In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.
 

  1. If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  2. If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

 

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

 

10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 37279 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 71823 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 78747 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 31141 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 66721 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 99725 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

First114115116117119121122123Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for OPERATIONS: What is Statistical Inventory Control (SIC) and How Does It Work?

Statistical Inventory Control (SIC) is an inventory-controlled order system designed to maintain stock levels based on predefined thresholds, rather than being demand-driven like EP (Enterprise Planning). Since SIC relies on inventory levels, it may lead to higher stock levels. To minimize financial risks, SIC is best suited for:

  • Low-cost items.
  • Items with predictable demand or short lead times.


Applications of SIC

  • Low-Cost Items: Particularly effective for inexpensive goods.
  • Predictable Demand or Short Lead Time: Suitable when demand patterns are stable or lead times are minimal.
  • Warehouse-Specific Planning: Useful for planning by warehouse rather than across the supply chain.
  • Trading Industries: Commonly employed in sectors like supermarkets.
  • Immediate Demands: Effective for items required immediately by customers.
  • Ease of Use: Simple to implement and manage.


Limitations of SIC

  • Does not account for dependent demand from planned orders (e.g., MPS/MRP/INV).
  • Does not generate distribution orders.
  • Ignores time-phased planned orders.
  • Lacks forecast consumption techniques.
  • Uses both nettable and non-nettable warehouses.

How SIC Works

SIC operates based on the Reorder Point, Stock Levels, and Order Method.

Triggering SIC

When Economic Stocks (calculated as On-Hand Inventory + On-Order – Allocated Stocks) on the Horizon Date fall below the Reorder Point, SIC triggers the creation of:

  • Planned Purchase Advice.
  • Planned Production Advice.


Order Methods in SIC

The quantity for these advices is determined by the Order Method, which can be one of the following:

  • Replenish to Maximum Stock
  • Fixed Order Quantity
  • Economic Order Quantity (EOQ)
  • Lot-for-Lot

Example: SIC in a Supermarket

Scenario: Managing stock for Ice Cream (1 Kg Pack)

  • Current Stock: 10 PCs
  • Reorder Point: 5 PCs
  • Safety Stock: 2 PCs
  • Lead Time: 1 Day
  • Order Method: Replenish to Maximum (Maximum Stock: 20 PCs)
  • Maximum Anticipated Consumption: 3 PCs/Day

Process:

  1. Customer purchases reduce the stock.
  2. When stock reaches 5 PCs, SIC is triggered.
  3. A Purchase Advice is generated for 15 PCs to replenish stock to the maximum level (20 PCs).
  4. During the lead time (1 day), the remaining 3 PCs (excluding Safety Stock) meet customer demands.
  5. In emergencies, Safety Stock can also be utilized.

Statistical Inventory Control offers a practical approach for managing inventory levels, particularly in industries with predictable demand or fast-moving items. However, its limitations make it less ideal for complex or time-phased planning scenarios.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Use of Electronic Bank Statements
Next Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Archiving Data from tipcs300 and ticst300 Tables
Print
53171 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories