BPCS/LX Tip of the Week: Shop Order Status

Anthony Etzel 0 84513 Article rating: No rating

You can see the status of the Shop Order when using SFC300 Shop Order Inquiry. You want to be sure that your shop orders are at the correct status in order to report against them.

The following are the shop order status codes:

04 = The Shop order has been entered.

05 = The Shop order has been released and printed.

14 = The Shop order has been released, but not printed. If a shop order is at this status, you have released it and it is not printed due to a system failure, or the order has been put on hold.

XX = The Shop order is closed.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 86200 Article rating: 4.0
For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

Baan/LN Tip of the Week: What could go wrong with GRINYA?

Kathy Barthelt 0 80979 Article rating: No rating
One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan/LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error. It is recommended that the Integrations Setup tables be audited either through Baan or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Baan/LN Tip of the Week: Differentiating An Item By Supplier - LN

Kathy Barthelt 0 79682 Article rating: No rating

In LN, you can differentiate between items at various suppliers:

  • Locations (warehouses),
  • Purpose (planning, purchase)
  • Origin (supplier, warehouse)

Example

An item is supplied by two different suppliers. Supplier A ships in lots of 100 pieces due to how the item is packed. Supplier B ships the goods in units of 60 pieces.

You can define specific parameters for each supplier. The following sessions can be used to define these characteristics:
 
  • Items - Planning (cprpd1100m000)
  • Check Item Data by Warehouse (whwmd2210m000)
  • Item Supplier Plan (cpvmi0530m000)
These sessions define entities that have an n-to-1 relationship with the general item data.

 

BPCS/LX Tip of the Week: Inventory Control

Anthony Etzel 0 90393 Article rating: No rating

In Infor LX you need to determine how inventory will be moved in and out of warehouse storage locations, and which of the following transactions to use for inventory control:


  • A transfer transaction can be used to move inventory from one warehouse location to another warehouse location.
  • A production receipt transaction is used to add inventory to a warehouse location.
  • A material issue or backflush is used to reduce inventory from a warehouse location.

New Definition of Insanity: Collect data the same old way

Anthony Etzel 0 91998 Article rating: 5.0

Just because you've always done it this way doesn't mean it's the best way. The old way of doing things may get the job done, but is the job being performed efficiently, accurately, and on a timely basis?

People resist change because there is an element of fear behind change and having to learn something new. Sometimes it’s just that you’re comfortable with how things are done, and you don’t see the need to make any changes. 


Are you stuck in manual?

Improve Profit and Cut Costs at the Same Time

Crossroads RMC 0 42673 Article rating: No rating

Want to Improve Profit and Cut Costs at the Same Time?

“Real-time executives averaged a 14% improvement in operating cash flow and achieved a 6% reduction in operating costs” According to the Aberdeen Group.

So, how do you accomplish this great feat? By streaming real-time data to the executives.

The need for visibility into what is happening in the trenches, and the comprehensive understanding of key metrics and their implications for overall performance, are critical for an organization to be at the “top of their game”.   read full article>

Learn how Crossroads RMC can provide for this data streaming with Analytics Dashboards.

Industry News: How Small and Mid-Sized Manufacturers Can Harness the Transformative Power of Technology…

Crossroads RMC 0 46033 Article rating: No rating

Industry-Specific Technology Changes the Game:

"One of the most significant changes has been the development of software and enterprise-wide technology that is designed to specifically meet the needs of particular industries. This has multiple advantages. The technology doesn’t have to be “over-configured” to be functional; the functionality is built-in. It can also be deployed quickly and cost-effectively, with less effort and less risk." Industry Week Article by Kelly McGowan, American Securities.

 

Crossroads RMC has software that has been built specifically for your industry. Learn how Analytics Dashboard can improve your efficiency, productivity, and quality while driving down costs.

First123124125126128130131132Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: Product Configurator - Part 2

Baan Tips

Who gets involved?
  1. Most commonly Engineering is involved in writing the rules, creating the bills and routings.
  2. Sales or Customer Service determines the questions and the order they are asked in.
  3. Sales or Customer Service determines the rules for the pricing.
  4. Sales, or Customer Service, and Engineering work together in determining the part number, description and text.

What are the steps?

  1. You must start by defining the features and options (questions and answers) and the order in which these are asked. We work this out first using sticky notes and large easel paper. Normally during the process we find that we want to move these questions around. Setting them down on paper makes the process of getting the data into Baan much more efficient. We also then have a record of what decisions were made prior to entering the data. This is normally a joint effort of Engineering and Sales. This is required and must be the first step.
  2. Constraints for features and options. These are the rules for determining what questions are asked and which options are allowed. This is generally done by Engineering or whoever is responsible for the configurator. This is required.
  3. Generic Bill of Material. All possible bill options are entered here and constraints are written to determine which options are selected based on the answers to the questions. This is generally done by Engineering or whoever is responsible for the configurator. This is a required step.
  4. Generic Routing. Similar to the bill of material, but used for generation of the routing steps. This is generally done by Engineering or whoever is responsible for the configurator. This is optional.
  5. Generic Item Data. This consists of creating custom item numbers, descriptions, text, material, size or standard fields in the custom item master. This is generally done by Engineering or whoever is responsible for the configurator though Sales may have some involvement. This is optional.
  6. Generic Pricing. This is used to calculate the selling price based on the answers to the questions. This is normally a responsibility of Sales or whoever determines the pricing. This group is also trained on writing the constraints for this section only. This is optional.

What other modules will be affected?
  1. Quotes, sales orders and projects.
  2. PRP planning for the configured items.
  3. Managing changes to the configuration. Who, what and when?
  4. Variant statistics.
  5. MPS and generic items.
Previous Article Baan/LN Tip of the Week: Product Configurator - Part 1
Next Article Baan/LN Tip of the Week: Printing Pick Lists
Print
112372 Rate this article:
3.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories