Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LX & BPCS Tips & Tricks for OPERATIONS: WebTop Grid Support Enhancement for MRP320D

George Moroses 0 851 Article rating: 5.0

This enhancement improved the subfile utilized in MRP320D Master Schedule Detail Inquiry -SCR001 by expanding the subfile with data rather than clearing the subfile as user pages. This change provides full support for the WebTop 4.8 Grid decorator.  To implement this enhancement, request and apply MR 81428

This enhancement updated the approach used to populate the subfile to allow a deployed Webtop Grid to function correctly. There is no visible or user-impacted change to the way the program functions.

This enhancement provides improved functionality and full support of a Webtop grid applied to the subfile.

Infor LX/BPCS Tips & Tricks for FINANCE & TECHNOLOGY: Add Number of Assigned Users to SYS600

George Moroses 0 829 Article rating: 5.0

LX has added the number of users assigned to a Role or Unit to the first screen of SYS600. When displaying the list of profiles on the first screen of SYS600, the list previously included the counts per profile of assigned Roles and Units when the profile was a user. A new column called Users have been added to show the number of assigned users for Roles or Units.

This enhancement provides a quick way to see the number of users assigned to a Role or Unit.

Crossroads RMC launches NextTrack Insights at inPOWER 2025!

Beta testing underway—general availability by year-end.

Nick Olson 0 1028 Article rating: 5.0

Big News from inPOWER 2025!

At this year’s event in Wisconsin, Crossroads RMC unveiled NextTrack Insights, our most advanced analytics solution yet. This release marks a major step forward for manufacturers looking to unlock deeper insights from their ERP systems.

The highlight? AI-powered natural language querying. Instead of digging through static reports or dashboards, you can now ask plain-English questions like “Which machines are down?” or “Are we on track to meet production targets for this shift?” and get immediate, actionable answers.

👉 Beta testing is underway, with general availability by year-end.

Learn more...

Infor LN & Baan Tips & Tricks for OPERATIONS: Pegging Material Supply Lines for Operation and Product Subcontracting

Kathy Barthelt 0 1329 Article rating: 5.0

For project pegged production orders, operations can be subcontracted. The material delivered to the subcontractor can be project pegged or anonymous. The subassemblies sent and retrieved are always project pegged. Costing breaks can be applied to direct the costs of the subcontracted operation to a specific project cost account. If (production material) costing breaks are used, a purchase order line's peg can differ from the peg on the material supply line.

For product subcontracting, the subcontracted purchase orders can include materials that inherit the project pegs or can include anonymous materials. The pegged materials are stored in inventory and are shipped to the subcontractor with project pegged orders.

In case of a project pegged order, a peg distribution is linked to the Purchase Order Material Supply Line in the...

Infor LN & Baan Tips & Tricks for FINANCE: Currency Differences

Kathy Barthelt 0 1153 Article rating: 5.0

When currency differences are posted, several parameters affect the way the entries in the General Ledger are created. This section explains the possible parameter settings:

  1. Ledger accounts by currency

  2. Writing off currency profits

  3. Fixed exchange rate

  4. Writing off currency differences for anticipated payments


1. Ledger accounts by currency
This parameter is recorded in the Finance Company Parameters (tfgld0503m000) session...

245678910Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Previous Article Infor LN & Baan Tip of the Week LN 10.7 - Draft Printing
Next Article Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant
Print
101400 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories