Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Hunter Douglas Architectural Products Selects Crossroads RMC for LN 10.6 Upgrade Project

LN Upgrade 10.6

Kathy Barthelt 0 34111 Article rating: 5.0

Hunter Douglas, the world leader in window coverings and a major manufacturer of architectural products, has selected Crossroads RMC for their LN 10.2.1 to 10.6 upgrade project. Hunter Douglas has been an LN user for years, but due to a requirement from their parent organization to modernize their hardware/infrastructure, it was decided to update their ERP version as well. Phase 1 of the project will consist of a base technology upgrade with a Phase 2 planned for 2020. Phase 1 Go-Live is slated for January 1, 2020.

To learn more about our Infor LN & Baan Consulting, contact us at: 800.762.2077, email Kathy Barthelt, or visit our Services webpage.

Infor LN & Baan Tip of the Week: The Production Bill of Material – 10.7

Kathy Barthelt 0 172344 Article rating: 5.0

The production bill of material is globally specified at the company level. It can be used as a source for the definition of the local material lists, such as:

  • The production model in the repetitive module.
  • The production model in the job shop module.
  • The subcontracting model in the subcontracting module.

The production bill of material can be generated through the engineering bill of material. The new production bill of material differs from the old bill of material:

  • It has a header and a status.
  • It is always revision controlled.
  • The effective dates have been moved from the material lines to the header.
  • The BOM quantity has been moved from item production data to the header.
  • The use up has been moved from alternatives to the material line.
  • The material line excludes logistic data (no warehouse nor routing operation).

The production bill of material is not mandatory.

Production bill of material revisions:
The production bill of material is revision controlled. The objective of the revision is to control the changes to the bill of material over time.

The P-bom includes this revision-related data:

  • Revision number
  • Effective date and Expiry date
  • Status (New, Approved, Expired)
  • Creation date and Created by: user
  • Approval date and Approved by: user
  • Expiry date and Expired by: user
  • Source information

On Time Orders: OTTO - The Right Tools!

George Moroses 0 35132 Article rating: 5.0

Your business doesn’t run without the right people and processes in place, but in order for people to manage the right things at the right time, they need tools... the RIGHT tools

OTTO helps manufacturing plants consistently meet customer commitments, allowing supervisors and managers to spend more time analyzing, making decisions, communicating, and coordinating. We can prove that OTTO is the right tool for the job.

Give it a test drive for 30 days at no charge and see immediate results.

Contact George Moroses today to learn more.

Infor LX & BPCS Tip of the Week: Control Number, POCNO, added to CEA502B1

George Moroses 0 59168 Article rating: 5.0

This enhancement makes the control number field in the purchase order file available for macros. Previously, the POCNO field (control number) in the purchase order was not available for macros. This enhancement allows the user to create macros that use this field. This enhancement provides the user with the ability to keep track of control numbers in their journal entries.

The programs impacted include:

  • CEA502B1, ACP Engine Resolution Program
  • CGL091B, ERPLX ACP File I/O Program
First5556575860626364Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Materials Tips: Serialized and Lot Controlled Items

Serial and Lot are additional characteristics/properties of Items that can be used to uniquely or collectively identify and track the item along with its Item code. Any Item can be made as Serialized and/or Lot controlled by choosing options "Serialized" and "Lot Controlled" in Items-General session under traceability section on the Details tab.

Further in Items-Warehousing data under the Identification tab, you can enable "Lot Tracking", "Lot in Inventory", "Serial Tracking" and "Serial in Inventory" which enables tracking of the Items. You can also define if the Item is "Serial/Lot not in inventory" then where you want to record the serial and lot details in the transactions like "Direct Delivery", "Receipt", "Transfer", "Register during As-Built, Service and Maintenance".

Below are some topics related to Serialized and Lot Controlled Items that will be useful:

Convert non-Serialized Item to Serialized and non-Lot Controlled item to Lot Controlled and Vice Versa

If Item is created as non-Serialized and/or non-Lot controlled... To change them to Serialized or Lot Controlled, here are some standard Sessions that can be used:

1.Convert (to) Serialized Item (whltc5201m000) can also be accessed from Item-Serials and Warehouses session's Specific Menu.

Note: Once Item is marked or converted as Serialized, it is not possible to revert the item to non-Serialized Items using this session. If any Item has to be converted to non-Serialized, then some Knowledge articles are available to show workaround steps.

2. Convert (to) Lot Item (whltc1202m000) can also be accessed from Item-Lot session's Specific Menu.


Related KB Articles:

2121795 - Item non-Serialized (Not Serial In Inventory) to Serialized (Serial In Inventory) Conversion.
692338 - Is it possible to convert a Serialized Controlled Item into a Not Serialized Controlled Item?
2057953 - Unable to convert a Lot Item to Serialized Item.
723772 - Blocking Message when Trying to Change a Non-Serialized Item to a Serialized Item.
1960873 - Register Serial Issue During As-Built Automatically Set after Converting to Serialized Item.
1134182 - Convert Item to Lot Controlled.
2084394 - Not able to convert Not Lot Controlled Item to Lot in Inventory.
1634725 - Procedure to covert (to) Lot Item (WHLTC1202M000) without using mask.
1009296 - Convert to LOT Item triggered multiple lot numbers. What is the logic behind?
1968968 - Lot Price Not Set after Conversion from Not Lot Controlled to Lot Controlled.
1852794 - Change Lot Type of an Existing Lot.
1634723 - How to enable "Lot" field in the session "Convert (to) Lot Item (whltc1202m000)".

Previous Article Infor LN & Baan Tip: Can You Backflush An Item If Estimated Quantity is Zero?
Next Article Infor LN & Baan Tip: Latest Porting Set – All Versions of Infor LN & Baan
Print
70113 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories