Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Hunter Douglas Architectural Products Selects Crossroads RMC for LN 10.6 Upgrade Project

LN Upgrade 10.6

Kathy Barthelt 0 34101 Article rating: 5.0

Hunter Douglas, the world leader in window coverings and a major manufacturer of architectural products, has selected Crossroads RMC for their LN 10.2.1 to 10.6 upgrade project. Hunter Douglas has been an LN user for years, but due to a requirement from their parent organization to modernize their hardware/infrastructure, it was decided to update their ERP version as well. Phase 1 of the project will consist of a base technology upgrade with a Phase 2 planned for 2020. Phase 1 Go-Live is slated for January 1, 2020.

To learn more about our Infor LN & Baan Consulting, contact us at: 800.762.2077, email Kathy Barthelt, or visit our Services webpage.

Infor LN & Baan Tip of the Week: The Production Bill of Material – 10.7

Kathy Barthelt 0 172323 Article rating: 5.0

The production bill of material is globally specified at the company level. It can be used as a source for the definition of the local material lists, such as:

  • The production model in the repetitive module.
  • The production model in the job shop module.
  • The subcontracting model in the subcontracting module.

The production bill of material can be generated through the engineering bill of material. The new production bill of material differs from the old bill of material:

  • It has a header and a status.
  • It is always revision controlled.
  • The effective dates have been moved from the material lines to the header.
  • The BOM quantity has been moved from item production data to the header.
  • The use up has been moved from alternatives to the material line.
  • The material line excludes logistic data (no warehouse nor routing operation).

The production bill of material is not mandatory.

Production bill of material revisions:
The production bill of material is revision controlled. The objective of the revision is to control the changes to the bill of material over time.

The P-bom includes this revision-related data:

  • Revision number
  • Effective date and Expiry date
  • Status (New, Approved, Expired)
  • Creation date and Created by: user
  • Approval date and Approved by: user
  • Expiry date and Expired by: user
  • Source information

On Time Orders: OTTO - The Right Tools!

George Moroses 0 35121 Article rating: 5.0

Your business doesn’t run without the right people and processes in place, but in order for people to manage the right things at the right time, they need tools... the RIGHT tools

OTTO helps manufacturing plants consistently meet customer commitments, allowing supervisors and managers to spend more time analyzing, making decisions, communicating, and coordinating. We can prove that OTTO is the right tool for the job.

Give it a test drive for 30 days at no charge and see immediate results.

Contact George Moroses today to learn more.

Infor LX & BPCS Tip of the Week: Control Number, POCNO, added to CEA502B1

George Moroses 0 59157 Article rating: 5.0

This enhancement makes the control number field in the purchase order file available for macros. Previously, the POCNO field (control number) in the purchase order was not available for macros. This enhancement allows the user to create macros that use this field. This enhancement provides the user with the ability to keep track of control numbers in their journal entries.

The programs impacted include:

  • CEA502B1, ACP Engine Resolution Program
  • CGL091B, ERPLX ACP File I/O Program
First5556575860626364Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Infor LN & Baan Tip: The ABC’s & 123’s of Serialized Items
Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: The ABC’s & 123’s of Serialized Items

A serialized item is a physical occurrence of a standard item that is given a unique lifetime serial number. This enables tracking of the individual item throughout its lifetime, for example, through the design, production, testing, installation, and maintenance phases. A serialized item can consist of other serialized components.

In Service, a serialized item can be a customer-specific or owner-specific installation. Installation groups are a group of installations/serialized items such as photocopiers, computers, air conditioners, forklifts, lathe machines, and even aircraft.

A serialized item is identified by both the item code and serial number. You can set up the mask used to generate the serial numbers so the serial number includes some fields of the item data, such as the item group and the manufacturer.

In a multi-company structure, the companies can share the serialized item data. All the service departments in the various companies can refer to the same serialized items.

The serialized item can originate from a sales order or a project. The details of a serialized item indicate their origin, for example, by using specific sets of serial numbers for items that originate from sales orders and from projects. Serialized items can also originate from an as-built structure or directly from the production bill of material in Manufacturing.

In Service, serialized items can start their respective life cycles in As-Built mode or As-Maintained mode. Each serialized item, with or without its installation group, can be covered by a service contract or a warranty.

The serialized item status

Serialized items can be status controlled. Each serialized item can have the following status:

  • Startup - The serial number has been assigned, but the item is not yet included in a service order or contract. You can only change the status to Active.
  • Active - The serialized item is part of a service order or contract. You can only change the status to Revision.
  • Revision - You can only change the status to Active.


Serial numbers

A unique serial number is assigned to every manufactured item or purchased item. The serial number is assigned to track the item in its life cycle. You can define a dummy serial number for an item. The dummy serial number is a temporary number and can be used to monitor the item until a permanent number is assigned. For each serialized item, you can define an alternative serial number for customer reference. You can use the alternative serial number to search for items when you register calls, create service order activities, or register parts lines for a maintenance sales order.


Serialized item groups

You can group serialized items by serialized item groups. A serialized item group is a group of serialized items with similar features. You can define the serialized item groups that you need, for example, to categorize the skills required for the maintenance of the items, or as a basis for enquiries and reporting. For example, you can select service engineers on the basis of their skills for a specific serialized item group.


Serialized items in physical breakdown structures

Serialized items are the building blocks of physical breakdown structures. A physical breakdown structure is the relationship definition of a set of serialized items with their underlying parts and assemblies. Some serialized items, such as a photocopier, have a simple structure whereas other serialized items such as a ship or an aircraft have a complex structure.

A top serialized item occurs at the highest level in the physical breakdown structure, while the underlying structure consists of assemblies that are either effective or outdated. Use the Tree View option to display a graphic view of the structure.

Each serialized item in the breakdown can be linked to a functional element, with a common function across the entire structure, and can be used to group serialized items based on the functional importance.

Previous Article Infor LN & Baan: Customizing Shipping Labels for All Customers
Next Article Infor LN & Baan Tip: Outbound Order Lines
Print
22757 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories