Infor LX & BPCS Tip of the Week: Journal Upload – EGLi

George Moroses 0 52193 Article rating: 5.0

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

Infor LN & Baan Tip: Open Transactions Check – LN 10.7

Kathy Barthelt 0 56606 Article rating: 5.0

When closing a project, users were informed about open transactions blocking the closure process. To proactively check on open transactions, the Show Open Transactions option has been introduced in the Project Status (tppdm6107s000) session. With this option, issues can be resolved before changing the status.

Infor LX & BPCS Tip of the Week: LX 8.4 Enhancement – Company Security for ACR510

George Moroses 0 17458 Article rating: 5.0

This enhancement provides LX Company Security to Invoice Maintenance, ACR510. Only users authorized to the invoice company can view or maintain invoices.

User must be authorized to ACR as a product or ACR510 as an individual program in Security Master Maintenance, SYS600. Additionally, ACR510-01, displays all records, but if the user tries to revise or display a transaction record for a company the user is not authorized to, this error message is displayed: “User is not authorized to the transaction company.”

Infor LX & BPCS Tip of the Week: Item Deletion Option in IDF Enterprise Items

George Moroses 0 20647 Article rating: 5.0

Previously, users were unable to delete items in IDF Enterprise Items when they have inventory balances or the item is connected to ancillary records, such as sales history records. This feature added in LX 8.4 provides the ability to delete an item when sales history records are found but all sales history activity is zero.

When the user attempts to delete an item in IDF Enterprise Items that is tied to a sales history record, the panel displays a message that the item cannot be deleted. The user can then run the Delete Validation Report to determine which records are tied to this item that prevents the validation. If the item no longer has manufacturing activity but had old sales history, the item can be deleted.

Infor LN & Baan Tip of the Week: In Transit Inventory Report – LN 10.7

Kathy Barthelt 0 62066 Article rating: 5.0

A new In-Transit Inventory report can be printed in the Print In-Transit Inventory (whinr1410m300) session. The report provides an overview of company inventory that is on the move and not stored in a warehouse. This concerns only inventory that is transferred from one warehouse to another. Items that are shipped to, for example, customers or projects, or items that are issued to production lines or service departments are excluded.

The report shows item inventory....

First4950515254565758Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: Differences Between Constraint Planning in Baan IV and Enterprise Planning in LN

In Baan IV, a distinction is made between the actual ERP system and a separate planning tool which contains the Constraint Planning package. This tool was intended to work with any ERP system, not just with Baan IV. The Enterprise Planning package is now considered to be a package like any other package in Infor LN.

Users of Baan IV could choose whether they wanted to plan their supply in one of the following ways:

  • By using the MPS and MRP modules in the Manufacturing package.
  • By using the RPD and RMP modules in the Constraint Planning package.

Users of Infor LN can only use the Enterprise Planning package. The distinction between the MPS items and MRP items has been abandoned. In Infor LN, all items can be planned by using a combination of master-based planning methods and order-based planning methods.

Previous Article Baan/LN Tip of the Week: Setting Up New Employees in LN
Next Article Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items
Print