Infor ERP Tips and Infor ERP News for Infor LX, BPCS, Infor ERP LX, Infor LN, Infor ERP LN, Baan, Infor M3, and Movex

Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Indirect Labor Reporting

Anthony Etzel 0 84145 Article rating: No rating
In the Shop Floor Control Module, you have the ability to key in both direct labor and indirect labor. However you want to establish specific types (reasons) for the indirect labor. The SFC600 labor entry program shows a reason code field, but it is designed for reject quantity and machine downtime reasons, not indirect labor reasons.

There is a way around this. With an MES solution you have the ability to setup and report indirect time against a specific reason code.

Baan/LN Tip of the Week: Configuring Items in Infor LN

Kathy Barthelt 0 95296 Article rating: No rating

In Infor LN, the configuration of a generic item not always results into a customized item. Configured items can now be customized items as well as standard items. If users configure items without PCS projects, standard items are generated instead of customized items.

Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance

Kathy Barthelt 0 84383 Article rating: No rating
In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax.

In Infor LN, users can select or clear the new Include Tax in Order Balance check box in the COM Parameters (tccom0000s000) session to indicate whether users want to include tax amounts in the order balance amount. This parameter has an effect on various sessions in Order Management.

BPCS/LX Tip of the Week: Shop Order Status

Anthony Etzel 0 87928 Article rating: No rating

You can see the status of the Shop Order when using SFC300 Shop Order Inquiry. You want to be sure that your shop orders are at the correct status in order to report against them.

The following are the shop order status codes:

04 = The Shop order has been entered.

05 = The Shop order has been released and printed.

14 = The Shop order has been released, but not printed. If a shop order is at this status, you have released it and it is not printed due to a system failure, or the order has been put on hold.

XX = The Shop order is closed.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 90989 Article rating: 4.0
For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

Baan/LN Tip of the Week: What could go wrong with GRINYA?

Kathy Barthelt 0 85907 Article rating: No rating
One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan/LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error. It is recommended that the Integrations Setup tables be audited either through Baan or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Baan/LN Tip of the Week: Differentiating An Item By Supplier - LN

Kathy Barthelt 0 86737 Article rating: No rating

In LN, you can differentiate between items at various suppliers:

  • Locations (warehouses),
  • Purpose (planning, purchase)
  • Origin (supplier, warehouse)

Example

An item is supplied by two different suppliers. Supplier A ships in lots of 100 pieces due to how the item is packed. Supplier B ships the goods in units of 60 pieces.

You can define specific parameters for each supplier. The following sessions can be used to define these characteristics:
 
  • Items - Planning (cprpd1100m000)
  • Check Item Data by Warehouse (whwmd2210m000)
  • Item Supplier Plan (cpvmi0530m000)
These sessions define entities that have an n-to-1 relationship with the general item data.

 

BPCS/LX Tip of the Week: Inventory Control

Anthony Etzel 0 95076 Article rating: No rating

In Infor LX you need to determine how inventory will be moved in and out of warehouse storage locations, and which of the following transactions to use for inventory control:


  • A transfer transaction can be used to move inventory from one warehouse location to another warehouse location.
  • A production receipt transaction is used to add inventory to a warehouse location.
  • A material issue or backflush is used to reduce inventory from a warehouse location.
First130131132133135137138139Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Moving Beyond ERP Customizations: Smarter Solutions for a Future-Ready System

Transitioning away from ERP customizations can feel like a major hurdle—but with the right strategy, it’s not just possible, it’s powerful. Let’s cut through the noise and look at the real issues... and the smart solutions that pave the way to a leaner, more future-ready ERP.

Common Challenges (and Why They’re Not Dealbreakers)

Reliance on Custom Processes
Custom workflows often become second nature—but are they still serving you? Modern ERPs evolve with industry best practices baked in, and chances are, today’s standard features do what your custom code used to… only better.

Budget & Time Constraints
Testing, retraining, consulting—it all adds up. But the long-term payoff? Reduced technical debt, faster upgrades, and major gains in efficiency and scalability.

User Resistance
Change is hard, especially when teams are comfortable with their tools. But clear communication and a strong change management plan can turn skeptics into champions of a smarter, streamlined system.

Reality Check: Has Your Business Outgrown Its Customizations?
Are workarounds piling up? Are outdated custom features slowing things down? It might be time to re-evaluate. Often, organizations discover that what once required custom code can now be handled with out-of-the-box functionality.


Did You Know?

  • ERP Upgrades Can Eliminate 25%–50% of Customizations.
  • Modern ERP systems, like Infor LN and Baan, now include many features that used to require custom development.


Smart Alternatives to Customization

  • Use Standard APIs & Libraries
    Modernize without disrupting. Refactor your code to integrate cleanly with the ERP’s built-in APIs—no more core modifications.
  • Tap Into Infor Extensibility & LN Studio
    Need to tweak something? Use Extensibility for light changes or LN Studio for deeper custom apps that don’t compromise ERP integrity.
  • Simplify Integrations with Infor ION
    If your customizations are all about connecting systems, ION has you covered with seamless, low-code integration across platforms.
  • Build with RMCgen
    Need custom development? RMCgen lets you create new components without ever touching standard ERP code—flexibility and stability.
  • Get Insights with Dashboards, Not Code
    Custom dashboards deliver actionable insights without bloating your ERP. Use analytics tools to tailor views for every role.
  • Embrace Built-In Reporting Tools
    Skip the custom report scripts. Infor Report Designer, Document Management, and BIRST give you the power to build rich reports—no dev time required.


Your Custom Inventory: Time for a Health Check
Not sure where to begin? Start by assessing your existing custom components. Crossroads RMC can help you pinpoint which ones are still pulling their weight—and which can be retired or replaced with smarter tools.


💡 Let’s Talk Solutions
Ready to unlock the full potential of your ERP—without dragging legacy code along for the ride? Crossroads RMC is here to help.

📞 800.762.2077
📧 solutions@crossroadsrmc.com
💬 Or Request a Consultation to start your journey to a flexible, future-proof ERP.

Print
10770 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories