Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 38504 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 75825 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 82397 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 32949 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 68904 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 103889 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance

Kathy Barthelt 0 98763 Article rating: No rating

In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax.

 

In Infor LN, users can select or clear the new Include Tax in Order Balance check box in the COM Parameters (tccom0000s000) session to indicate whether users want to include tax amounts in the order balance amount. This parameter has an effect on various sessions in Order Management.

First124125126127129131132133Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

What is preventing you from upgrading your Infor LN or Baan ERP System?
Kathy Barthelt

What is preventing you from upgrading your Infor LN or Baan ERP System?

Your answer to this question is likely customizations… customizations that were once the best thing since sliced bread but now have become the bane of your existence.

There is something you can do about it! 

Crossroads RMC has many options for dealing with customizations: 

  • Customizations can be re-written to call standard Baan or Infor LN functions via APIs, libraries, BODs, and BDEs.
  • Your customizations can be re-programmed using Extensibility for smaller customizations and LN Studio for larger customizations.
  • RMCgen can be used to create your own custom components without modifying standard programs.
  • Analytics Dashboard allows for an endless variation of Infor LN or Baan views to be created all without touching your ERP system.
  • Infor Report Designer and Infor Document Management can be used to create your own custom-designed report output.
  • Crossroads partners with Nazdaq to deliver custom-designed reports through the B2Win Suite which also integrates with Infor Document Management.
  • New functionality in the latest version of the ERP software may allow you to eliminate many of your customizations.

It all starts with an assessment of your custom components. This is something that can be done internally by you, or with the assistance of Crossroads RMC consultants.

Why continue to live with the elephant in the room who insists on blocking the doorway to progress? Start the process today to get rid of the customizations that are preventing you from taking your ERP system to the next level. Contact us today to learn more: 800.762.2077, solutions@crossroadsrmc.com, or request a phone consultation.

Previous Article The Importance of an Integrated System
Next Article How well does your ERP Serve your Finance team?
Print
72804 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories