Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

CST Industries Goes Live With LN Ecommerce Site for Dealers

Crossroads RMC 0 30460 Article rating: No rating

Crossroads RMC has partnered with Xenitel Managed Service Solutions and CST Industries to create an online parts ordering site for CST’s dealers. The site is live as of June, 2015. This site was developed largely to simplify the ordering process for CST’s dealers, providing information on available inventory, flexible ordering, fast shipments, and improved dealer support.

 

CST is a global leader in the manufacture and construction of factory coated metal storage tanks, aluminum domes and specialty covers.

Baan/LN Tip of the Day: First Free Numbers

Kathy Barthelt 0 316 Article rating: No rating

In Baan IV, users define series and numbers in the Maintain First Free Numbers (tcmcs0147m000) session. In the Type of Number field, users must select the type of documents for which the series will be used. The generated document numbers are always numeric and can consist of up to six characters.

 

In LN, users must define number groups in the Number Groups (tcmcs0151m000) session and then in the First Free Numbers (tcmcs0150m000) session, define the series and numbers of each number group. Users assign the number groups to various purposes in the corresponding sessions. For example, in the Sales Order Parameters (tdsls0100s400) session, users can select the number group for sales orders and sales schedules. In the Sales Offices (tdsls0512m000) session, users can then select a series of that number group for the sales orders generated by a specific sales office. As the series codes can be alphanumeric, the generated document numbers can be alphanumeric and they can consist of up to nine characters.

BPCS/LX Tip of the Day: Material Requirement Dates and Lead Time Offsets in MRP

Anthony Etzel 0 343 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

Baan/LN Tip of the Week: Database Sizing – Moving to LN

Kathy Barthelt 0 219 Article rating: No rating
The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume.  Set the autogrowth to a minimum of 10 percent or 1 GB (for each extent) to avoid fragmentation on file system level. Never use the default extent size of 1 MB.

How Do You Measure Success in Your Business?

Anthony Etzel 0 52991 Article rating: 5.0

Business owners may measure success in different ways – some tangible, some intangible.

In order to establish how you should measure success for your business, you need to first examine how you measure your personal success. If you are a business owner, or a part of the management team of the company you work for, ask yourself these questions to see how you measure up:

Assess personal success.

1.    Am I happy in my job?

2.    Do I have passion for what I’m doing?

3.    Do I get the desired results based on the effort I’m putting in?

4.    Am I putting forth my best effort?

5.    Am I patient and allow for sufficient time to see results?

6.    Do I get respect from my co-workers?

7.    Do I have the endurance to hang in there when things get a bit rough?


Reflect on successes and failures.

After answering these questions, do you need to make any changes? Do you still have the same ambition and drive to achieve the goal? Are you content with your work, or have you come to the conclusion that you have not done your best?

To be successful...

Baan/LN Tip of the Week: Switching to a Difference Series

Kathy Barthelt 0 204 Article rating: No rating

In general, you can enter a different series in the order field if you have an available series.

To add a new series, find the appropriate group in the First Free Number session, and add a new series and first free number (usually 1).

In Baan IV, go to the Maintain First Free Numbers Session (under Common, Tables, Maintain Logistics Tables, Maintenance 1). Groups are easily identified (e.g., Purchase Order, Sales Order, etc.).

In Baan V, go to the First Free Number Session (under Common Data, Tables, Logistics). There are number groups (e.g., 570 may be for Purchase Orders, 650 may be for Sales Orders, etc.).

In LN, go to the First Free Number Session (tcmcs0150m000 – it is in different places in the menu under different Feature Packs). There are number groups (e.g., 210 may be for Purchase Orders, 310 may be for Sales Orders, etc.).

BPCS/LX Tip of the Day: MRP/MPS Simulation

Anthony Etzel 0 786 Article rating: No rating
The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First113114115116118120121122Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Considerations for Release to Warehousing for a Cost Item

When there are two Cost Items, one with Release to Warehousing applied and the other with Release to Warehousing not applied, upon approval of the Sales Order, the Cost Item that is released to Warehousing will go straight to Staged status, pending Shipment confirmation, while the Cost Item that is not released to Warehousing will be up for Sales Deliveries.

Apart from this main difference in functionality between having and not having this option to release to Warehousing checked, there are other impacts to consider. Below is some information gathered from various KBs related to the impact of having release to Warehousing applied (or not). KBs used as reference are listed as “– REF: KB XYZ”. Editing the checkbox “Release to Warehousing” itself If there is a Sales Order (in status Free is enough) for a Cost Item, the check box is not editable. As soon as all the Sales Orders for which the Item is involved are Closed (or Canceled or Deleted) the check box becomes editable again. – REF: KB 1439313 & KB 1613780 Simultaneous/separate release to Warehousing with Physical Items In a scenario where a Cost Item (that is released to Warehousing) and a physical Item are released to Warehousing separately, then the shipment confirmation of each of these Items will occur separately. If they are released simultaneously, the shipment of the Cost Item will not be processed unless and until the physical Item is ready to be shipped. – REF: KB 1449001 Note: Ensure a Warehouse is added to Order Lines to ensure Release to Warehousing Activity is applicable. – REF: KB 2229767 Invoicing

To invoice them separately or together, factors to consider are:

  • Composing Criteria, a list of fields that need to match to have a single invoice created – REF: KB 717977
  • Invoicing Methods (tcmcs0555m000) in the General tab, select Combine, for example, Shipments, to combine different Shipments of the same Sales Order into one Invoice. This Invoicing Method is also defined in
  • Invoice-to role of a Business Partner (tccom4112s000) in the Invoicing tab. – REF: KB 812637
  • For a Return Order where a Cost Item and a Physical Item were originally invoiced together, to invoice them together again, consider using Original Document type = Invoice and link the original Invoice to the Return Order. – REF: KB 2072847 

Note: Consider solution in KB 2108605 if Composing Criteria is met, yet still Credit Notes are not combined for a Return Sales Order copied from original Sales Order for one Physical Item and one Cost Item without release to Warehousing. 

ASN ASN cannot be generated for Purchase Order Lines with Cost Item if not released to Warehousing. – REF: KB 1548301 & KB 2111341 Intercompany Trade Intercompany Trade can be applied for a Cost Item that is released to Warehousing, as Intercompany Trade needs a Warehouse and a Department. – REF: KB 2112430 Customs Value Cost Items that are released to Warehousing that are handled via normal Sales Order Lines are considered as delivered goods and will get the customs value assigned like other Items being subject to warehouse handling. Cost Items handled on Shipment Lines as "Additional Cost" are not considered as delivered goods but as pure costs. The customs value of these shipment lines gets defaulted with a zero amount and cannot be modified. The same applies to additional costs on sales order lines. – REF: KB 1600847 Freight  Cost Items cannot be used for Freight handling. – REF: KB 1830170 Additional Cost

  • For automatically generated Additional Costs in Sales Orders, Cost Items that are released to Warehousing are not released to Warehousing. This is because automatic Additional Costs are always generated with 0 quantity, therefore only the amount is filled for these Lines, which leads to the Delivery Type being set to Sales and not Warehouse. As a result, delivery must take place in Sales module. – REF: KB 1995781
  • For Additional Cost Lines added to Shipment for Cost Items, refer to KB 2236856.

Intrastat Record When using Cost Items without release to Warehousing, there is no shipping data within Invoicing. Therefore, the corresponding Intrastat record cannot be found during the printing of the Invoice. To get the Invoice data filled on the Intrastat record, Cost Items with release to warehousing should be used. Otherwise, session Update Intrastat Transactions with Invoicing Data (tccom7271m100) should be ran to update the Invoicing data in Intrastat. – REF: KB 2005482

Previous Article Infor LN & Baan Tip: What conditions must exist before changing an item's inventory unit?
Next Article Infor LN & Baan Tip: Cash Flow Functionality and Setup
Print
53288 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories