote. If the business partner accepts the quotation, you can transfer the quotation to a sales order and specify the reason for success.

Sales quotation procedure - The normal sales quotation procedure includes the creation, printing, specification of results, and processing of sales quotations.

Additional processes - A number of processes do not always occur in the sales quotation procedure, but can be used optionally, such as ATP and CTP checks, creating alternative quotation lines, and copying bill of material components to a sales quotation.

Inserting items from a catalog - You can add items from a catalog to a sales quotation.

Product variants -  You can configure or link product variants for generic items on the sales quotation line.

Price stages - You can link a price stage to a sales quotation line. When processing the quotation to a sales order, the price stage is copied from the quotation line to the sales order line. Sales order lines can be blocked based on the price stage.

Material price information - You can link material price information to a sales quotation line. As a result, the (document line) price on the sales quotation line includes material prices.

After-sales services -  You can specify the after-sales services that will apply to a sold item after delivery. When processing a quotation to a sales order, the after-sales service data is copied from the sales quotation to the sales order.

Project pegging in sales - To identify costs, demand, and supply for a project, you can peg project costs for sales quotation.

Previous Article Infor LN & Baan Finance Tip: What Can You Do in the Financial Statements Module?
Next Article Infor LN & Baan Tip: Job Management
Print
68179 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories