Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

IDF News: Making modifications to IDF programs or files

George Moroses 0 35134 Article rating: 5.0

If you are making modifications to IDF programs or files, it is a good idea to create your modified objects in a test library that you create for this purpose.

The test library should be added to the top of the library list just after the temporary library QTEMP so your modified objects are found instead of the standard IDF objects. This test library allows you to make changes and test them, or to continue running in this mode permanently without actually replacing the original objects. This test library also helps you to isolate and control your modifications when applying patches from Infor.

Motivate Your Infor LX & BPCS Team with Dashboards

BrightGauge blog

George Moroses 0 36299 Article rating: 5.0

"Using real-time dashboards, you can hold everyone accountable to KPIs on a weekly basis so nothing falls through the cracks. Customers stay happy and you know what's going on at all times while keeping your whole team on the same page." (BrightGauge blog, February, 2018)

Leverage dashboards to help ensure all aspects of your business are covered.Crossroads RMC provides real-time dashboards to display virtually any aspect of your ERP data. Use the standard dashboards, or create your own! 

Learn more about Analytics Dashboard>

Contact Anthony Etzel to discuss how dashboards can immediately benefit your company this year!

Learn how MES can benefit your company in 2020 by simply doing all of these things...

George Moroses 0 35831 Article rating: 5.0

Do your users have an easy way to do all of these things? If not, you should learn how MES could benefit your company in 2020!

  • Schedule work from a work center to a specific machine or work area.
  • Re-sequence work and split for better flexibility in scheduling shop floor activities.
  • Receive work schedules electronically as well as interacting with it by reporting transactional activity.
  • Electronically display drawings, process instructions, and quality instructions to eliminate (or minimize) the need for paper on the shop floor.
  • Pass shop floor transactional activity to dashboard displays as well as your ERP system.

Learn more about Crossroads MES>

Infor LX & BPCS Tip of the Week: What is EGLi?

George Moroses 0 60240 Article rating: 5.0

EGLi provides Infor LX Configurable Enterprise Accounting (CEA) functionality including Advanced Transaction Processing (ATP), a configurable ledger, and batch transaction processing in the IDF architecture.

EGLi is a complete replacement for CEA. Infor LX applications integrate with EGLi, and subsystem transactions generated in Infor LX are used to create journal entries in EGLi. The Infor LX integration system parameters allow you to specify whether CEA or EGLi is your primary financial product.

We recommend that you select CEA while you test the integration. The primary financial product flag and the CEA migration programs are designed to assist existing CEA clients with their implementation of EGLi. Journals are produced in both GL systems so you can verify that the data in both GL systems are the same. This integration includes migration programs that copy your existing CEA files to corresponding EGLi files. After you run the migration programs, EGLi should be configured and ready to use. If you are already running IDF via Ming.le or SiW, before you install EGLi, you will need to see the Ming.le integration guide for instructions on how to export EGLi tasks from IDF to SiW/Ming.le.

Learn More > Infor LX Integration Guide for Enterprise General Ledger

Infor LN & Baan Tip of the Week: Standalone Sessions in LN 10.7

Kathy Barthelt 0 171238 Article rating: 5.0

The standalone LN UI allows enhanced URL-parameter configuration. A single session can be started directly. Based on the URL, users can choose if the menu must be available and if the displayed set of records must be restricted.

This can be useful for self-service kiosks or simple full-screen clients.

First6364656668707172Last

Tips:  LX | BPCS | M3

Anthony Etzel
/ Categories: Infor LX & BPCS Tips

BPCS/LX Tip of the Week: How To Capture Re-Work Time (Part 1)

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
Previous Article BPCS/LX Tip of the Week: Configuration Management
Next Article BPCS/LX Tip of the Week: The Item Master Requirements Code
Print
92137 Rate this article:
No rating

Contact

Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Contact author

x

Tips: LN | Baan

Note: The Blocked Operations (tisfc0540m000) session displays the blocked operations.

Introduction

Sometimes a problem occurs that must be solved before an operation proceeds. Examples of such situations are:

  • The quality of an intermediate product must first be inspected.
  • A machine is in repair.
  • A supplier cannot deliver an essential component in time.
  • A customer is late with its payments.

In these situations the operation can get the operation status Blocked.

An operation can be blocked:

  • Manually.
  • Automatically by Quality.

Blocking reasons

Every blocked operation must have a blocking reason. The blocking reason of a blocked operation has two purposes:

  • To indicate why the operation is blocked.
  • To determine which actions you can no longer perform on the operation.

Types of blocking

The following actions can be blocked by means of a blocking reason:

  • Reporting a quantity completed.
  • Reporting a quantity rejected.
  • Reporting a quantity to be inspected.
  • Reporting an operation completed.

You normally carry out these actions in the Report Operations Completed (tisfc0130m000) session.

You can define blocking reasons in the Blocking Reasons (tisfc2100m000) session.

Manual blocking

Use the Report Operations Completed (tisfc0130m000) session to block an operation. When you block an operation, you must also enter a blocking reason. If Quality has already blocked the operation, you can only enter a blocking reason, which is more restrictive than the blocking reason of Quality.

Blocking by Quality Managem

Categories