Baan/LN Tip of the Week: Why Would You Buy a BMW, But Use a Scooter?

Kathy Barthelt 0 75805 Article rating: No rating

Congratulations! You bought that shiny, new car! It has all the features you can possibly want and goes a million miles an hour. It can take you anywhere your heart desires…….but you rely on a manual scooter to get you around. You know, the kind you had when you were a kid…BEFORE you could drive…before you could afford the BMW. Make sense? Uh... no.

You’d never do this, right? So, why are you doing this with the ERP system that runs your business? Why are you relying on spreadsheets and separate little Access databases to record and store the information that is the most critical to your business when you have an ERP system that is meant for this? Why continue to plod along at a snail's pace when you have the tools to take your business to the next level?

Your ERP system is your BMW. Use it. See what it can do for you. Think you’ve used it to its potential? Unlikely. We’ve helped customers breathe new life into their EXISTING ERP version all by unlocking functionality for them that was already there and ready to use! We’ve also helped by offering add-ons to the ERP that can make your productivity skyrocket.

Ask us how. We’ve got an extra set of keys to the BMW in case you lost yours.

Optimize Your Manufacturing Today!

BPCS/LX TIP OF THE WEEK: 6 POWERFUL STEPS TO WIN WITH AUTOMATION:

Anthony Etzel 0 34038 Article rating: No rating
  1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     
  2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.
  3. Easy electronic scheduling by sequence and changing job priorities.
  4. Evaluate differences using actual times compared to standards.
  5. Improve data accuracy and eliminate the need to chase and fix errors.
  6. Practice real-time data reporting to monitor efficiencies and identify problems as they occur.

Baan/LN Tip of the Week: 6 Powerful Steps to Win With Automation:

Kathy Barthelt 0 75029 Article rating: No rating
  1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.  
  2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.
  3. Easy electronic scheduling by sequence and changing job priorities.
  4. Evaluate differences using actual times compared to standards.
  5. Improve data accuracy and eliminate the need to chase and fix errors.
  6. Practice real-time data reporting to monitor efficiencies and identify problems as they occur.

Duncan – Out With the Old In With the New… MES

Anthony Etzel 0 19398 Article rating: No rating
Duncan Enterprises, Inc., a leading designer, manufacturer, and distributor of ceramics, arts and crafts, fabric dying and painting products, fashion arts, and home decor DIY products, has selected Crossroads MES to implement throughout all of their shop floor departments and work centers. Through this implementation, Duncan intends to replace their existing Code Soft label software and Shop 2000 Reports. In addition, they expect to eliminate manual tracking of performance measurements and labor. With Crossroads MES, all shop floor paperwork will be distributed in a paperless fashion and all shop floor activities and production receipts will be captured. In addition, real time shop floor status information will be available for reporting across the enterprise.

Baan/LN Tip of the Week: Transaction Accounts – Commissions

Kathy Barthelt 0 78798 Article rating: No rating

In Baan IV, if a link with Financials exists for commissions and rebates, invoices are created directly in the Commission Control System (CMS) module and posted to Financials. As a result, users must specify the ledger accounts that are used for posting commissions and rebates in the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session.

In LN, the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session is removed from the Commission Control System (CMS) module, because invoices are no longer created directly in the Commission Control System module.

BPCS/LX Tip of the Week: Vendor Maintenance Security Option for Company or Program

Anthony Etzel 0 40776 Article rating: No rating

The Vendor Maintenance Security option is in the Purchasing System Parameters program(PUR820D). The purpose of this program is to provide an additional security option for VendorMaster Maintenance. To access this program, the user selects the Parameters Generation option from the System Functions menu, SYS500. The user can modify the Vendor Maintenance Security parameter from PUR820D-04 in the Purchasing System Parameters program.This feature provides an additional security parameter for Vendor Master Maintenance.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: 6 Powerful Steps to Win With Automation

Anthony Etzel 0 37258 Article rating: No rating

1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.  

2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.

3. Easy electronic scheduling by sequence and changing job priorities.

4. Evaluate differences using actual times compared to standards.

5. Improve data accuracy and eliminate the need to chase and fix errors.

6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: GRINYA Reconciliation – What Could Go Wrong?

Kathy Barthelt 0 80100 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan or LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

To ensure, it’s recommended that the Integrations Setup tables should be audited either through Baan/LN or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Optimize Your Manufacturing Today!

First9091929395979899Last

Tips:  LX | BPCS | M3

Anthony Etzel
/ Categories: Infor LX & BPCS Tips

BPCS/LX Tip of the Week: Shop Order Status

You can see the status of the Shop Order when using SFC300 Shop Order Inquiry. You want to be sure that your shop orders are at the correct status in order to report against them.

The following are the shop order status codes:

04 = The Shop order has been entered.

05 = The Shop order has been released and printed.

14 = The Shop order has been released, but not printed. If a shop order is at this status, you have released it and it is not printed due to a system failure, or the order has been put on hold.

XX = The Shop order is closed.

Previous Article BPCS/LX Tip of the Week: Work Center & Machine Locations
Next Article BPCS/LX Tip of the Week: Indirect Labor Reporting
Print
86685 Rate this article:
No rating

Contact

Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Contact author

x

Tips: LN | Baan

Note: The Blocked Operations (tisfc0540m000) session displays the blocked operations.

Introduction

Sometimes a problem occurs that must be solved before an operation proceeds. Examples of such situations are:

  • The quality of an intermediate product must first be inspected.
  • A machine is in repair.
  • A supplier cannot deliver an essential component in time.
  • A customer is late with its payments.

In these situations the operation can get the operation status Blocked.

An operation can be blocked:

  • Manually.
  • Automatically by Quality.

Blocking reasons

Every blocked operation must have a blocking reason. The blocking reason of a blocked operation has two purposes:

  • To indicate why the operation is blocked.
  • To determine which actions you can no longer perform on the operation.

Types of blocking

The following actions can be blocked by means of a blocking reason:

  • Reporting a quantity completed.
  • Reporting a quantity rejected.
  • Reporting a quantity to be inspected.
  • Reporting an operation completed.

You normally carry out these actions in the Report Operations Completed (tisfc0130m000) session.

You can define blocking reasons in the Blocking Reasons (tisfc2100m000) session.

Manual blocking

Use the Report Operations Completed (tisfc0130m000) session to block an operation. When you block an operation, you must also enter a blocking reason. If Quality has already blocked the operation, you can only enter a blocking reason, which is more restrictive than the blocking reason of Quality.

Blocking by Quality Managem