Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

PDIC selects NextTrack Dashboard for Costa Rica Wire Plant

Anthony Etzel 0 56175 Article rating: No rating

The Analytics Dashboard will be used in combination with the existing Crossroads MES system to provide real time machine status across the plant. In addition, KPI’s like OEE and Downtime % will be monitored and displayed at the wire machines and to the production management.

BPCS/LX Tip of the Week: Changing the Master Schedule

Anthony Etzel 0 76701 Article rating: 4.5

You can change your master schedule by specifying the type of master schedule update to perform. You can run a Net Change or Regenerative Schedule.

You also have the ability to clear the lower level requirements out of the Planned and Firm-Planned Order file.

Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance

Kathy Barthelt 0 113270 Article rating: No rating

In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax.

In Infor LN, users can select or clear the new Include Tax in Order Balance check box in the COM Parameters (tccom0000s000) session to indicate whether users want to include tax amounts in the order balance amount. This parameter has an effect on various sessions in Order Management.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 161129 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

BPCS/LX Tip of the Week: What is Lean Make to Order?

Anthony Etzel 0 74987 Article rating: No rating

This is a simple way to go from the customer order to making the order and shipping the order. It involves a few simple steps:

  1. Receive and enter the customer order
  2. Automatic credit review
  3. Automatic release of the shop order tied to the customer order
  4. Issue material, report labor to the production order receipt
  5. Pick the order, ship the order, invoice the customer

With lean, you can skip processing the demand through MRP. You can go directly from the customer order to the shop order creation.

PDIC Goes Live with Crossroads MES

Anthony Etzel 0 54719 Article rating: 5.0

PDIC, a leading producer of wire products, went live with the Crossroads MES solution on June 30th,2014. PDIC needed a better way to deploy and report shop floor information to BPCS 6.02. Their goal was to eliminate all their manual reporting and position themselves to take advantage of the Crossroads Dashboards.

Baan/LN Tip of the Week: Negative Inventory

Kathy Barthelt 0 131327 Article rating: 5.0

If Location Control is turned on in Baan IV, then inventory should never be negative.

If Location Control is not turned on in Baan IV, and the parameter “Negative Inventory Allowed” in INV Parameters is set to “NO”, then inventory should never be negative.

In Baan V and LN, the parameters in Inventory Handling Parameters determine whether you can have negative inventory. If these parameters are set to “NO”, then inventory should never be negative.

BPCS/LX Tip of the Week: Establish Costing For Purchased Items

Anthony Etzel 0 89013 Article rating: No rating

How Does Infor LX Establish Costing For Purchased Items?

In LX, you will establish a standard cost (you define the standard) that LX will use for the purchase items. You also need to establish in LX the Cost Type, the Cost Bucket, and the Cost Set needed for cost accounting.

First130131132133134135136138

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE: Using Dimensions

You can independently define dimensions and use them to prepare analyses of ledger account transactions and balances. You can use up to 12

dimension types. You can define a name and an entire structure of dimension codes for each of these dimension types. There is no relationship between the dimension types.

For example, you can set up these dimensions:

  • Dimension Type 1 = Cost center
  • Dimension Type 2 = Item group
  • Dimension Type 3 = Business unit
  • Dimension Type 4 = Geographical area
  • Dimension Type 5 = Activities

You can separately define the dimension structure for each of these dimension types, in other words, you can set up a dimension structure for the cost centers, a structure for item groups, and so on.

You can define the number of dimension types that you use in the Group Company Parameters (tfgld0101s000) session. If you have several financial companies in a company group, the dimension types used apply to all the companies in the group.

You can name the dimension types and define linked objects in the Dimension Type Descriptions (tfgld0102m000) session. You can then define the dimension codes to be used in each company in the Dimensions (tfgld0510m000) session. You can also make multilevel dimension structures with totals and subtotals. You can build a dimension hierarchy of up to ten levels.

In the Dimensions (tfgld0510m000) session, you can define the dimensions for each dimension type, and link the dimensions to parent dimensions and child dimensions.

Dimensions are always used together with ledger accounts. For each ledger account, you can define which dimension type or types are linked to the ledger account in the Chart of Accounts (tfgld0508m000) session. For each dimension type, you must select whether the dimensions type is MandatoryOptional, or Not Used by the ledger account.

When you enter a transaction, you must first state the ledger account. Then you must enter a dimension for each Mandatory dimension type that is linked to the ledger account, and you can enter a dimension for each Optional dimension type.

For example, the sales revenues ledger account is linked to dimension type 2 (item group) and dimension type 4 (area). The dimension type 1 (cost center) and dimension type 3 (business unit) are not used for the ledger account. The freight costs ledger account is linked to only dimension type 1 (cost center). The other dimension types are not used for the ledger account.

For each dimension type, you can define one dimension with an empty dimension code. If the dimension type is Optional for a ledger account, LN posts transactions for which no dimension is specified to this dimension. In this way, differences between the ledger history and the dimension history can be avoided.

In the Cross Validation Rules (tfgld0151m000) session, you can define the ranges of allowed dimensions by ledger accounts. You cannot change the dimension range for a ledger account that occurs in an unfinalized batch.

You can create transactions for Financials from the integration with other LN packages. You can enter these transactions into ledger accounts and into dimensions. You can define the assignment to ledger accounts through the Mapping Scheme (tfgld4573m000) session.

You can use the dimensions to split the transactions on the customer and supplier control accounts by departments, persons responsible for the revenues, costs, properties, debts, and so on.

The dimensions also provide the basis for the cost allocation in the Cost Accounting module. In CAT, you can allocate the costs (and any revenues) within a dimension type from one dimension code to another and from one dimension type to another.

TECHNOLOGY: High Contrast Skin

The high contrast skin can be activated by users who experience low vision, color-blindness, or similar visual impairments.

If the high contrast skin is active, LN UI is colored so that all controls comply with the WCAG AA norms for accessibility.

Guideline 1.4.3 Contrast (Minimum)

The visual presentation of text and images of text has a contrast ratio of at least 4.5:1. For level AA, these exceptions apply:

  • Large text: large-scale text and images of large-scale text have a contrast ratio of at least 3:1.
  • Incidental: the following text or images of text have no contrast requirement:
    • Text or images of text that are part of an inactive user interface component.
    • Text or images of text that are pure decoration.
    • Text or images of text that are not visible to anyone.
    • Text or images of text that are part of a picture that contains significant other visual content.
  • Logotypes: text that is part of a logo or brand name has no minimum contrast requirement.

OPERATIONS: Blocking Operations

Note: The Blocked Operations (tisfc0540m000) session displays the blocked operations.

Introduction

Sometimes a problem occurs that must be solved before an operation proceeds. Examples of such situations are:

  • The quality of an intermediate product must first be inspected.
  • A machine is in repair.
  • A supplier cannot deliver an essential component in time.
  • A customer is late with its payments.

In these situations the operation can get the operation status Blocked.

An operation can be blocked:

  • Manually.
  • Automatically by Quality.

Blocking reasons

Every blocked operation must have a blocking reason. The blocking reason of a blocked operation has two purposes:

  • To indicate why the operation is blocked.
  • To determine which actions you can no longer perform on the operation.

Types of blocking

The following actions can be blocked by means of a blocking reason:

  • Reporting a quantity completed.
  • Reporting a quantity rejected.
  • Reporting a quantity to be inspected.
  • Reporting an operation completed.

You normally carry out these actions in the Report Operations Completed (tisfc0130m000) session.

You can define blocking reasons in the Blocking Reasons (tisfc2100m000) session.

Manual blocking

Use the Report Operations Completed (tisfc0130m000) session to block an operation. When you block an operation, you must also enter a blocking reason. If Quality has already blocked the operation, you can only enter a blocking reason, which is more restrictive than the blocking reason of Quality.

Blocking by Quality Management

Quality uses the blocking reasons specified in the Quality Management Parameters (qmptc0100m000) session, to block operations. For details, see the Using QM for manufacturing operations topic.

Previous Article Infor LN & Baan Tips & Tricks for OPERATIONS: Simulated Purchase Prices (ticpr1170m000)
Next Article Infor LN & Baan Tips & Tricks for FINANCE: Using Dimensions
Print
298 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories