Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Purchase Order Receive All Processing

Anthony Etzel 0 61225 Article rating: 5.0

With this enhancement the Purchase Receipts screens are optionally shown with the quantity and weight fields populated with the open value on the purchase order. The screens are now populated with the open value and if the open value is the same as the value received, the user can simply accept the line. The Receive All field on the PUR550D1-01 screen determines whether the receipt lines are populated with the open value. A system parameter controls the Receive All default value but the default value can be overridden.  

If this option is selected, the user does not have to enter the open quantity or weight. If the purchase order receipt has many lines, this option saves time and prevents errors.

Data Collection: Are you able to perform a full cycle count of your inventory in one day?

Kathy Barthelt 0 76915 Article rating: 5.0

Cycle Counting Potential Benefits: 

  • Overall increased inventory accuracy
  • Increased accuracy of count
  • Ability to review and approve count before direct update of Baan / Infor LN tables
  • Elimination of unnecessary re-orders of items with current inventory Greater ability to satisfy customer orders due to greater visibility to (accurate) inventory levels
  • Direct labor cost savings – less staff required for count Increased productivity during count – with some of our customers, counts used to take weeks. They can now complete a count of their entire inventory in one day.
Contact us today to learn more

BPCS / LX Tip of the Week: Purchase Order Print Security Validation

Anthony Etzel 0 60017 Article rating: 5.0

This enhancement allows users to restrict access to purchase order print programs. The purchase order print programs were updated to provide security validation for the user who selects the purchase orders to print. The security validation is controlled by the PO Print Security Validation flag on the Purchasing System Parameters screen, PUR820D-04. This enhancement gives users the option to restrict access to purchase order print programs, providing additional security at the company and warehouse levels.

Infor LN & Baan: Need Accurate Inventory?

Kathy Barthelt 0 72824 Article rating: 5.0

Automate & Streamline Your Current Processes

We know that efficiency is the name of the game and Crossroads RMC has helped manufacturers achieve real results:

  • Better inventory management
  • Increased visibility
  • Reduced operational costs
  • Increased accuracy and much more

Crossroads RMC has solutions to automate and streamline your current processes from receiving all the way through shipping. Work with Crossroads RMC and realize greater benefits from your CURRENT ERP version.

Get Started

Crossroads RMC to integrate their Baan IV system with all Subway Restaurants and Moe’s Southwest Grill locations nationwide to provide streamlined parts and machine ordering capability

Kathy Barthelt 0 37372 Article rating: 5.0
Grindmaster Cecilware, a leader in the development of products for the food and beverage industry, has selected Crossroads RMC to integrate their Baan IV system to provide streamlined parts and machine ordering capability for all Subway Restaurants and Moe’s Southwest Grill locations nationwide. The integration will allow for orders to automatically feed back into the Baan IV system for further review and processing. The integration is expected to go live in Q2 of 2019.

Baan / LN tip of the Week: approving a new tax code

Kathy Barthelt 0 107654 Article rating: 5.0

Prior to approving a new tax code, the system displays a message, “An approved tax code cannot be changed anymore. Continue?” This is concerning to end users if they take the message literally. The user can answer “Yes” to the question as it refers to the tax details, not the rates or ledger accounts. A user can always change the tax rate and ledger accounts after it has been approved. All taxing authorities change rates periodically, so it is logical that these could be updated as needed.

First8081828385878889Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Previous Article Infor LN & Baan Tip of the Week LN 10.7 - Draft Printing
Next Article Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant
Print
106553 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories