Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: 6 Powerful Steps to Win With Automation

Anthony Etzel 0 34964 Article rating: No rating

1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.  

2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.

3. Easy electronic scheduling by sequence and changing job priorities.

4. Evaluate differences using actual times compared to standards.

5. Improve data accuracy and eliminate the need to chase and fix errors.

6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: GRINYA Reconciliation – What Could Go Wrong?

Kathy Barthelt 0 78018 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan or LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

To ensure, it’s recommended that the Integrations Setup tables should be audited either through Baan/LN or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Purchase Order Receive All Processing

Anthony Etzel 0 28830 Article rating: No rating

With this enhancement, the Purchase Receipts screens are optionally shown with the quantity and weight fields populated with the open value on the purchase order.

Previously the user had tomanually enter the quantity received or, for a dynamic weight and measure items, the weightreceived for each line on the purchase order.

Now the screens are populated with the open valueand if the open value is the same as the value received, the user can simply accept the line.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: 4 Reasons You Need Timely & Accurate Data

Kathy Barthelt 0 74695 Article rating: No rating

Seems obvious – you want real time data and you want it to be accurate. Do you have the systems in place to allow for this?

Here are 4 reasons you need a data collection system:

  1. See the differences between actuals and standards
  2. Determine the source of project overruns
  3. Prevent mis-shipments to customers
  4. Avoid unnecessary reordering of parts

An automated data collection system will analyze your current data, allowing you to efficiently optimize your manufacturing and the benefits will be huge and far reaching.

Optimize Your Manufacturing Today!

Blonder Tongue Looks for Success on LX With Crossroads MES

Anthony Etzel 0 30450 Article rating: No rating

Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.

Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.  

Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.  
Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.  
Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements com

BPCS/LX Tip of the Week: Estimates Versus Actuals

Anthony Etzel 0 32585 Article rating: No rating

So, how many of you have updated the estimated cost of material and labor in your ERP system recently? ……Hmmmm. That’s what I thought.

Do you have any idea how accurate those numbers are? Are you making business decisions based on estimates that are completely inaccurate?

Consider switching from estimates to actuals. Furthermore, consider implementing an automated data collection system to make this easy. By collecting production and labor data real time, you can gain real insight into your business and you gain the ability to look at the profitability of individual jobs, projects and employees.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Estimates Versus Actuals

Kathy Barthelt 0 79649 Article rating: 5.0

So, how many of you have updated the estimated cost of material and labor in your ERP system recently? ……Hmmmm. That’s what I thought.

Do you have any idea how accurate those numbers are? Are you making business decisions based on estimates that are completely inaccurate?

Consider switching from estimates to actuals. Furthermore, consider implementing an automated data collection system to make this easy. By collecting production and labor data real time, you can gain real insight into your business and you gain the ability to look at the profitability of individual jobs, projects and employees.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: 4 Benefits to Consider - Cross-Docking

Kathy Barthelt 0 78026 Article rating: No rating

Cross Docking is the practice of immediately processing completed goods to fulfill ‘demand’ requests with minimal handling. Cross Docking automatically combines and performs Baan / Infor LN steps to fill demand and shortages at the time items are available. Shortages are sorted and filled by the oldest demand date.

Benefits of Cross Docking include:

  • Direct and indirect labor savings resulting from operational efficiencies gains
  • Increased inventory accuracy, reliable on-hand inventory information and improved data entry
  • Increased productivity
  • Increased customer retention due to faster, more accurate fulfillment

Optimize Your Manufacturing Today!

First8182838486888990Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Materials Tips: Serialized and Lot Controlled Items

Serial and Lot are additional characteristics/properties of Items that can be used to uniquely or collectively identify and track the item along with its Item code. Any Item can be made as Serialized and/or Lot controlled by choosing options "Serialized" and "Lot Controlled" in Items-General session under traceability section on the Details tab.

Further in Items-Warehousing data under the Identification tab, you can enable "Lot Tracking", "Lot in Inventory", "Serial Tracking" and "Serial in Inventory" which enables tracking of the Items. You can also define if the Item is "Serial/Lot not in inventory" then where you want to record the serial and lot details in the transactions like "Direct Delivery", "Receipt", "Transfer", "Register during As-Built, Service and Maintenance".

Below are some topics related to Serialized and Lot Controlled Items that will be useful:

Convert non-Serialized Item to Serialized and non-Lot Controlled item to Lot Controlled and Vice Versa

If Item is created as non-Serialized and/or non-Lot controlled... To change them to Serialized or Lot Controlled, here are some standard Sessions that can be used:

1.Convert (to) Serialized Item (whltc5201m000) can also be accessed from Item-Serials and Warehouses session's Specific Menu.

Note: Once Item is marked or converted as Serialized, it is not possible to revert the item to non-Serialized Items using this session. If any Item has to be converted to non-Serialized, then some Knowledge articles are available to show workaround steps.

2. Convert (to) Lot Item (whltc1202m000) can also be accessed from Item-Lot session's Specific Menu.


Related KB Articles:

2121795 - Item non-Serialized (Not Serial In Inventory) to Serialized (Serial In Inventory) Conversion.
692338 - Is it possible to convert a Serialized Controlled Item into a Not Serialized Controlled Item?
2057953 - Unable to convert a Lot Item to Serialized Item.
723772 - Blocking Message when Trying to Change a Non-Serialized Item to a Serialized Item.
1960873 - Register Serial Issue During As-Built Automatically Set after Converting to Serialized Item.
1134182 - Convert Item to Lot Controlled.
2084394 - Not able to convert Not Lot Controlled Item to Lot in Inventory.
1634725 - Procedure to covert (to) Lot Item (WHLTC1202M000) without using mask.
1009296 - Convert to LOT Item triggered multiple lot numbers. What is the logic behind?
1968968 - Lot Price Not Set after Conversion from Not Lot Controlled to Lot Controlled.
1852794 - Change Lot Type of an Existing Lot.
1634723 - How to enable "Lot" field in the session "Convert (to) Lot Item (whltc1202m000)".

Previous Article Infor LN & Baan Tip: Can You Backflush An Item If Estimated Quantity is Zero?
Next Article Infor LN & Baan Tip: Latest Porting Set – All Versions of Infor LN & Baan
Print
70166 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories