Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: 6 Powerful Steps to Win With Automation

Anthony Etzel 0 60940 Article rating: No rating
  1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     
  2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.
  3. Easy electronic scheduling by sequence and changing job priorities.
  4. Evaluate differences using actual times compared to standards.
  5. Improve data accuracy and eliminate the need to chase and fix errors.
  6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: 6 Powerful Steps to Win With Automation

Kathy Barthelt 0 82519 Article rating: No rating
  1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     
  2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.
  3. Easy electronic scheduling by sequence and changing job priorities.
  4. Evaluate differences using actual times compared to standards.
  5. Improve data accuracy and eliminate the need to chase and fix errors.
  6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Crenlo Partners With Crossroads RMC to Achieve Operational Efficiency

Kathy Barthelt 0 31433 Article rating: No rating

Crenlo, a leading manufacturer of cab and enclosure products, has elected to expand their partnership with Crossroads RMC to achieve greater efficiency within their operations. Phase 1 of the implementation will include RMCship (FedEx/UPS integration with Baan), RMCbuild (analysis of current inventory for production needs), Paperless Pick Web Collect Data Collection for their service orders and remote warehouse, and the development of a web-based quality inspection application which will be integrated with their Baan ERP system. 

BPCS/LX Tip of the Week: Tip of the Week: Cross Docking

Anthony Etzel 0 57980 Article rating: No rating

Cross Docking can provide significant improvements in efficiency by looking for outstanding requirements for an item (production orders, sales orders, replenishment orders) and automatically assigning the incoming item to that requirement instead of putting the item away into inventory, only to retrieve it later. Consider implementing cross-docking at your facility. 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Cross Docking

Kathy Barthelt 0 78280 Article rating: No rating

Cross Docking can provide significant improvements in efficiency by looking for outstanding requirements for an item (production orders, sales orders, replenishment orders) and automatically assigning the incoming item to that requirement instead of putting the item away into inventory, only to retrieve it later. Consider implementing cross-docking at your facility. 

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: HOW ACCURATE IS YOUR INVENTORY?

Anthony Etzel 0 50745 Article rating: No rating

Just a refresher on a tip I’ve shared previously from Supply Chain Technology Bulletin regarding how to attain greater inventory accuracy. I thought it would be worthwhile to share again:

  • Record data regarding your inventory as soon as the items arrive at your door / receiving dock. With information, you can make decisions. Without it, you waste money, time and effort.
  • Leverage data collection, label generation and RFID solutions to make your life easier.
  • Set inventory accuracy goals for the business and for employees.
  • Train your employees so they know what is expected of them, and how to best perform their job and therefore how best to maintain accurate inventory counts.
  • Count the inventory – and do it regularly. Find a method that works best for your employees, and for your business.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: How Accurate is Your Inventory?

Kathy Barthelt 0 77008 Article rating: No rating

Just a refresher on a tip I’ve shared previously from Supply Chain Technology Bulletin regarding how to attain greater inventory accuracy. I thought it would be worthwhile to share again:

  • Record data regarding your inventory as soon as the items arrive at your door / receiving dock. With information, you can make decisions. Without it, you waste money, time and effort.
  • Leverage data collection, label generation and RFID solutions to make your life easier.
  • Set inventory accuracy goals for the business and for employees.
  • Train your employees so they know what is expected of them, and how to best perform their job and therefore how best to maintain accurate inventory counts.
  • Count the inventory – and do it regularly. Find a method that works best for your employees, and for your business.

Optimize Your Manufacturing Today!

First104105106107109111112113Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Previous Article Infor LN & Baan Tip of the Week LN 10.7 - Draft Printing
Next Article Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant
Print
103550 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories