Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC Moves Arrowhead from 4.0.05CD to Infor LX

Crossroads RMC 0 35307 Article rating: 5.0

Arrowhead Products, a world leader in the design, development and manufacture of ducting systems for aircraft and propulsion lines for rocks, has partnered with Crossroads RMC to move from BPCS 4.0.05CD to Infor LX. Crossroads RMC is providing financial business consulting as part of this project. Go live is expected in Q4 of 2017.

Baan/LN Tip of the Week: What Could go Wrong With GRINYA?

Kathy Barthelt 0 219008 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan/LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

It is recommended that the Integrations Setup tables be audited either through Baan or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Still have GRINYA questions you need answered?
Contact us. We’d be happy to help.

Optimize Your Manufacturing Today!
 

BPCS/LX Tip of the Week: Efficiency– The What & How

Anthony Etzel 0 53136 Article rating: No rating

Efficiency is something we all strive for in our personal lives and at work. How can manufacturers increase their efficiency? Take a hard look at the 4 key areas:

  1. Planning
  2. Bill of Material and Job Accuracy
  3. Inventory Planning
  4. Real Time Reporting / Processing 

Need help figuring out how to become more efficient in each of these areas? Contact us, we’d be happy to help.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Actual Versus Standard

Anthony Etzel 0 53618 Article rating: No rating

Job costing based on standards is great, but what if reality doesn’t match up to that?

What if jobs are really taking twice as long, and you don’t know that? What if jobs are taking ½ as long as you think, but you’re scheduling based on how much time they “should” take? Either way, you’re losing money and productivity. Getting a handle on start/stop times for jobs, and therefore the total amount of time actually spent allows you to take proper action and be more productive.

 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Project Templates

Kathy Barthelt 0 196858 Article rating: No rating

Project templates are useful because you can specify all of the information that you would normally want to include when creating a new project such as project structure, budget and so on.

In Baan IV/V, project templates do not exist, but you can set up a project template by creating a regular project, and setting the status to simulated or free. This is done so that the project does not create plans. Under this scenario, you can easily copy one project to another.

In LN, when you create a new project, a template can be used as the starting point. This is similar to copying a normal project, but unlike normal projects, no costs or revenues can be posted on a template.

Optimize Your Manufacturing Today!

 

Infor LX and Crossroads MES Selected by Blonder Tongue

Crossroads RMC 0 34144 Article rating: No rating

Blonder Tongue, a global communication equipment supplier for TV broadcasters, cable system operator, lodging video, Internet system, and institutional systems, has selected Crossroads RMC to assist them with a BPCS 6.0.04 upgrade to Infor LX. Crossroads RMC will be providing all applications and technical consulting for this project. Also included as part of the project will be the implementation of the Crossroads MES solution. Go live for both solutions is expected in January of 2018.

BPCS/LX Tip of the Week: LX 8.3.5 Facility Period Close

Anthony Etzel 0 47940 Article rating: 5.0

The Facility Period Close process was introduced in Infor LX 8.3.4 and has been enhanced in 8.3.5. This feature allows continuous or 24-hour worldwide operations in multiple facilities to submit Period End Close jobs for each facility as daily operations cease, or shifts end.

This enhancement provides a batch mode for the Facility Period Close (INV930) process and allows the Update IIM Inventory from IWI (INV931) process to be submitted from the INV930B program. The enhancement also provides a batch mode for the INV931 process.

Optimize Your Manufacturing Today!

First96979899101103104105Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE: Copy Received Purchase Invoices (tfacp1210m000)

When the invoice is copied, the status in the Invoice Status field in the Received Purchase Invoices (tfacp1500m000) session is set to Registered. The invoice cannot be copied again.

Note: If you have started this session using the browse arrow, you can only find and select a record.

Field Information

  • Invoice-from Business Partner: The invoice-from business partner
  • Document - The document number: The document number is a sequence number under which the invoice is temporarily recorded. When an invoice is registered officially, you must assign the invoice to a different number, in combination with a transaction type.
  • Business Partner Invoice Number: The invoice-from business partner's invoice number is the invoice identification used in LN: This number is printed as the payment reference when the invoice is paid.
  • Invoice Date: The date printed on the invoice. This date is used as a reference date for the term of credit allowed.
  • Currency: The invoice currency
  • Amount: The invoice amount

OPERATIONS: Production Order Parameters

To avoid having to report quantities also at the order level, set the Post to Inventory when Reporting on Last Operation parameter to Yes in these sessions:

  • Production Order Parameters (tisfc0100s000) > Planning tab
  • Production Settings by Site (timfc0180m000) > Production Order tab

With regard to as-built handling, because JobControl acts as a reporting tool similar to the Machine Work List (tisfc4600m000) session, we recommend these settings in the Production Order Parameters (tisfc0100s000) session (Miscellaneous tab) and Production Settings by Site (timfc0180m000) session (Production Order tab):

  • In the Serials section, set the Generate Serial Numbers parameter to On Printing Documents or On Release as the serial number that can be selected in JobControl to report completed or rejected products must have the Valid status in LN.
  • In the Serials section, we recommend setting the As-Built Status Handling parameter to Manual as the serial number assignment is performed in JobControl.

TECHNOLOGY: Audit Configuration Management

You use LN audit features to fully or partially log changes that users make to the LN database tables when they use LN sessions.

The audit functionality is based on the concept of audit profiles. In an audit profile, you define which tables and fields are audited and when, in the context of an audit profile. To bundle profiles in the same functional area, you can relate the profiles to audit categories. You can export and import audit profiles with various options to enable a quick configuration. The audit trail is stored in sequence files, which are generated for each combination of company and table.

Note: For some important parameter tables it is required that auditing is enabled.

You can view or print the history of modifications.

Previous Article Infor LN & Baan Tips & Tricks for OPERATIONS: Blocking Operations
Next Article Infor LN & Baan Tips & Tricks for FINANCE: Copy Received Purchase Invoices (tfacp1210m000)
Print
88 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories