Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Baan/LN Tip of the Week: How's Your MOM?

Kathy Barthelt 0 83967 Article rating: No rating

I realize it was just Mother’s Day, but I don’t mean your mother.

I mean... MOM- Manufacturing Operations Management, a suite of manufacturing applications designed to improve efficiencies, without the investment in a costly system.

MOM provides manufacturers with the ability to extend their ERP system by offering specific applications that will streamline their operations at an affordable price.

MOM Suite of Manufacturing Applications:

  • Manufacturing Execution System (MES)
  • Time & Attendance
  • Labor Reporting
  • Data Collection
  • Dashboards
  • Scheduling
  • Shipping & Receiving
  • Supplier Barcoding

So, I ask again… how’s your MOM? Contact Crossroads RMC to learn more.

Baan/LN Tip of the Week: Old Porting Set

Kathy Barthelt 0 76501 Article rating: No rating

Here are some issues that you might run into if you stay on an old porting set too long:

  • Incompatibility because of operating system patches
  • Printing issues because of out-of-date libraries
  • Potential performance issues if binaries are not updated
  • Updating third-party products may not be possible because of dependencies
  • Limited support from Infor
  • Issues with updating database software/patches because of dependencies (if the database is also running on the same server as the application)

Need help getting on a newer porting set? Let us know! We’d be happy to help.

BPCS/LX Tip of the Week: Receiving to Inspection

Anthony Etzel 0 49648 Article rating: 5.0

If the item being received needs to be inspected prior to being available for use, there are two schools of thought.

The first is to receive the item to a QC hold location. The downside is the item will show up in on hand inventory.

A better method would be to do a PO receipt to inspection. Both Inv500 and Pur550 support this method. Now you have received the item without showing it in inventory. Only the PO quantity in inspection is updated. This method also allows you to create an Inspection Dispatch Report. After the QC process for the item is complete, then the transaction Receipt from Inspection to Stock is processed. That transaction then updates the PO quantity received field and the Item on hand field in inventory.

BPCS/LX Tip of the Week: Grow Employees to Grow Your Business

Anthony Etzel 0 52172 Article rating: No rating

Earlier this year I wrote a blog about motivating employees to do more… to be more. Doing this helps your business grow. Here is a link to my article> https://www.crossroadsrmc.com/Resources/Infor-ERP-Tips-News/its-not-all-about-the-money-money-money-motivating-employees-in-the-new-year-2

And I would like to share a link to a recent article from Industry Week giving a different take on the same idea.

https://www.industryweek.com/recruiting-retention/grow-employees-grow-your-business

Baan/LN Tip of The Week: Grow Employees to Grow Your Business

Kathy Barthelt 0 86089 Article rating: No rating

Earlier this year I wrote a blog about motivating employees to do more… to be more. Doing this helps your business grow. Here is a link to my article> https://www.crossroadsrmc.com/Resources/Infor-ERP-Tips-News/its-not-all-about-the-money-money-money-motivating-employees-in-the-new-year-2

And I would like to share a link to a recent article from Industry Week giving a different take on the same idea.

https://www.industryweek.com/recruiting-retention/grow-employees-grow-your-business

BPCS/LX Tip of the Week: 6 powerful steps to win with automation

Anthony Etzel 0 59161 Article rating: No rating

1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     

2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.

3. Easy electronic scheduling by sequence and changing job priorities.

4. Evaluate differences using actual times compared to standards.

5. Improve data accuracy and eliminate the need to chase and fix errors.

6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Baan/LN Tip of the Week: 6 Powerful Steps to Win With Automation

Kathy Barthelt 0 88355 Article rating: No rating

1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     

2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.

3. Easy electronic scheduling by sequence and changing job priorities.

4. Evaluate differences using actual times compared to standards.

5. Improve data accuracy and eliminate the need to chase and fix errors.

6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

BPCS/LX Tip of the Week: Receiving to Inspection

Anthony Etzel 0 64910 Article rating: No rating

If the item being received needs to be inspected prior to being available for use, there are two schools of thought.The first is to receive the item to a QC hold location. The downside is the item will show up in on hand inventory.

A better method would be to do a PO receipt to inspection. Both Inv500 and Pur550 support this method. Now you have received the item without showing it in inventory. Only the PO quantity in inspection is updated. This method also allows you to create an Inspection Dispatch Report. After the QC process for the item is complete, then the transaction Receipt from Inspection to Stock is processed. That transaction then updates the PO quantity received field and the Item on hand field in inventory.

 

First109110111112114116117118Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Previous Article Infor LN & Baan Tip of the Week LN 10.7 - Draft Printing
Next Article Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant
Print
103550 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories