Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Baan/LN Tip: New Mapping Scheme

Kathy Barthelt 0 84703 Article rating: 5.0
After a new mapping scheme is copied from an existing one, it is possible to check transactions in a simulation mode, before activating the new scheme. However, before the simulation can take place, the new mapping scheme needs to have completed the “Check Mapping Scheme” step. When the check is completed, a transaction can be simulated by highlighting it and from the Specific menu, selecting “Map with Specific Mapping Scheme.” Any errors can be corrected without having to activate the new mapping scheme.

Anthony Etzel- Featured Speaker at inPower 2019

Anthony Etzel 0 29959 Article rating: 4.5

Infor IDF is replacing green screens for inquiries and release LX 8.4 for file maintenance. This session will show you how to use IDF over your non-LX file. 
 

Many Companies have IDF and are not effectively using it. This session will cover:

  • Building a business object (Intergrator) 
    • How to create a logical expression
    • How to make a field a maintainable field with IDF
  • Views 
    • How to create custom views
    • How to navigate in IDF and create search subsets

Pushing Forward In the Face of Adversity. Soundview recently suffered a major loss when fire struck on January 30, 2019.

Crossroads RMC 0 23717 Article rating: 5.0

Soundview Paper lost their main building when disaster struck. This building housed offices, their computer center and part of their manufacturing facility. The loss including hardware, networks, system data backups, etc. Crossroads RMC was contacted immediately to assist in the recovery of their BPCS V6 system. With limited backups and a full team effort, Crossroads RMC assisted in the acquisition of new hardware and are currently in the midst of helping to bring their system back to life. Soundview has secured support from various partners to make all this happen, and we are privileged to be part of the team. A lot of work has been done so far, but we have a long road ahead. Users will soon regain access by the end of this week,  and as required, Crossroads RMC will provide the necessary consulting support from our LX team to get Soundview back up and running. We are communicating with them daily, as we work thru this process.

BPCS/LX Tip of the Week: Facility Period Close

Anthony Etzel 0 59784 Article rating: No rating

The Facility Period Close process, as introduced in Infor LX 8.3.4, was designed to function interactively. 

The expectation was that clients with a continuous or 24-hour worldwide operation in multiple facilities would submit the Period End Close jobs for each facility as daily operations ceased or shifts ended for each facility. This process was designed to function interactively so that validations of users performing transactions that conflicted with period end processing, and resulting messages, were immediately sent to the period end user. 

This enhancement provides a batch mode for the Facility Period Close (INV930) process and allows the Update IIM Inventory from IWI (INV931) process to be submitted from the INV930B program. The enhancement also provides a batch mode for the INV931 process. For example, a user has a 24-hour operation in facilities around the world, but a centralized IT operation. With this enhancement the user can submit the individual facilities to be closed to a batch process that can be managed by a scheduler, automatically releasing each facility to be closed at a predetermined time.

Flexfab Expands Their Use of Crossroads RMC Data Collection for All LN Installations Globally

Data Collection News

Kathy Barthelt 0 28979 Article rating: 5.0

Flexfab Horizons International, Inc, a global leader in the manufacture of high performance silicone and other advanced polimer products, has made the decision to expand their use of Crossroads RMC’s Data Collection Solution, RMC3, to their China location. The initial implementations in Nottinghamshire, UK and the United States took place in 2018, and the China implementation is expected to be completed by Q2 of 2019. All installations focus on improvements in warehouse management in Infor LN. Applications implemented include Receiving, Inspections/Approvals, Putaway, Stock Transfers and Stock Inquiry.

Crossroads RMC partnered with Electrolux Corporation to Connect Baan IVc4 to Vertex 8.0 (O Series)

Vertex Q to Vertex O… the ABC’s of tying this to Baan IV

Kathy Barthelt 0 25124 Article rating: No rating

Crossroads RMC partnered with Electrolux Corporation to Connect Baan IVc4 to Vertex 8.0 (O Series), and was able to successfully complete this project in under 3 months. This project was completed using Crossroads RMCconnector as a web service to read the Vertex tax data and pass the information back into Baan for further processing. Triggers were created to handle the following processes:

  • Sales Order Lines
  • Print/Reprint Order Acknowledgement
  • Print Sales Invoice (Both compose and final)
  • Purchase Order Lines
  • Purchase order Acknowledgement
  • Purchase Order invoice
  • Manual Finance Invoice (Compose, print and post)
  • Post Integration transactions
  • Finalize batch

Nazdaq has released Version 3.0 of B2Win Suite

Partner News

Kathy Barthelt 0 39364 Article rating: No rating

New Release of B2Win Suite: Format customer reports, email documents to your suppliers and customers, and more! 

New features – B2Win Suite - You are no longer limited to the data that comes from your canned reports! You can now add new columns to your already existing reports in Excel, based on SQL commands that bring additional data from any database (ERP or other), based on values from the report.

Existing Nazdaq customers should contact us to learn how we can convert your software to the latest and greatest Nazdaq product suite!

For more information: watch our webinar:

Webinar Recording: 48:18

Crossroads is proud to work with Johnson Crushers International on their LN re-implementation to 10.6

Kathy Barthelt 0 20089 Article rating: 5.0

Johnson Crushers International (JCI), a global leader in engineering and manufacturing full lines of cone crushers, horizontal and incline vibrating screens and track-mounted, portable and stationary crushing and screening plants, has selected Crossroads RMC to help them re-implement Infor LN on 10.6.  JCI’s main objectives with this project are to support their continued growth, align and standardize their business processes, and enable a continuous improvement effort to drive additional value to the business. Go live is expected to occur in early Q1 of 2020.

First8182838486888990Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE: Currency Differences

When currency differences are posted, several parameters affect the way the entries in the General Ledger are created. This section explains the possible parameter settings:

  1. Ledger accounts by currency

  2. Writing off currency profits

  3. Fixed exchange rate

  4. Writing off currency differences for anticipated payments


1. Ledger accounts by currency
This parameter is recorded in the Finance Company Parameters (tfgld0503m000) session.

If the Ledger Accounts Currency Differences by Currency check box is selected, the (un)realized currency differences are posted to the ledger accounts defined in the Currency Difference Ledger Accounts by Currency (tfgld0119s000) session.

LN retrieves the related dimensions from these sessions:

  • General Ledger: Finance Company Parameters (tfgld0503m000)

  • Accounts Payable: Ledger Accounts by Business Partner Group (tfacp0111m000)

  • ACR: Ledger Accounts by Business Partner Group (tfacr0111m000)

If the Ledger Accounts Currency Differences by Currency check box is cleared, the currency differences are posted to:

  • General Ledger: the ledger accounts specified in the Finance Company Parameters (tfgld0503m000) session.

  • Accounts Payable/ Accounts Receivable: the ledger accounts recorded for the business partner group.


2. Writing off currency profits
This parameter is defined in one of these sessions:

  • ACP Parameters (tfacp0100m000)

  • ACR Parameters (tfacr0100s000)

If the Currency Profits check box is selected, the unrealized currency profits are posted as well as the unrealized currency losses. Unrealized currency losses are always posted when writing off currency differences.

3. Fixed exchange rates
For each invoice, the rate determiner defines:

  • Which date is used to determine the exchange rate.

  • If currency differences are calculated.

  • For which (home) currencies the currency differences are calculated.

The Rate Determiner is set in the Sales Invoices (tfacr1110s000) session or the Purchase Invoice Entry (tfacp2600m000) session.

Unrealized currency differences are written off in one of these sessions:

  • Write Off Currency Differences (tfacp2240m000)

  • Write Off Currency Differences (tfacr2250m000)

4. Writing off currency differences for anticipated payments
This parameter is defined in one of these sessions:

  • ACP Parameters (tfacp0100m000)

  • ACR Parameters (tfacr0100s000)

If the Currency Difference Anticipated Payments check box is selected, invoices with anticipated payments or anticipated receipts are considered for writing off currency differences.

OPERATIONS: Pegging Material Supply Lines for Operation and Product Subcontracting

For project pegged production orders, operations can be subcontracted. The material delivered to the subcontractor can be project pegged or anonymous. The subassemblies that are sent and retrieved are always project pegged. Costing breaks can apply to direct the costs of the subcontracted operation to a specific project cost account. If (production material) costing breaks are used, a purchase order line's peg can differ from the peg on the material supply line.

For product subcontracting, the subcontracted purchase orders can include materials that inherit the project pegs, or can include anonymous materials. The pegged materials are stored in inventory and are shipped to the subcontractor with project pegged orders.

In case of a project pegged order, a peg distribution is linked to the Purchase Order Material Supply Line in the Purchase Peg Distribution (tdpur5100m000) session. For a specific purchase order line (detail) and material sequence, the material supply line's Order and Consumption quantities are distributed across the peg distribution lines for combinations of project/budget, project element, and/or project activity. The peg information in the Purchase Peg Distribution (tdpur5100m000) session includes the line number for the peg in the distribution, the peg (project, element, activity), and the material supply line quantity by peg. The peg distribution cannot be manually created and must always be generated using the parent.

For operation subcontracting, the purchase order line, the material supply line, and the linked peg distributions are generated by Job Shop Control and can only be updated by Job Shop Control.

For product subcontracting, the purchase order line, the material supply line, and the peg distributions are generated by Procurement. A material supply line's peg distribution can be updated only from the parent, that is the purchase order line, the purchase order line peg distribution, or the material supply line. If a purchase order line's distribution line is changed, and no quantities are received or consumed yet, the pegged fields on the linked material supply lines are synchronized to the updated distribution line in the Purchase Order Material Supply Lines (tdpur4116m000) session. However, if a different quantity distribution is applicable, the quantities of the material supply lines' distribution lines are redetermined in the Purchase Peg Distribution (tdpur5100m000) session.


TECHNOLOGY: Load Audit Tables for Profile (ttaud3220s000)

Use this session to load tables for an audit profile.

Usually this session is run from the Specific menu of the Audit Tables by Profile (ttaud3120m000) session. The selected profile in that session is displayed in the first line of the current session.

The result of loading the tables depends on the selection level you use in the current session. For each element on the lowest selection level, a line is created in the Audit Tables by Profile (ttaud3120m000) session. For example, if you select a package and a number of modules, a line is created for each module. Because you did not specify the tables, the All check box is selected.

Field Information

  • Profile: The audit profile for which the tables are loaded.
    Note: If you start the current session from the appropriate menu of the Audit Tables by Profile (ttaud3120m000), the profile displayed is the profile that is selected in that session.
  • Package: The package that contains the tables you want to load.
  • Module: The module that contains the tables you want to load.
  • Table: The tables you want to load.
  • Audit Type: The audit type that must be set for the tables that are loaded.
    Note: You can either select Always, or Changed. However, it is also possible to determine the audit type per field. This is the Not Applicable option in the Audit Tables by Profile (ttaud3120m000) session. If you want to set the audit type per field, you must change the audit type to Not Applicable after the tables are downloaded, and then specify the audit type per field in the Audit Fields by Table (ttaud3125m000) session.

Previous Article Infor LN & Baan Tips & Tricks for OPERATIONS: Subcontracting Overview
Next Article Infor LN & Baan Tips & Tricks for FINANCE: Currency Differences
Print
1910 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories