BPCS/LX Tip of the Week: Shop Order Release Date

Anthony Etzel 0 62548 Article rating: No rating

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 58265 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

BPCS/LX Tip of the Week: Receiving to Inspection

Anthony Etzel 0 66277 Article rating: No rating

If the item being received needs to be inspected prior to being available for use, there are two schools of thought.

The first is to receive the item to a QC hold location. The downside is the item will show up in on hand inventory.

A better method would be to do a PO receipt to inspection. Both Inv500 and Pur550 support this method. Now you have received the item without showing it in inventory. Only the PO quantity in inspection is updated. This method also allows you to create an Inspection Dispatch Report. After the QC process for the item is complete, then the transaction Receipt from Inspection to Stock is processed. That transaction then updates the PO quantity received field and the Item on hand field in inventory.

Baan/LN Tip of the Week: Purchase Inquiry

Kathy Barthelt 0 84300 Article rating: No rating

In Baan IV Purchase Control, the purchase inquiry procedure enables the user to:

  • Request a specific supplier to submit a quotation on the purchase inquiry for the delivery of an item.
  • Compare the prices and discounts of the quotations that are submitted by different suppliers.
  • Copy the inquiry data to a purchase order.


In LN, you can:

  • Request multiple business partners to submit a quotation on a specific request-for-quotation for the delivery of an item.
  • Compare the received quotations based on the following criteria:
  1. Price
  2. Quantity
  3. Vendor rating
  4. Delivery dates
  5. RFQ subjective criteria
  • Copy the quotation data to a purchase order, a purchase contract, or a price book.

BPCS/LX Tip of the Week: Shop Order Release Date

Anthony Etzel 0 58464 Article rating: No rating

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 59754 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

Filtec Selects Crossroads RMC for Baan Data Collection

Kathy Barthelt 0 28859 Article rating: No rating

Filtec, a leading provider of in-line inspection solutions for the food, beverage, and pharmaceutical industries, has selected the Web Collect, formerly RMC3 data collection solution from Crossroads RMC for their Baan IV system. Filtec plans to implement Labor Reporting and Report Operations Complete as part of this project with the goal of eliminating manual data entry and gaining better visibility to gap time. The project is scheduled to go live in early November 2015.

BPCS/LX TIP OF THE DAY: MATERIAL REQUIREMENT DATES AND LEAD TIME OFFSETS IN MRP

Anthony Etzel 0 63538 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

First108109110111113115116117Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Eliminating ERP Customizations: Key Considerations and Modern Solutions

Transitioning away from customizations can indeed pose challenges, but it's not insurmountable with the right approach. Here’s a look at the real issues and solutions that can pave the way for a streamlined, up-to-date ERP.


Common Challenges:

  1. Dependency on Custom Processes
    Custom processes become ingrained, and removing them disrupts established workflows. However, business processes often evolve over time, as do best practices incorporated into modern ERP systems.

  2. Cost and Time Constraints
    Testing, retraining, and hiring consultants for an upgrade are valid concerns. Yet, consider the efficiency gains and reduced maintenance costs over time by utilizing standard ERP features.

  3. User Resistance
    Change management is critical, as employees can be skeptical of losing tools they’re familiar with. Effective communication about the benefits of standardized, future-ready tools can help ease the transition.


The Reality Check: Has Your Organization Changed?

Evaluate how much your business needs have shifted, how user expectations have evolved, and if any workarounds or interim solutions are now adding unnecessary complexity. Many companies discover that industry-standard ERP features can replace outdated customizations.


Did You Know?

  • ERP Upgrades Can Eliminate 25% - 50% of Customizations
    Modern ERP systems incorporate industry best practices as core features, allowing you to rely less on customizations and more on robust, standardized solutions.

  • Extensibility & Reporting Solutions
    Extensibility tools in Infor LN or Baan let users add last-mile functionality without modifying the core ERP. Reporting tools allow custom insights while keeping ERP data intact.


Solutions to Reduce Customization Dependency:

  1. Rewrite Customizations to Use Standard APIs and Libraries
    This ensures seamless interaction with core ERP features without modifying underlying code.

  2. Utilize Infor Extensibility and LN Studio
    Smaller tweaks can be handled with Extensibility; larger needs can leverage LN Studio for custom apps without touching the ERP's foundation.

  3. Incorporate Infor ION for External Integrations
    If customizations primarily manage integrations, Infor ION can connect and streamline external systems effectively.

  4. RMCgen for Custom Components
    RMCgen allows for custom development without altering standard programs, offering flexibility without compromising core stability.

  5. Analytics Dashboards for ERP Insights
    Dashboards offer tailored views and insights without requiring customizations in the ERP itself.

  6. Leverage Built-in Reporting Tools
    Infor Report Designer, Document Management, and BIRST can provide custom reporting, avoiding custom coding altogether.

  7. Assess Your Custom Components
    A thorough assessment of your customizations—internally or with Crossroads RMC consultants—can reveal areas for potential standardization and streamlining.

Let’s Talk Solutions

If customizations are standing in the way of your ERP’s full potential, Crossroads RMC can help. Connect with us at 800.762.2077, solutions@crossroadsrmc.com, or request a consultation to start your path towards a flexible, future-proof ERP.
 

Print
10056 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories