Baan/LN Tip of the Day: Company Calendar

Kathy Barthelt 0 104319 Article rating: 5.0

Baan uses the company calendar in the following modules to determine the start and end dates for planned orders:

  • Master Production Scheduling
  • Material Requirements Planning
  • Capacity Requirements Planning
    (All three combined in a single planning module for Baan V and LN)
  • Shop Floor Control

The calendar provides the valid working days, number of shifts per day and the number of hours in a day.

Baan allows for a single calendar for the whole company or for a calendar for each work center.

BPCS/LX Tip of the Week: Cycle Counting Part 1

Anthony Etzel 0 82633 Article rating: No rating

Understanding: The Cycle Count Transaction

If you rely on BPCS to provide you with a cycle count list, the number of items could vary from day to day from a few items to count, to several. So the person doing the cycle counting may spend a few minutes to a few hours counting items. After the cycle count is complete, the balances are not changed until the reconciliation is complete. This process could take some time before the balances are changed.

The cycle count transaction process is similar to the physical inventory transaction process.

Baan/LN Tip of the Week: GRINYA

Kathy Barthelt 0 110361 Article rating: 3.0
GRINYA is one of the more complex issues in ERP Finance. GRINYA is the tracking via ledger account of the value of items received on a purchase order that have not been matched to a supplier invoice.

Baan solutions for Baan IV and V were incomplete. To take full advantage of the current GRINYA reconciliation process, check Infor solution #107147, which contains the GRINYA user manual and a link to download the software for your version of Baan. For ERP LN, look at Document Code U8942C US.

It is called User Guide for Reconciliation and Analysis. If you are not running the latest GRINYA solutions, patching will require a good amount of time in filling the Interim tables this solution runs from. Infor has posted several procedural write ups, so check the Support Site and read up before tackling this for the first time.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 81851 Article rating: No rating
For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

BPCS/LX Tip of the Week: The Item Master Requirements Code

Anthony Etzel 0 76836 Article rating: No rating

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

Grindmaster Cecilware Selects Crossroads RMC For Baan IV / Davisware Integration

Crossroads RMC 0 41046 Article rating: No rating

Grindmaster Cecilware, a leader in the development of products for the food and beverage industry, has selected Crossroads RMC to integrate their Baan IV system to Davisware Global Warranty. Davisware is an electronic customizable online solution that fits almost any warranty process. Grindmaster’s customers will be able to access the Davisware software online and process warranty claims which will then automatically feed back into the Baan IV system for further review and processing. The integration is expected to go live in Q1 of 2015.

First119120121122124126127128Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

What is preventing you from upgrading your Infor LN or Baan ERP System?
Kathy Barthelt

What is preventing you from upgrading your Infor LN or Baan ERP System?

Your answer to this question is likely customizations… customizations that were once the best thing since sliced bread but now have become the bane of your existence.

There is something you can do about it! 

Crossroads RMC has many options for dealing with customizations: 

  • Customizations can be re-written to call standard Baan or Infor LN functions via APIs, libraries, BODs, and BDEs.
  • Your customizations can be re-programmed using Extensibility for smaller customizations and LN Studio for larger customizations.
  • RMCgen can be used to create your own custom components without modifying standard programs.
  • Analytics Dashboard allows for an endless variation of Infor LN or Baan views to be created all without touching your ERP system.
  • Infor Report Designer and Infor Document Management can be used to create your own custom-designed report output.
  • Crossroads partners with Nazdaq to deliver custom-designed reports through the B2Win Suite which also integrates with Infor Document Management.
  • New functionality in the latest version of the ERP software may allow you to eliminate many of your customizations.

It all starts with an assessment of your custom components. This is something that can be done internally by you, or with the assistance of Crossroads RMC consultants.

Why continue to live with the elephant in the room who insists on blocking the doorway to progress? Start the process today to get rid of the customizations that are preventing you from taking your ERP system to the next level. Contact us today to learn more: 800.762.2077, solutions@crossroadsrmc.com, or request a phone consultation.

Previous Article The Importance of an Integrated System
Next Article How well does your ERP Serve your Finance team?
Print
70608 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories