Baan/LN Tip of the Day: Company Calendar

Kathy Barthelt 0 104311 Article rating: 5.0

Baan uses the company calendar in the following modules to determine the start and end dates for planned orders:

  • Master Production Scheduling
  • Material Requirements Planning
  • Capacity Requirements Planning
    (All three combined in a single planning module for Baan V and LN)
  • Shop Floor Control

The calendar provides the valid working days, number of shifts per day and the number of hours in a day.

Baan allows for a single calendar for the whole company or for a calendar for each work center.

BPCS/LX Tip of the Week: Cycle Counting Part 1

Anthony Etzel 0 82580 Article rating: No rating

Understanding: The Cycle Count Transaction

If you rely on BPCS to provide you with a cycle count list, the number of items could vary from day to day from a few items to count, to several. So the person doing the cycle counting may spend a few minutes to a few hours counting items. After the cycle count is complete, the balances are not changed until the reconciliation is complete. This process could take some time before the balances are changed.

The cycle count transaction process is similar to the physical inventory transaction process.

Baan/LN Tip of the Week: GRINYA

Kathy Barthelt 0 110313 Article rating: 3.0
GRINYA is one of the more complex issues in ERP Finance. GRINYA is the tracking via ledger account of the value of items received on a purchase order that have not been matched to a supplier invoice.

Baan solutions for Baan IV and V were incomplete. To take full advantage of the current GRINYA reconciliation process, check Infor solution #107147, which contains the GRINYA user manual and a link to download the software for your version of Baan. For ERP LN, look at Document Code U8942C US.

It is called User Guide for Reconciliation and Analysis. If you are not running the latest GRINYA solutions, patching will require a good amount of time in filling the Interim tables this solution runs from. Infor has posted several procedural write ups, so check the Support Site and read up before tackling this for the first time.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 81796 Article rating: No rating
For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

BPCS/LX Tip of the Week: The Item Master Requirements Code

Anthony Etzel 0 76748 Article rating: No rating

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

Grindmaster Cecilware Selects Crossroads RMC For Baan IV / Davisware Integration

Crossroads RMC 0 41043 Article rating: No rating

Grindmaster Cecilware, a leader in the development of products for the food and beverage industry, has selected Crossroads RMC to integrate their Baan IV system to Davisware Global Warranty. Davisware is an electronic customizable online solution that fits almost any warranty process. Grindmaster’s customers will be able to access the Davisware software online and process warranty claims which will then automatically feed back into the Baan IV system for further review and processing. The integration is expected to go live in Q1 of 2015.

First119120121122124126127128Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Cost Component Setup

To break down an item’s standard cost, sales price, or valuation price, use cost components. With cost components, you can compare estimated and actual costs, calculate production variances, and analyze costs in Standard Cost Calculation.

If cost components are set up in a detailed way, detailed records exist in the Item - Calculated Valuation Prices (ticpr2540m000) session and the Item - Standard Valuation Prices (ticpr3540m000) session. Additional financial integration transactions are created because integration transactions are logged by cost component. A detailed cost component setup also causes additional cost details in domains such as Sales and Warehousing. This increases database growth and makes performance worse, especially during production completion and the item receipt process.

Reduce the number of cost components in the effective cost component structure, which is displayed in the Effective Cost Component Structure (ticpr0112m000) session, as much as possible. The minimum number is three aggregated cost components: one for material, one for operation, and one for surcharges. From a performance point of view, the following is advised:

Reduce the number of cost components

  • One operation cost component for all operation rates.
  • One cost component for all subcontracting rates.
  • One cost component for item and warehouse surcharges.
  • One cost component for actual labor rates (in People). Ensure you only use cost components that are required.

Use aggregated cost components
The standard cost is calculated by (detailed) cost component for a multilevel BOM. A similar calculation of valuation prices (actual prices) would result in a price structure with many cost components, especially for manufactured items. In case of a warehouse transfer, issue to WIP, and so on, postings are made for every cost component. However, this detailed cost information does not add functional value in Warehousing. If you aggregate cost components, the number of cost components in financial transactions is reduced. Therefore, aggregate operation cost, material cost, and surcharges to the three cost components that are defined in the Item - Costing (ticpr0107m000) session

If you do not enter a Standard Cost Component Scheme in the Item - Costing (ticpr0107m000) session, production order costs, production order variances, and surcharges are posted by aggregated cost component. This improves performance and decreases database growth.

Previous Article Infor LN & Baan Tip: Project Status Options
Next Article Infor ERP Tip: Top 5 Ways Modern Analytics Reduces Spreadsheet Risk & Inefficiency
Print
58368 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories