Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

CST Industries Goes Live With LN Ecommerce Site for Dealers

Crossroads RMC 0 29833 Article rating: No rating

Crossroads RMC has partnered with Xenitel Managed Service Solutions and CST Industries to create an online parts ordering site for CST’s dealers. The site is live as of June, 2015. This site was developed largely to simplify the ordering process for CST’s dealers, providing information on available inventory, flexible ordering, fast shipments, and improved dealer support.

 

CST is a global leader in the manufacture and construction of factory coated metal storage tanks, aluminum domes and specialty covers.

Baan/LN Tip of the Day: First Free Numbers

Kathy Barthelt 0 316 Article rating: No rating

In Baan IV, users define series and numbers in the Maintain First Free Numbers (tcmcs0147m000) session. In the Type of Number field, users must select the type of documents for which the series will be used. The generated document numbers are always numeric and can consist of up to six characters.

 

In LN, users must define number groups in the Number Groups (tcmcs0151m000) session and then in the First Free Numbers (tcmcs0150m000) session, define the series and numbers of each number group. Users assign the number groups to various purposes in the corresponding sessions. For example, in the Sales Order Parameters (tdsls0100s400) session, users can select the number group for sales orders and sales schedules. In the Sales Offices (tdsls0512m000) session, users can then select a series of that number group for the sales orders generated by a specific sales office. As the series codes can be alphanumeric, the generated document numbers can be alphanumeric and they can consist of up to nine characters.

BPCS/LX Tip of the Day: Material Requirement Dates and Lead Time Offsets in MRP

Anthony Etzel 0 343 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

Baan/LN Tip of the Week: Database Sizing – Moving to LN

Kathy Barthelt 0 219 Article rating: No rating
The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume.  Set the autogrowth to a minimum of 10 percent or 1 GB (for each extent) to avoid fragmentation on file system level. Never use the default extent size of 1 MB.

How Do You Measure Success in Your Business?

Anthony Etzel 0 52551 Article rating: 5.0

Business owners may measure success in different ways – some tangible, some intangible.

In order to establish how you should measure success for your business, you need to first examine how you measure your personal success. If you are a business owner, or a part of the management team of the company you work for, ask yourself these questions to see how you measure up:

Assess personal success.

1.    Am I happy in my job?

2.    Do I have passion for what I’m doing?

3.    Do I get the desired results based on the effort I’m putting in?

4.    Am I putting forth my best effort?

5.    Am I patient and allow for sufficient time to see results?

6.    Do I get respect from my co-workers?

7.    Do I have the endurance to hang in there when things get a bit rough?


Reflect on successes and failures.

After answering these questions, do you need to make any changes? Do you still have the same ambition and drive to achieve the goal? Are you content with your work, or have you come to the conclusion that you have not done your best?

To be successful...

Baan/LN Tip of the Week: Switching to a Difference Series

Kathy Barthelt 0 204 Article rating: No rating

In general, you can enter a different series in the order field if you have an available series.

To add a new series, find the appropriate group in the First Free Number session, and add a new series and first free number (usually 1).

In Baan IV, go to the Maintain First Free Numbers Session (under Common, Tables, Maintain Logistics Tables, Maintenance 1). Groups are easily identified (e.g., Purchase Order, Sales Order, etc.).

In Baan V, go to the First Free Number Session (under Common Data, Tables, Logistics). There are number groups (e.g., 570 may be for Purchase Orders, 650 may be for Sales Orders, etc.).

In LN, go to the First Free Number Session (tcmcs0150m000 – it is in different places in the menu under different Feature Packs). There are number groups (e.g., 210 may be for Purchase Orders, 310 may be for Sales Orders, etc.).

BPCS/LX Tip of the Day: MRP/MPS Simulation

Anthony Etzel 0 786 Article rating: No rating
The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First109110111112114116117118Last

Tips:  LX | BPCS | M3

This enhancement provides additional views, additional order and line details, improved navigation, and additional capabilities to the IDF Customer Order Inquiry cards and to customer order-related business objects such as Allocations, Customer Invoices, Inventory Transaction History, Promotions, Drop Shipments.

Enhanced Order views based on user roles such as customer service, warehouse/logistics, salesperson/commission, data analysis/management reporting

  • Improved sort, select and filter capabilities
  • Enhanced navigation, data organization and data display
  • Improved customer service access to all transactions throughout the entire customer order life cycle – from quote to order, related invoices, and any RMAs, return orders, related credit memos
  • Improved grouping of related fields
  • New cards to present additional order and order line details
  • Consolidation of cards and card details when appropriate
  • Enhanced Display and Maintain capabilities for drillback to related customer, ship-to, item, carrier, terms, and other master file details
  • Improved display of dates, times and applicable time zones when Region Code time zone support is implemented
  • Multi language Description, Name and Address fields displayed in user’s language, if defined, else in base language

This enhancement provides search capabilities on segment value description in Segment Value List window (WINGSVD).

Segment Value List (WINGSVD):

  • Converted to a standard subfile
  • New action code 10=Search

This makes it easier to locate segment values when defining segment values in Model Account Builder or Alias definition. In addition, WINGSVD has been redesigned as a subfile to enable WebTop grid capabilities.

Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tip: Important Porting Set Announcement (all versions of LN & Baan)

There has been a recent porting set change due to Infor’s Product Life Cycle Policy.  

How to determine the maintenance stage of an Infor LN product version and release

Before a customer starts deploying Porting Set 9.4a or a later release, they must determine the actual maintenance stage of their Baan / Infor LN product. The definition of the maintenance stages for the product versions and releases of all versions of Baan and Infor LN are outlined in the Product Support schedule as published in the PLC policy. The maintenance stage of the ERP version is either “Mainstream Maintenance”, “Extended Maintenance” or “Sustaining Maintenance”.

How to manage Porting Set updates

The following conditions apply to customers who intend to upgrade to Porting Set 9.4a or later Porting Set releases:

  • For customers with a product version in Mainstream Maintenance, there will be no difference with regards to Porting Set updates. They can install Porting Set 9.4a or any newer release.
  • Customers with a product version in Extended Maintenance will be able to use Porting Set 9.4a only under the condition that they acquire an Extended Maintenance license and have applied the corresponding validated license key to their SLM License server. This key is a Server license type.
  • Customers with a product version in Extended Maintenance who have not acquired an Extended Maintenance license will not be able to use Porting Set 9.4a or any newer version. The latest Porting Set for these customers that can be installed and used is 9.3j which was released in April 2021.
  • Customers with a product version in Sustaining Maintenance will not be able to use Porting Set 9.4a or any newer version. The latest Porting Set for these customers is 9.3j which was released in April 2021. Customers who are not entitled to upgrade to Porting Set 9.4a can use any Porting Set release prior to Porting Set 9.4a. These continue to be available through the Infor Support Portal.

You can find more information in KB 1946498 General: Infor LN and Baan Product Lifecycle Policy and KB 2204515, or you may contact Crossroads RMC for assistance in determining whether or not you are able to upgrade your porting set.

800.762.2077

Previous Article Don't laugh - the average lifespan of an ERP system is 7-10 years
Next Article Infor LN & Baan Tip: Save Space in General Ledger
Print
51395 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories