Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Does your existing data collection equipment and barcode label printers need some love and attention?

Kathy Barthelt 0 33203 Article rating: 5.0

Crossroads RMC knows that new equipment is not something that everyone can or wants to include in their budget. Sometimes you need to make due with what you have. We are proud to partner with a local company that repairs existing data collection equipment, and sells refurbished devices as well.

Want to bring a little life back into your equipment and extend their use? Contact us today to see if your data collection equipment can be given new life! 

Kathy Barthelt – VP Sales
Crossroads RMC
Phone: 1.630.955.1310, x113 | Cell: 1.630.408.7759
kbarthelt@crossroadsrmc.com

Do you have spreadsheets and separate databases that may or may not be tied to Baan/LN?

Kathy Barthelt 0 36598 Article rating: 5.0

Do you have spreadsheets and separate databases that you’re keeping on the side that may or may not be tied to Baan/LN?

-Do you wish they were integrated so that you didn’t have to manually go into each system to report on the data or look up information? 
-Are you running into problems because you don’t have exposure to all of the data that is critical to running your business?

Crossroads RMC has a team of integration experts who can create the integration you’ve been dreaming about… AND we have developed RMCconnector to allow for quick and easy translation data from your front end system into a format accepted by your back end ERP. 

Learn More

Baan/LN Tip: Saving Space in Your General Ledger

Kathy Barthelt 0 77772 Article rating: 5.0

Compressing Integration Transactions

One way to save space in your general ledger is to compress integration transactions. The transactions are combined into one ledger account number. However, the detail is still available in the integration transactions sessions.

The compression is seen after the transactions are finalized. 

Compression is established in the mapping scheme by checking the box under the columns “Compression of Debit/Credit Transactions". This can only be done in a mapping scheme that is not activated. 

BPCS/LX Tip: Backup and Save options

Anthony Etzel 0 55460 Article rating: No rating

Users are no longer limited to backing up or saving files to a tape or diskette.They can now use a Save File (SAVF) to save data and objects. LX programs that perform saves and/or backups were modernized to add a new SAVF option.  

There were numerous places in LX where users are prompted to save a file or library. These screens have options for tape or diskette. Diskette refers to the old 8” diskettes used on System/38. These devices are outdated and virtually obsolete. The current means of saving objects on the IBM i, is through the use of a Save File (SAVF). This compresses the data into a single object that can be saved and is easily transferred between systems.

These objects were modified and/or created for this enhancement:

  • Backup Simulation (FOR630C, FOR630D, FOR630FM, FOR640HT, and FOR630HT)
  • Month End Close (INV903D, INV903FM, INV901C, and INV903HT)
  • Purge YTH/Restore Archived Lots (INV912C, INV912D, INV912DHT, and INV912FM)
  • Purge and Save ITH records (INV932C, INV932D, INV932FM, and INV932HT)
  • Labor Ticket Save (SFC905D, SFC905FM, SFC901C, and SFC905HT)
  • Backup Infor LX Files (SYS700C, SYS700D, SYS700FM, and SYS700HT)
  • Backup Infor LX Programs (SYS710C, SYS710D, SYS710FM, and SYS710HT)
  • Backup Infor LX Source (SYS740C, SYS740D, SYS740FM, and SYS740HT)
  • Save File Name Selection (SYS912D, SYS912FM, and SYS912HT)


Benefit

Use the Backup Simulation to copy a simulation file to a SAVF or tape. Users may want to do this to transfer simulation data from one system to another, from site to site, or to save the data before permanently deleting it from the system.

Navistar goes global with Crossroads RMC!

Kathy Barthelt 0 26662 Article rating: 4.7

Navistar, a leading manufacturer of commercial trucks, buses, defense vehicles, and engines, has selected Crossroads RMC’s data collection middleware to use for their global data collection solution. Implementation began in late 2018 with Navistar’s Illinois facility and will be completed in all other divisions by the end of 2019.

Don’t Let Malware Destroy Your ERP System!

Crossroads RMC 0 23579 Article rating: 5.0

We just got a report that another one of our customers has been affected by malware. In this case it wiped out their ERP server. We are working with them to restore it an get everything up and running again. It is highly likely that this got into their network by an email attachment. This seemed like a good opportunity to remind everyone to be extremely careful with email attachments. Even if it appears to be from someone that you know, email “From” addresses can be forged.

Best practice is to save the attachment to a folder, and run a virus scan before opening or viewing the file.

Baan/LN Tip: Credit Control Parameters (ACR Parameters)

Kathy Barthelt 0 80073 Article rating: 5.0

In the Credit Control Parameters, you can indicate if the same letter will be sent for reminding and action taken if amounts are zero or negative. The reminder letters work in conjunction with overdue sales invoices and the “Reminder Diary Margin.” When an invoice has passed its due date plus a certain margin of days, LN generates a reminder advice for the invoice. 

Crossroads Welcomes Ridewell Corporation – MES for Infor LX

Anthony Etzel 0 27059 Article rating: 5.0

Crossroads RMC welcomes Ridewell Corporation as our newest client having selected Crossroads MES (Manufacturing Execution System) for their shop floor automation with integration to Infor LX. 

Ridewell engineers and manufactures air-ride, rubber-ride, steel spring and mechanical suspension systems for the truck, trailer, RV and bus industries. The company has served the transportation industry since 1967 and holds many active patents for exclusive features that provide for low maintenance and superior ride quality.

Ridewell’s objective was to eliminate shop floor paperwork and manual processes, obtain real time performance metrics, and achieve greater visibility over manufacturing operations. After carefully conducting their due diligence they selected Crossroads MES to address these challenges.

Crossroads Manufacturing Execution System connects your manufacturing plant to the rest of your enterprise by using touch screen PCs on the shop floor. Powered by IBM I Power Systems, Crossroads MES fills the gap that exists between your ERP system and your lean manufacturing initiatives by modernizing and transforming the ERP experience. It delivers paperless shop packets to your entire workforce, captures live manufacturing data, and then delivers real-time status to your Tablet or PC.

Key Features include:

  • Paperless Shop Floor                               
  • Labor and Machine Time
  • Production Reporting
  • Material Issue
  • Scrap Reporting
  • Scheduling
  • Capacity Load Balancing
  • Label Integration
  • Dashboard Analytics                    

Crossroads MES provides information that helps manufacturing decision makers understand how current conditions on the plant floor can be optimized to improve production output.

Crossroads RMC is proud to have Ridewell Corporation as a client and we look forward to working together to support their company growth and success.

First7071727375777879Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Infor LN & Baan Tip: The ABC’s & 123’s of Serialized Items
Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: The ABC’s & 123’s of Serialized Items

A serialized item is a physical occurrence of a standard item that is given a unique lifetime serial number. This enables tracking of the individual item throughout its lifetime, for example, through the design, production, testing, installation, and maintenance phases. A serialized item can consist of other serialized components.

In Service, a serialized item can be a customer-specific or owner-specific installation. Installation groups are a group of installations/serialized items such as photocopiers, computers, air conditioners, forklifts, lathe machines, and even aircraft.

A serialized item is identified by both the item code and serial number. You can set up the mask used to generate the serial numbers so the serial number includes some fields of the item data, such as the item group and the manufacturer.

In a multi-company structure, the companies can share the serialized item data. All the service departments in the various companies can refer to the same serialized items.

The serialized item can originate from a sales order or a project. The details of a serialized item indicate their origin, for example, by using specific sets of serial numbers for items that originate from sales orders and from projects. Serialized items can also originate from an as-built structure or directly from the production bill of material in Manufacturing.

In Service, serialized items can start their respective life cycles in As-Built mode or As-Maintained mode. Each serialized item, with or without its installation group, can be covered by a service contract or a warranty.

The serialized item status

Serialized items can be status controlled. Each serialized item can have the following status:

  • Startup - The serial number has been assigned, but the item is not yet included in a service order or contract. You can only change the status to Active.
  • Active - The serialized item is part of a service order or contract. You can only change the status to Revision.
  • Revision - You can only change the status to Active.


Serial numbers

A unique serial number is assigned to every manufactured item or purchased item. The serial number is assigned to track the item in its life cycle. You can define a dummy serial number for an item. The dummy serial number is a temporary number and can be used to monitor the item until a permanent number is assigned. For each serialized item, you can define an alternative serial number for customer reference. You can use the alternative serial number to search for items when you register calls, create service order activities, or register parts lines for a maintenance sales order.


Serialized item groups

You can group serialized items by serialized item groups. A serialized item group is a group of serialized items with similar features. You can define the serialized item groups that you need, for example, to categorize the skills required for the maintenance of the items, or as a basis for enquiries and reporting. For example, you can select service engineers on the basis of their skills for a specific serialized item group.


Serialized items in physical breakdown structures

Serialized items are the building blocks of physical breakdown structures. A physical breakdown structure is the relationship definition of a set of serialized items with their underlying parts and assemblies. Some serialized items, such as a photocopier, have a simple structure whereas other serialized items such as a ship or an aircraft have a complex structure.

A top serialized item occurs at the highest level in the physical breakdown structure, while the underlying structure consists of assemblies that are either effective or outdated. Use the Tree View option to display a graphic view of the structure.

Each serialized item in the breakdown can be linked to a functional element, with a common function across the entire structure, and can be used to group serialized items based on the functional importance.

Previous Article Infor LN & Baan: Customizing Shipping Labels for All Customers
Next Article Infor LN & Baan Tip: Outbound Order Lines
Print
22746 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories