Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

What are the biggest struggles manufacturers face with regard to tax compliance?

George Moroses 0 34142 Article rating: 5.0
  • Tracking thousands of SKU numbers that cross taxability rules or vary in taxability based on state
  • Getting the rates right and filing the reports correctly
  • Surviving an audit (which in this business is inevitable)
  • Keeping track of all the smaller jurisdictions and their special districts
  • Ensuring a seamless process that is audit-able
  • Figuring out what is taxable and what isn’t
  • Tracking use tax

As with other manufacturing processes, having a repeatable, consistent process with sales and use tax compliance means automation. Automating sales and use tax compliance with a solution that ensures that consistent, accurate process means a solution that delivers:...

Infor LX & BPCS: What are your production orders telling you?

George Moroses 0 32805 Article rating: 5.0

Measure what you want to improve.

Six simple words, but put together they convey a powerful concept that can transform manufacturing companies. It’s a basic concept that’s hard to argue with: Collect data, see where the data leads you, and make changes that have a positive impact on the data. Repeat often.

If your company is manufacturing a product, you’re more than likely creating manufacturing variances. These variances tell managers...

Is Your Infor ERP System the Elephant in the Room?

Crossroads RMC 0 37164 Article rating: 5.0

The Infor ERP Elephant in the Room That Must Be Addressed

In a recent survey of Infor ERP customers, we discovered that 50% of respondents said that they did not know whether or not their ERP system had the features and functionality required for their business.  50%....1 out of every 2……not good.

Why is this the case? Well, the causes can be traced back to one of the following reasons:

  • A key-person has retired or left the company and their knowledge left with them.
  • Systems were implemented based on how the previous system worked.
  • Upgrades and implementations were viewed as a “technical upgrade”, meaning that the upgrade was done to get off an old or outdated platform. The new version wasn't researched, its functionality was unknown and no one was trained on it.

You may say “So what? Who cares if our team doesn’t know what else is available, or how the rest of the ERP system functions? Does it really matter?”

Yes - It matters more than you think.... 

Infor LN & Baan Tip of the Week: Year End for Finance

Kathy Barthelt 0 72941 Article rating: 5.0

Year-End is always a busy time!

So busy that it's easy to forget things that must be done in your ERP system to close out the year properly and set you up for a good start to the following year. Here are some things to add to your to-do checklist.

The year-end close process provides an opportunity to:

Finance Specific Items:

First5253545557596061Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Previous Article Infor LN & Baan Tip of the Week LN 10.7 - Draft Printing
Next Article Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant
Print
106553 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories