10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 35236 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 62804 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 67371 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 30620 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 58435 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 83833 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance

Kathy Barthelt 0 78532 Article rating: No rating

In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax.

 

In Infor LN, users can select or clear the new Include Tax in Order Balance check box in the COM Parameters (tccom0000s000) session to indicate whether users want to include tax amounts in the order balance amount. This parameter has an effect on various sessions in Order Management.

First113114115116118120121122Last

Tips:  LX | BPCS | M3

Item Facility Master has a new attribute to define the override inspection days lead time CICP.ICINSD.

  • When an item facility has a defined override inspection days lead time, that value will be used instead of the system parameter inspection days lead time.

MRP exception report, MRP200B
Purchase planning report, PUR285B
Purchase order / Requisition maintenance, PUR500D3
Purchase order consolidation / release, PUR640B1
Vendor splits, PUR653B

This enhancement improved the subfile utilized in MRP320D Master Schedule Detail Inquiry -SCR001 by expanding the subfile with data rather than clearing the subfile as user pages. This change provides full support for the WebTop 4.8 Grid decorator.

This enhancement updated the approach used to populate the subfile to allow a deployed Webtop Grid to function correctly. There is no visible or user-impacted change to the way the program functions.

This enhancement provides improved functionality and full support of a Webtop grid applied to the subfile.

Last

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Considerations for Release to Warehousing for a Cost Item

When there are two Cost Items, one with Release to Warehousing applied and the other with Release to Warehousing not applied, upon approval of the Sales Order, the Cost Item that is released to Warehousing will go straight to Staged status, pending Shipment confirmation, while the Cost Item that is not released to Warehousing will be up for Sales Deliveries.

Apart from this main difference in functionality between having and not having this option to release to Warehousing checked, there are other impacts to consider. Below is some information gathered from various KBs related to the impact of having release to Warehousing applied (or not). KBs used as reference are listed as “– REF: KB XYZ”. Editing the checkbox “Release to Warehousing” itself If there is a Sales Order (in status Free is enough) for a Cost Item, the check box is not editable. As soon as all the Sales Orders for which the Item is involved are Closed (or Canceled or Deleted) the check box becomes editable again. – REF: KB 1439313 & KB 1613780 Simultaneous/separate release to Warehousing with Physical Items In a scenario where a Cost Item (that is released to Warehousing) and a physical Item are released to Warehousing separately, then the shipment confirmation of each of these Items will occur separately. If they are released simultaneously, the shipment of the Cost Item will not be processed unless and until the physical Item is ready to be shipped. – REF: KB 1449001 Note: Ensure a Warehouse is added to Order Lines to ensure Release to Warehousing Activity is applicable. – REF: KB 2229767 Invoicing

To invoice them separately or together, factors to consider are:

  • Composing Criteria, a list of fields that need to match to have a single invoice created – REF: KB 717977
  • Invoicing Methods (tcmcs0555m000) in the General tab, select Combine, for example, Shipments, to combine different Shipments of the same Sales Order into one Invoice. This Invoicing Method is also defined in
  • Invoice-to role of a Business Partner (tccom4112s000) in the Invoicing tab. – REF: KB 812637
  • For a Return Order where a Cost Item and a Physical Item were originally invoiced together, to invoice them together again, consider using Original Document type = Invoice and link the original Invoice to the Return Order. – REF: KB 2072847 

Note: Consider solution in KB 2108605 if Composing Criteria is met, yet still Credit Notes are not combined for a Return Sales Order copied from original Sales Order for one Physical Item and one Cost Item without release to Warehousing. 

ASN ASN cannot be generated for Purchase Order Lines with Cost Item if not released to Warehousing. – REF: KB 1548301 & KB 2111341 Intercompany Trade Intercompany Trade can be applied for a Cost Item that is released to Warehousing, as Intercompany Trade needs a Warehouse and a Department. – REF: KB 2112430 Customs Value Cost Items that are released to Warehousing that are handled via normal Sales Order Lines are considered as delivered goods and will get the customs value assigned like other Items being subject to warehouse handling. Cost Items handled on Shipment Lines as "Additional Cost" are not considered as delivered goods but as pure costs. The customs value of these shipment lines gets defaulted with a zero amount and cannot be modified. The same applies to additional costs on sales order lines. – REF: KB 1600847 Freight  Cost Items cannot be used for Freight handling. – REF: KB 1830170 Additional Cost

  • For automatically generated Additional Costs in Sales Orders, Cost Items that are released to Warehousing are not released to Warehousing. This is because automatic Additional Costs are always generated with 0 quantity, therefore only the amount is filled for these Lines, which leads to the Delivery Type being set to Sales and not Warehouse. As a result, delivery must take place in Sales module. – REF: KB 1995781
  • For Additional Cost Lines added to Shipment for Cost Items, refer to KB 2236856.

Intrastat Record When using Cost Items without release to Warehousing, there is no shipping data within Invoicing. Therefore, the corresponding Intrastat record cannot be found during the printing of the Invoice. To get the Invoice data filled on the Intrastat record, Cost Items with release to warehousing should be used. Otherwise, session Update Intrastat Transactions with Invoicing Data (tccom7271m100) should be ran to update the Invoicing data in Intrastat. – REF: KB 2005482

Previous Article Infor LN & Baan Tip: What conditions must exist before changing an item's inventory unit?
Next Article Infor LN & Baan Tip: Cash Flow Functionality and Setup
Print
37477 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories