BPCS/LX Tip of the Day: MRP/MPS Simulation in LX

Anthony Etzel 0 785 Article rating: No rating

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 1943 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

BPCS/LX Tip of the Day: Cost Accounting – LX

Anthony Etzel 0 868 Article rating: No rating

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

▪ Four sets of costs: actual, standard, frozen standard, and simulated

▪ Nine user-defined elements per set

▪ Full and partial cost roll-up and simulation

▪ Cumulative in-process cost tracking

▪ Cost summaries by item

▪ Cost definition tied to work centers or material type

▪ Process hour costing

Baan/LN Tip of the Day: Vendor Rating

Kathy Barthelt 0 1416 Article rating: No rating

In LN, a supplier's reliability is no longer based only on correct deliveries. The vendor rating functionality of LN is based on various objective criteria and subjective criteria that can be used to calculate the vendor’s rating.

 

The set up procedure for analyzing suppliers has changed completely compared to Baan IV.  To execute the vendor rating process, users must update the vendor ratings in the Update Vendor Rating (tdpur8850m000) session.

If users update the vendor ratings, the following stages exist in the update vendor rating procedure:


1. Calculate actual weightings

2. Calculate ratings for objective criteria

3. Calculate ratings for subjective criteria

4. Update overall vendor rating

Baan/LN Tip of the Day: Release Commissions/Rebates to Invoicing

Kathy Barthelt 0 3103 Article rating: No rating

In Baan IV, this session is called Release Commissions/Rebates to Invoicing (tdcms2201m000) and is used to set the status of the commissions/rebates to Reserved, or Closed. In Infor LN, this session is only used to set the status to  Closed. Users can reserve commissions/rebates in the Reservation and Approval of Reserved Commissions/Rebates (tdcms2202m000) session. In addition, the following fields are added to the Release Commissions/Rebates to Invoicing (tdcms2201m000) session:

▪ Commissions to Accounts Payable

▪ Rebates to Central Invoicing

BPCS/LX Tip of the Day: How Does LX Fit in With Just-In-Time?

Anthony Etzel 0 364 Article rating: No rating

For years, repetitive manufacturing industries have been applying many of the principles in Just-in-Time philosophy. They have established balanced production lines that depend on a steady flow of material to each work station. They schedule production in daily or weekly rates rather than in discrete shop order lots. They track finished inventory by work center rather than by job. They typically backflush stock balances (decrement stock balances upon completion of specific manufacturing steps rather than issued at the beginning of each production run).

 

Costing is typically based upon a daily rate or hourly rate rather than being associated with specific shop orders. 

 

Repetitive manufacturers use MRP II software adaptable to their environments

in the following key areas:


 Product definition

 Inventory tracking

 MRP/Master Scheduling

 Shop Floor Control

 Purchasing

 Costing

BPCS/LX Tip of the Day: What is Just-In-Time?

Anthony Etzel 0 313 Article rating: No rating

Just-in-Time (JIT) is a management philosophy that focuses on minimizing the resources necessary to add value to your products and to operate your factory in ways that eliminate waste. Resources are labor, materials, equipment, space, and time. Waste is anything that does not add value to your products. Moving work-in-process from place to place, stacking and sorting, investing capital in large work-in-process and raw material inventories, inspecting materials at your vendors' sites, and tying up warehouse space with finished goods are all activities that add cost, not value, to your products. 

JIT is a process that reduces lead time. JIT does not replace an MRP, an inventory program, a scheduling technique to bypass your Master Schedule, or a materials management project. JIT is the never-ending commitment of everyone, from top management to your workers on the floor, to maximize your effectiveness through continuous, incremental improvements.

Baan/LN Tip of the Day: Configuring Items

Kathy Barthelt 0 2237 Article rating: No rating

In LN, the configuration of a generic item not always results into a customized item. Configured items can now be customized items as well as standard items. If users configure items without PCS projects, standard items are generated instead of customized items.

 

The sessions for generating product variant structures for sales quotations and sales orders are moved from the Product Configuration module in Manufacturing to the Sales Control module in LN. The following new sessions are available in Sales Control:

▪ Generate (Budget) Structure for Sales Quotations (tdsls1201m100).

▪ Generate (Project) Structure for Sales Orders (tdsls4244m000)

First114115116117119121122123Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE: Currency Differences

When currency differences are posted, several parameters affect the way the entries in the General Ledger are created. This section explains the possible parameter settings:

  1. Ledger accounts by currency

  2. Writing off currency profits

  3. Fixed exchange rate

  4. Writing off currency differences for anticipated payments


1. Ledger accounts by currency
This parameter is recorded in the Finance Company Parameters (tfgld0503m000) session.

If the Ledger Accounts Currency Differences by Currency check box is selected, the (un)realized currency differences are posted to the ledger accounts defined in the Currency Difference Ledger Accounts by Currency (tfgld0119s000) session.

LN retrieves the related dimensions from these sessions:

  • General Ledger: Finance Company Parameters (tfgld0503m000)

  • Accounts Payable: Ledger Accounts by Business Partner Group (tfacp0111m000)

  • ACR: Ledger Accounts by Business Partner Group (tfacr0111m000)

If the Ledger Accounts Currency Differences by Currency check box is cleared, the currency differences are posted to:

  • General Ledger: the ledger accounts specified in the Finance Company Parameters (tfgld0503m000) session.

  • Accounts Payable/ Accounts Receivable: the ledger accounts recorded for the business partner group.


2. Writing off currency profits
This parameter is defined in one of these sessions:

  • ACP Parameters (tfacp0100m000)

  • ACR Parameters (tfacr0100s000)

If the Currency Profits check box is selected, the unrealized currency profits are posted as well as the unrealized currency losses. Unrealized currency losses are always posted when writing off currency differences.

3. Fixed exchange rates
For each invoice, the rate determiner defines:

  • Which date is used to determine the exchange rate.

  • If currency differences are calculated.

  • For which (home) currencies the currency differences are calculated.

The Rate Determiner is set in the Sales Invoices (tfacr1110s000) session or the Purchase Invoice Entry (tfacp2600m000) session.

Unrealized currency differences are written off in one of these sessions:

  • Write Off Currency Differences (tfacp2240m000)

  • Write Off Currency Differences (tfacr2250m000)

4. Writing off currency differences for anticipated payments
This parameter is defined in one of these sessions:

  • ACP Parameters (tfacp0100m000)

  • ACR Parameters (tfacr0100s000)

If the Currency Difference Anticipated Payments check box is selected, invoices with anticipated payments or anticipated receipts are considered for writing off currency differences.

OPERATIONS: Pegging Material Supply Lines for Operation and Product Subcontracting

For project pegged production orders, operations can be subcontracted. The material delivered to the subcontractor can be project pegged or anonymous. The subassemblies that are sent and retrieved are always project pegged. Costing breaks can apply to direct the costs of the subcontracted operation to a specific project cost account. If (production material) costing breaks are used, a purchase order line's peg can differ from the peg on the material supply line.

For product subcontracting, the subcontracted purchase orders can include materials that inherit the project pegs, or can include anonymous materials. The pegged materials are stored in inventory and are shipped to the subcontractor with project pegged orders.

In case of a project pegged order, a peg distribution is linked to the Purchase Order Material Supply Line in the Purchase Peg Distribution (tdpur5100m000) session. For a specific purchase order line (detail) and material sequence, the material supply line's Order and Consumption quantities are distributed across the peg distribution lines for combinations of project/budget, project element, and/or project activity. The peg information in the Purchase Peg Distribution (tdpur5100m000) session includes the line number for the peg in the distribution, the peg (project, element, activity), and the material supply line quantity by peg. The peg distribution cannot be manually created and must always be generated using the parent.

For operation subcontracting, the purchase order line, the material supply line, and the linked peg distributions are generated by Job Shop Control and can only be updated by Job Shop Control.

For product subcontracting, the purchase order line, the material supply line, and the peg distributions are generated by Procurement. A material supply line's peg distribution can be updated only from the parent, that is the purchase order line, the purchase order line peg distribution, or the material supply line. If a purchase order line's distribution line is changed, and no quantities are received or consumed yet, the pegged fields on the linked material supply lines are synchronized to the updated distribution line in the Purchase Order Material Supply Lines (tdpur4116m000) session. However, if a different quantity distribution is applicable, the quantities of the material supply lines' distribution lines are redetermined in the Purchase Peg Distribution (tdpur5100m000) session.


TECHNOLOGY: Load Audit Tables for Profile (ttaud3220s000)

Use this session to load tables for an audit profile.

Usually this session is run from the Specific menu of the Audit Tables by Profile (ttaud3120m000) session. The selected profile in that session is displayed in the first line of the current session.

The result of loading the tables depends on the selection level you use in the current session. For each element on the lowest selection level, a line is created in the Audit Tables by Profile (ttaud3120m000) session. For example, if you select a package and a number of modules, a line is created for each module. Because you did not specify the tables, the All check box is selected.

Field Information

  • Profile: The audit profile for which the tables are loaded.
    Note: If you start the current session from the appropriate menu of the Audit Tables by Profile (ttaud3120m000), the profile displayed is the profile that is selected in that session.
  • Package: The package that contains the tables you want to load.
  • Module: The module that contains the tables you want to load.
  • Table: The tables you want to load.
  • Audit Type: The audit type that must be set for the tables that are loaded.
    Note: You can either select Always, or Changed. However, it is also possible to determine the audit type per field. This is the Not Applicable option in the Audit Tables by Profile (ttaud3120m000) session. If you want to set the audit type per field, you must change the audit type to Not Applicable after the tables are downloaded, and then specify the audit type per field in the Audit Fields by Table (ttaud3125m000) session.

Previous Article Infor LN & Baan Tips & Tricks for OPERATIONS: Subcontracting Overview
Next Article Infor LN & Baan Tips & Tricks for FINANCE: Currency Differences
Print
163 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories