Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Baan/LN Tip of the Week: What Could go Wrong With GRINYA?

Kathy Barthelt 0 171615 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan/LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

It is recommended that the Integrations Setup tables be audited either through Baan or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Still have GRINYA questions you need answered?
Contact us. We’d be happy to help.

Optimize Your Manufacturing Today!
 

BPCS/LX Tip of the Week: Efficiency– The What & How

Anthony Etzel 0 50322 Article rating: No rating

Efficiency is something we all strive for in our personal lives and at work. How can manufacturers increase their efficiency? Take a hard look at the 4 key areas:

  1. Planning
  2. Bill of Material and Job Accuracy
  3. Inventory Planning
  4. Real Time Reporting / Processing 

Need help figuring out how to become more efficient in each of these areas? Contact us, we’d be happy to help.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Actual Versus Standard

Anthony Etzel 0 51350 Article rating: No rating

Job costing based on standards is great, but what if reality doesn’t match up to that?

What if jobs are really taking twice as long, and you don’t know that? What if jobs are taking ½ as long as you think, but you’re scheduling based on how much time they “should” take? Either way, you’re losing money and productivity. Getting a handle on start/stop times for jobs, and therefore the total amount of time actually spent allows you to take proper action and be more productive.

 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Project Templates

Kathy Barthelt 0 189842 Article rating: No rating

Project templates are useful because you can specify all of the information that you would normally want to include when creating a new project such as project structure, budget and so on.

In Baan IV/V, project templates do not exist, but you can set up a project template by creating a regular project, and setting the status to simulated or free. This is done so that the project does not create plans. Under this scenario, you can easily copy one project to another.

In LN, when you create a new project, a template can be used as the starting point. This is similar to copying a normal project, but unlike normal projects, no costs or revenues can be posted on a template.

Optimize Your Manufacturing Today!

 

Infor LX and Crossroads MES Selected by Blonder Tongue

Crossroads RMC 0 33054 Article rating: No rating

Blonder Tongue, a global communication equipment supplier for TV broadcasters, cable system operator, lodging video, Internet system, and institutional systems, has selected Crossroads RMC to assist them with a BPCS 6.0.04 upgrade to Infor LX. Crossroads RMC will be providing all applications and technical consulting for this project. Also included as part of the project will be the implementation of the Crossroads MES solution. Go live for both solutions is expected in January of 2018.

BPCS/LX Tip of the Week: LX 8.3.5 Facility Period Close

Anthony Etzel 0 44376 Article rating: 5.0

The Facility Period Close process was introduced in Infor LX 8.3.4 and has been enhanced in 8.3.5. This feature allows continuous or 24-hour worldwide operations in multiple facilities to submit Period End Close jobs for each facility as daily operations cease, or shifts end.

This enhancement provides a batch mode for the Facility Period Close (INV930) process and allows the Update IIM Inventory from IWI (INV931) process to be submitted from the INV930B program. The enhancement also provides a batch mode for the INV931 process.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Order Series Full – Switching to a Different Series

Kathy Barthelt 0 158238 Article rating: 5.0

In general, you can enter a different series in the order field if you have an available series.

To add a new series, find the appropriate group in the First Free Number session, and add a new series and first free number (usually 1).

In Baan IV, go to the Maintain First Free Numbers Session (under Common, Tables, Maintain Logistics Tables, Maintenance 1).
Groups are easily identified (e.g., Purchase Order, Sales Order, etc.).

In Baan V, go to the First Free Number Session (under Common Data, Tables, Logistics). There are number groups (e.g., 570 may be for Purchase Orders, 650 may be for Sales Orders, etc.).

In LN, go to the First Free Number Session (tcmcs0150m000 – it is in different places in the menu under different Feature Packs). There are number groups (e.g., 210 may be for Purchase Orders, 310 may be for Sales Orders, etc.).

BPCS/LX Tip of the Week: Revisit The Last Brilliant Idea

Anthony Etzel 0 47597 Article rating: No rating

Sometimes the best ideas have to be tabled due to competing priorities. That doesn’t mean that the idea was bad. Revisit previously suggested cost savings ideas, or ideas to make a manual process more efficient. Now could be the right time to do something great!

Optimize Your Manufacturing Today!

First8586878890929394Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for TECHNOLOGY: Archiving Concept

Companies are developing procedures for entering data into an ERP system and for archiving manuals, drawings, specs, and other hard-copy documents. However, in many cases there is no defined procedures to store historical electronic data. Archiving electronic data should be an integral part of your business processes. 

Generally, archiving is the process of moving historical data from the operational environment to a special archive environment. At home, you might move old bank statements from a closet in your study to a box in the attic. At the office, you might store old hard copies of purchase orders in a room far from your own desk. Just because you no longer need the information in your daily work, does not mean you can dispose of the information. In terms of electronic data in your ERP system, archiving means moving historic data from the operational company to a special archive company; in that way, the historic data will be out of your way and safely stored. To free up disk space on your machine after you have archived the data, you can also move the historic data to an external medium.

Archiving strategy:
Archiving historical data is an irreversible process. After data is moved to the archive company, the data can no longer be uploaded back into the operational company. Archiving has a direct effect on the accessibility and availability of information; therefore, you must define a robust archiving strategy which addresses three major topics: What, When, and Who.

Business requirements:
Your business requirements determine what must be stored and for how long. For example, if you have a warranty situation on your projects for five years, you might be required to keep your project open during this time, or you may keep the project in an archive company. Therefore, if the project must remain open, no project-related information, including orders and integration transactions, can be archived.

Every business manager must decide how long what data must be stored in an operational environment for quick access. Reporting requirements must also be listed.

Legal requirements:
In most countries, legal requirements apply to financial data. Tax authorities may require financial data to be stored for a minimum number of years. Additionally, in specific lines of business such as food and beverages or aerospace, governments maintain specific legal requirements, which impact your archiving strategy.

User requirements:
Users rely on historical information. For example, a customer service employee may need to have shipment information of up to one year in the past to accurately address customer queries. These requirements must also be taken into account when you define what can be archived.

Data to be archived or deleted:
Various parties related to your company use information based on logistical and financial transactions occurring in the past. Before you archive or delete this information, you must investigate the need for the information.

Your ERP system contains standard archiving sessions in all major modules. These sessions are designed to copy historical data to the archive company, and then delete the data from the operational company. 

You have three options in archiving sessions:

  1. Archiving and deleting: Data is transferred to the archive company and then deleted in the operational company.

  2. Deleting: Data is deleted in the operational company, but not archived.

  3. Archiving: Data is transferred to the archive company, but not deleted in the operational company.

Using option 1 or 2 makes archiving irreversible. If you archive only because you want to preview the results, the archiving can be done a number of times.

Usually, in archiving sessions, you can also specify:

  • The date up to which the data must be archived
  • If texts must also be archived
  • If texts that already exist in the archive company must be replaced

In addition to archiving logistical and financial data, you can archive general data. 

Delete sessions:
In all major modules, your ERP system contains delete sessions. These sessions only have delete functionality, no archive functionality. Consequently, they are used to clean up data in the operational company, not to transfer data to the archive company. For more information about these delete sessions, see the "Delete sessions" sections under the various modules. For example, see Delete sessions under Procurement.

After data is deleted using delete sessions, the data is no longer available in the operational company. However, parameter settings may determine whether history data is logged when you remove specific data. If required, you can archive the history using the appropriate archiving session.

When can data be archived?
Based on the answers to the previous question, you can now set a term of retaining relevant historical data in your operational environment, and a term of keeping data available in the archive environment.

Who can archive data?
Because archiving is an irreversible process, a certain risk is involved. For example, what if one of your employees starts up an archiving session by mistake? For this reason, you must determine who is authorized to archive and delete data, and then set up these authorizations with the functionality your ERP system offers.

Because no further changes must be made to archived data, access to the archive company must also be restricted to read-only authorization for most users.

Match strategy with ERP functionality: 
After you list all your requirements, the next step is to verify whether the standard ERP functionality is sufficient to facilitate your needs. Usually, your ERP system provides the functionality to meet all of your needs, but must not force you to compromise. We recommend that you avoid customizing your software, however, because we are looking for long-term operational-data storage, customizations must not be ruled out entirely. An example is the requirement to show, in one report, the data from the operational company and archive company. In the current version, this is not standard functionality, but this can be important to manage your business. What can be even more important, if you are using customized software, is the question of whether the archiving sessions have been included. Do you take into account the fields and tables you have customized? Customized tables and fields may have to be included when performing delete/archive runs.

Archiving plan:
After you define an archiving strategy that suits your requirements, you can define the archiving plan. In this plan, you translate the strategy to a more operational level.

Contact Crossroads RMC— Let's take the next step together to execute your archiving plan.

800.762.2077

Previous Article Infor LN & Baan Tips & Tricks for OPERATIONS: Blocking or Unblocking Warehouses
Next Article Infor LN & Baan Tips & Tricks for FINANCE: Remap Posted Integration Transactions (tfgld4282m100)
Print
44056 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories