How Do I Determine If MES Is Right For My Business?

George Moroses 0 29939 Article rating: No rating

There are certain key questions that must be answered to determine whether or not an MES system would benefit your organization: 

  • How do you analyze OEE?
  • Is there an opportunity to reduce WIP inventory, indirect labor, downtime, waste or scrap?
  • What is the cost and impact of producing and distributing shop paper including drawings and work instructions?
  • Would you like to go paperless on your shop floor?
  • How are your continuous improvement initiatives tied to your ERP?
  • Is Management requesting real time production status reporting via dashboards or drilldown reports?
  • What different “islands of automation” exist on your shop floor?

The answers to each of these questions could have a significant impact on the profitability of your business. Want to quantify your results? Contact George Moroses today to schedule your FREE MES ROI Analysis.

Consulting: Methodology for Infor LX & BPCS Upgrades

Anthony Etzel 0 39827 Article rating: 5.0

Throughout the years, Crossroads RMC has participated in several 4.0.05CD upgrades to LX, from which we had the opportunity to refine our methodology for CEA (Configurable Enterprise Accounting) implementations/upgrades. As a result, we have fine tuned our overall upgrade approach and have been very successful in implementing this approach with our clients.

CEA replaces the green screen GLD module and allows for considerable flexibility in the design of the COA (Chart of Accounts).

Our approach incorporates any changes that are needed in the COA and facilitates the transfer or replacement of Profit Centers and Account Codes from BPCS to LX, building on the existing GL. Among the issues we manage is the conversion of historical GL balances.

We maximize the use of LX and CEA while minimizing the manual effort that gets you there.

Contact Frank Petrasio to discuss how we can help you:

  • Preserve what works in BPCS
  • Optimize what works in LX

with a maximum of respect for your time and budget. Learn more about Crossroads RMC Consulting>

Infor LX & BPCS Tip of the Week: Additional Selection Criteria for Cycle Count Purge Enhancement – 8.4

Anthony Etzel 0 56872 Article rating: 5.0

The final step in Cycle Count processing is to maintain the (ICY) Cycle Count file. This history file increases in size with each posting session. It is up to users to purge the historical data that you no longer need. Previously, INV015 Cycle Count Purge by date only allowed users to purge the cycle count file by date. Now, additional selection criteria have been added that allows users improved ways to control records they may want to purge.

Infor LN & Baan Data Collection News: Crossroads RMC Cycle Counting Application

Kathy Barthelt 0 34631 Article rating: 5.0

How often are you counting your inventory? Are you sure your counts are accurate?  Are inaccurate counts affecting your ability to satisfy customer orders?

Crossroads RMC Cycle Counting Application gives you:

· Overall increased inventory accuracy

· Ability to review and approve count before direct update of Baan/LN tables

· Elimination of unnecessary re-orders of items with current inventory

· Greater ability to satisfy customer orders due to greater visibility to (accurate) inventory levels

· Direct labor cost savings – less staff required for count

· Increased productivity during count – with some of our customers, counts used to take weeks. They can now complete a count of all their inventory in one day.

Learn more: Crossroads RMC Data Collection - Web Collect 

Consulting News: ERP Implementation or Upgrade... Are You Prepared?

Crossroads RMC 0 38531 Article rating: 5.0

There are several factors that need to be considered when undertaking a major project like an ERP implementation or upgrade. Before you look to others outside of your organization to provide the expertise needed, you need to first look internally to ensure that the right players are in place to lead the project and also ensure business continuity during the project.

  • Executive Sponsorship - Does Senior Management have a clear and well understood commitment to project success?
  • Strong Project Manager?
  • Core Team Functional Representation - Are the Team Members knowledgeable participants and able to keep the project moving forward?
  • User Community Support?
  • Motivation - Are the Team Members willing and able to provide the time needed for a large-scale implementation?

Do You need help figuring out if your organization is properly positioned for an implementation or upgrade? Contact us. We can help.

Infor LN & Baan Tip of the Week: Job Shop Bill of Material – 10.7

Kathy Barthelt 0 77697 Article rating: 5.0

The job shop bill of material is defined by site. It is used as the source for the estimated materials in the job shop production order.

The new job shop bill of material differs from the old bill of material. These changes are applicable for the new job shop bill of material:

  • It has a header and a status.
  • It is always revision controlled.
  • It can be designated for planning and for costing.
  • The effective dates have been moved from the material lines to the header.
  • The BOM quantity has been moved from item production data to the header.
  • The use up has been moved from alternatives to the material line.
  • The warehouse is defined on the material line (mandatory).
  • The routing operation is defined on the material line (optional).

The job shop bill of material can be generated through the production bill of material.

IDF News: default order class for the warehouse customer

George Moroses 0 29449 Article rating: 5.0

In IDF Customers, the default order class for the warehouse customer should be a user-defined order class (base order class = 004). Do not use base order class 002 or 005, to allow for automatic invoicing of warehouse orders (if a separate manual Ship Confirm event is required per the order class, auto invoicing cannot occur from Pick Confirm).

Can you afford not to invest in MES?

Anthony Etzel 0 32716 Article rating: 5.0

Given the environment today with growing global competition in terms of innovation, cost and time to market (given by short product cycles) as well as with increasing regulatory demands, the answer to the question “Can you afford not to invest in MES?” is turning into a clear “NO”. 

Click here to read the full Critical Manufacturing article.

Crossroads MES is Infor’s global solution for manufacturing execution and is perfectly suited to fill the gap between your manufacturing initiatives and your ERP system.

First6061626365676869Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Anthony Etzel
/ Categories: Infor LX & BPCS Tips

BPCS/LX Tip of the Day: LX Inventory Pallet Status Flow

Four fields in the Item/Warehouse record (IIW file) affect the disposition of the

pallet status.

 

1.  Goods Receiving Code: You define these codes in Goods Receiving Maintenance (WHM130). The codes control whether or not the stock passes through inspection, what percentage, or quantity of a delivery to inspect, and the number of quarantine days, if any.

 

2.  Inspection Zone/Inspection Location: Either the Inspection Zone or the Inspection Location must be entered on the Item/Warehouse Master Maintenance screen WHM150D2-01.

 

3.  Default Inventory Status: If the status is 0 (Received) or 1 (Inspection), the item moves from the receiving location to the inspection location in inspection status. If the pallet status is not 0 or 1 (that is, 4 (Available) or 9 (Rejected)), the pallet moves to the inspection location with the default status, but the pallet will not proceed from the Inspection location to the Putaway location. You must manually move the stock.

 

4.  Pallet Status Codes: 0 (Received), 1 (Inspection), 4 (Available), and 9 (Rejected) are the only pallet status codes reserved by the system to update and advance inventory/pallet status. To do this Warehouse Management uses the following rules:

 

·    Rejected inventory goes from receiving to a Reject (type 9) Location with a Location Type A (Rejected) in the Location Extension file (ILE) record. All inventory received into a reject location is set to a pallet/inventory status of Reject (9).

·    Inventory received by Goods Receiving (WHM510) into a Receiving Location takes on the Default Inventory Status that is in the Item Warehouse file (IIW) record.

·    If the Default Inventory Status is 0 (Received), the system places the pallet status at 0 (Received) in the Receiving Location, I (Inspection) in the Inspection Location, and 4 (Available) if moved from Inspection to any palletized location other than rejection. If moved to rejection the Default Inventory Status changes to 9 (Rejected).