Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Flexfab Goes Live with Crossroads Data Collection in China

Kathy Barthelt 0 34621 Article rating: 5.0

Flexfab Horizons International, Inc, a global leader in the manufacturing of high performance silicone and other advanced polymer products, goes live with Crossroads RMC’s Data Collection Solution, Web Collect, formerly RMC3, in their China facility. This represents the 3rd data collection go live for the Crossroads data collection solution within Flexfab with the US and UK going live in 2018. All installations focused on improvements in warehouse management in Infor LN 10.6. Applications implemented included Receiving, Inspections/Approvals, Putaway, Stock Transfers and Stock Inquiry.

Crossroads RMC is proud to partner with an American manufacturer of diagnostic healthcare

Integrated freight management solution for Infor LN 10.5.2 Cloud implementation

Kathy Barthelt 0 40163 Article rating: 5.0

An American manufacturer of diagnostic healthcare has selected the RMCship solution from Crossroads RMC to streamline their shipping process on Infor LN 10.5.2 in the cloud. They went live with one site running RMCship in June of 2019 and 3 more sites to follow by end of year. They will use RMCship to increase accuracy by eliminating manual steps and streamlining their operations.

Hunter Douglas Architectural Products Selects Crossroads RMC for LN 10.6 Upgrade Project

LN Upgrade 10.6

Kathy Barthelt 0 34206 Article rating: 5.0

Hunter Douglas, the world leader in window coverings and a major manufacturer of architectural products, has selected Crossroads RMC for their LN 10.2.1 to 10.6 upgrade project. Hunter Douglas has been an LN user for years, but due to a requirement from their parent organization to modernize their hardware/infrastructure, it was decided to update their ERP version as well. Phase 1 of the project will consist of a base technology upgrade with a Phase 2 planned for 2020. Phase 1 Go-Live is slated for January 1, 2020.

To learn more about our Infor LN & Baan Consulting, contact us at: 800.762.2077, email Kathy Barthelt, or visit our Services webpage.

Infor LN & Baan Tip of the Week: The Production Bill of Material – 10.7

Kathy Barthelt 0 172911 Article rating: 5.0

The production bill of material is globally specified at the company level. It can be used as a source for the definition of the local material lists, such as:

  • The production model in the repetitive module.
  • The production model in the job shop module.
  • The subcontracting model in the subcontracting module.

The production bill of material can be generated through the engineering bill of material. The new production bill of material differs from the old bill of material:

  • It has a header and a status.
  • It is always revision controlled.
  • The effective dates have been moved from the material lines to the header.
  • The BOM quantity has been moved from item production data to the header.
  • The use up has been moved from alternatives to the material line.
  • The material line excludes logistic data (no warehouse nor routing operation).

The production bill of material is not mandatory.

Production bill of material revisions:
The production bill of material is revision controlled. The objective of the revision is to control the changes to the bill of material over time.

The P-bom includes this revision-related data:

  • Revision number
  • Effective date and Expiry date
  • Status (New, Approved, Expired)
  • Creation date and Created by: user
  • Approval date and Approved by: user
  • Expiry date and Expired by: user
  • Source information

On Time Orders: OTTO - The Right Tools!

George Moroses 0 35201 Article rating: 5.0

Your business doesn’t run without the right people and processes in place, but in order for people to manage the right things at the right time, they need tools... the RIGHT tools

OTTO helps manufacturing plants consistently meet customer commitments, allowing supervisors and managers to spend more time analyzing, making decisions, communicating, and coordinating. We can prove that OTTO is the right tool for the job.

Give it a test drive for 30 days at no charge and see immediate results.

Contact George Moroses today to learn more.

First5657585961636465Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Infor LX & BPCS Tip of the Week: Reports to Analyze Company Performance

You know what ERP data you need to analyze your company’s financial and production health, but sometimes it's a struggle to get that data in a format that is meaningful. Here are some reports in BPCS & Infor LX which you may find useful.

As is the case with most ERP reports, with each version progression from the earliest versions of BPCS to the latest version of Infor LX, there are improvements in selection criteria and report content. Some may require some setup and others may require some formatting if you would like to export them to Excel. Contact me if you have questions or need assistance.

BPCS & LX FINANCE REPORTS:

BPCS:

  • GLD240 - General Ledger - Trial Balance
    • This report allows you to produce a menu-driven Trial Balance that shows Opening and Closing balances, and Activity, for any range of Profit Centers and accounts in the GL Master. 
  • GLD250 - Journal Entry Audit Report
    • This report answers the Audit need. It provides Journal detail for selected Journal Sources and includes Reference fields that tie GL transactions to the Subsystem source. 

Infor LX

  • CLD220 - General Ledger - Trial Balance
    • This report allows you to produce a menu-driven Trial Balance that shows Opening and Closing balances, and Activity, for any account range from a customized Chart of Accounts. Year and Period selectivity, along with Journal Source choices, allow for as focused a view of an organization's GL activity as an accounting department needs. 
  • CLD285 - CEA Audit Report
    • This report answers the Audit need. It provides Journal detail for all Account Strings selected and includes Reference fields that tie GL transactions to the Subsystem source.


BPCS & LX MANUFACTURING REPORTS:

BPCS / Infor LX:

  • CST270 – Shop Order Cost Variance & WIP Report
    • This is by far the best total picture of what happened on any Shop Order from several perspectives (cost/efficiency/overall performance).
       
  • INV220 – Stock Status Summary & INV210 – Turnover Analysis
    • ​Both of these reports give you a view of how your inventory is moving to use as a measurement of the Planning Settings and which items need closer review.
Print
33523 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

x

Categories