Baan/LN Tip of the Week: Company Calendar

Kathy Barthelt 0 74514 Article rating: No rating

Baan uses the company calendar in the following modules to determine the start and end dates for planned orders:

  • Master Production Scheduling
  • Material Requirements Planning
  • Capacity Requirements Planning (All three combined in a single planning module for Baan V and LN)
  • Shop Floor Control

The calendar provides the valid working days, number of shifts per day and the number of hours in a day.

Baan allows for a single calendar for the whole company or for a calendar for each work center.

BPCS/LX Tip of the Week: SFC600 & SFC650

Anthony Etzel 0 86816 Article rating: No rating

These programs are used to capture and post shop floor information. Labor reporting, machine time, etc. can be captured by either program. The key difference is that one will also capture the production receipt and backflush components. Based on your company information / transaction process, one of these programs will most likely be used daily to capture current shop floor data. You can use the shop packet labor ticket for the manual recording, and the keying of the data. Alternatively, you can incorporate an automated method like an MES solution to capture the data and streamline the process.

Crossroads RMC to Exhibit at Manufacturing Matchmaking 2014

Crossroads RMC 0 45048 Article rating: No rating
Crossroads RMC will exhibit at the inaugural Illinois Manufacturing Excellence Center (IMEC) Manufacturing Matchmaking Event 2014 on September 23, 2014. Manufacturers from across the state of Illinois will come together at this event to discuss ways to improve the productivity and competitiveness of Illinois' small and mid-sized manufacturing firms.

BPCS/LX Tip of the Week: What is the bubble number and how do I maintain it?

Anthony Etzel 0 78965 Article rating: No rating

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

Baan/LN Tip of the Week: Setting Up New Employees in LN

Kathy Barthelt 0 75229 Article rating: No rating

In LN, the People package is used to register the employee’s hours and expenses. To support the People package, the Employees - General (tccom0101m000) session only contains the general employee data.

The title of the Employees - General (tccom0101m000) session was changed to Employees – General (tccom0101m000).

From the Employees - General (tccom0101m000) session, users can start the following sessions to define the more specific employee data:

  • Employees - People (bpmdm0101m000).
  • Employees - Project (tppdm8101m000).
  • Employees - Service (tsmdm1140m000).
  • Skills by Employee (tcppl0120m000).
  • Employees by Team (tcppl0150m000).
  • Roles by Employee (tcppl0170m000).

After users define the employees, users can also start the listed sessions from the Employees Dashboard (bpmdm0101m100) session in People.

Baan/LN Tip of the Week: Month End - Miscellaneous To-Do's

Kathy Barthelt 0 71931 Article rating: No rating
  • Print Sales Order History Information
    • all invoices processed through sales
  • Check Inventory Valuation
    • this should tie out to your inventory accounts
  • Print Integration Information
    • see all postings from WIP to finished goods
  • Print G/L Transaction Information
    • print specific transaction types for any GL account
  • Print Lot Control Information
    • will show where serial numbers were used

BPCS/LX Tip of the Week: Why Define Location Fields in the Work Center File

Anthony Etzel 0 73957 Article rating: No rating

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

If ERP is plumbing for the Enterprise; How do we unplug it and keep it from making a huge mess?

David Dickson 0 55657 Article rating: 5.0

I have been working with ERP in various roles for over 30 years, directly involved in over a hundred implementations, while my company has been involved with over 300 more. Of course, in many ways the systems we use today are completely different from what we used in the ‘80s – back then it was green screens, simple transaction entry forms, and cumbersome updates (at best) to link what one department did with all the other areas that needed access to that information. Then there were those planning programs that took all the information along with various parameters the users needed to set and told us what to do.

The More Things Change, the More They Stay the Same

First120121122123124125127129

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for TECHNOLOGY: Archiving Concept

Companies are developing procedures for entering data into an ERP system and for archiving manuals, drawings, specs, and other hard-copy documents. However, in many cases there is no defined procedures to store historical electronic data. Archiving electronic data should be an integral part of your business processes. 

Generally, archiving is the process of moving historical data from the operational environment to a special archive environment. At home, you might move old bank statements from a closet in your study to a box in the attic. At the office, you might store old hard copies of purchase orders in a room far from your own desk. Just because you no longer need the information in your daily work, does not mean you can dispose of the information. In terms of electronic data in your ERP system, archiving means moving historic data from the operational company to a special archive company; in that way, the historic data will be out of your way and safely stored. To free up disk space on your machine after you have archived the data, you can also move the historic data to an external medium.

Archiving strategy:
Archiving historical data is an irreversible process. After data is moved to the archive company, the data can no longer be uploaded back into the operational company. Archiving has a direct effect on the accessibility and availability of information; therefore, you must define a robust archiving strategy which addresses three major topics: What, When, and Who.

Business requirements:
Your business requirements determine what must be stored and for how long. For example, if you have a warranty situation on your projects for five years, you might be required to keep your project open during this time, or you may keep the project in an archive company. Therefore, if the project must remain open, no project-related information, including orders and integration transactions, can be archived.

Every business manager must decide how long what data must be stored in an operational environment for quick access. Reporting requirements must also be listed.

Legal requirements:
In most countries, legal requirements apply to financial data. Tax authorities may require financial data to be stored for a minimum number of years. Additionally, in specific lines of business such as food and beverages or aerospace, governments maintain specific legal requirements, which impact your archiving strategy.

User requirements:
Users rely on historical information. For example, a customer service employee may need to have shipment information of up to one year in the past to accurately address customer queries. These requirements must also be taken into account when you define what can be archived.

Data to be archived or deleted:
Various parties related to your company use information based on logistical and financial transactions occurring in the past. Before you archive or delete this information, you must investigate the need for the information.

Your ERP system contains standard archiving sessions in all major modules. These sessions are designed to copy historical data to the archive company, and then delete the data from the operational company. 

You have three options in archiving sessions:

  1. Archiving and deleting: Data is transferred to the archive company and then deleted in the operational company.

  2. Deleting: Data is deleted in the operational company, but not archived.

  3. Archiving: Data is transferred to the archive company, but not deleted in the operational company.

Using option 1 or 2 makes archiving irreversible. If you archive only because you want to preview the results, the archiving can be done a number of times.

Usually, in archiving sessions, you can also specify:

  • The date up to which the data must be archived
  • If texts must also be archived
  • If texts that already exist in the archive company must be replaced

In addition to archiving logistical and financial data, you can archive general data. 

Delete sessions:
In all major modules, your ERP system contains delete sessions. These sessions only have delete functionality, no archive functionality. Consequently, they are used to clean up data in the operational company, not to transfer data to the archive company. For more information about these delete sessions, see the "Delete sessions" sections under the various modules. For example, see Delete sessions under Procurement.

After data is deleted using delete sessions, the data is no longer available in the operational company. However, parameter settings may determine whether history data is logged when you remove specific data. If required, you can archive the history using the appropriate archiving session.

When can data be archived?
Based on the answers to the previous question, you can now set a term of retaining relevant historical data in your operational environment, and a term of keeping data available in the archive environment.

Who can archive data?
Because archiving is an irreversible process, a certain risk is involved. For example, what if one of your employees starts up an archiving session by mistake? For this reason, you must determine who is authorized to archive and delete data, and then set up these authorizations with the functionality your ERP system offers.

Because no further changes must be made to archived data, access to the archive company must also be restricted to read-only authorization for most users.

Match strategy with ERP functionality: 
After you list all your requirements, the next step is to verify whether the standard ERP functionality is sufficient to facilitate your needs. Usually, your ERP system provides the functionality to meet all of your needs, but must not force you to compromise. We recommend that you avoid customizing your software, however, because we are looking for long-term operational-data storage, customizations must not be ruled out entirely. An example is the requirement to show, in one report, the data from the operational company and archive company. In the current version, this is not standard functionality, but this can be important to manage your business. What can be even more important, if you are using customized software, is the question of whether the archiving sessions have been included. Do you take into account the fields and tables you have customized? Customized tables and fields may have to be included when performing delete/archive runs.

Archiving plan:
After you define an archiving strategy that suits your requirements, you can define the archiving plan. In this plan, you translate the strategy to a more operational level.

Contact Crossroads RMC— Let's take the next step together to execute your archiving plan.

800.762.2077

Previous Article Infor LN & Baan Tips & Tricks for OPERATIONS: Blocking or Unblocking Warehouses
Next Article Infor LN & Baan Tips & Tricks for FINANCE: Remap Posted Integration Transactions (tfgld4282m100)
Print
43198 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories