Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Uses for LX Bill of Material

Anthony Etzel 0 89879 Article rating: No rating
In Infor LX, based on how your items are set up and on how you structure the Bill of Material, the following are some usages of a bill of material by functioning area:

  • Engineering & QA – change control, product design and specifications
  • Manufacturing – build instructions , material pick lists
  • Accounting – product costing
  • Materials Inventory – material and inventory planning
  • Sales – customer order processing
  • Production Scheduling – item scheduling (also a component of an MES solution)

Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance

Kathy Barthelt 0 73601 Article rating: No rating
In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax.

In Infor LN, users can select or clear the new Include Tax in Order Balance check box in the COM Parameters (tccom0000s000) session to indicate whether users want to include tax amounts in the order balance amount. This parameter has an effect on various sessions in Order Management.

Why Your Operation Doesn’t Stand a Chance in Hell of Going From Good to Great (and What to do About it)

David Dickson 0 111486 Article rating: 5.0

You dream of building a manufacturing powerhouse.

An operation with loads of throughput, profit, and efficiency in every process to make your products the best quality you can make them.

You want to be as successful as the factories and companies they write about in books like  Good to Great, changing your operation, and even motivating and inspiring your teams to do so too.

But you know you haven’t got a chance in hell of seeing that kind of success unless you can truly change and make significant differences over the long haul.

Of course, the big question is How? 

BPCS/LX Tip of the Week: Indirect Labor Reporting

Anthony Etzel 0 80312 Article rating: No rating
In the Shop Floor Control Module, you have the ability to key in both direct labor and indirect labor. However you want to establish specific types (reasons) for the indirect labor. The SFC600 labor entry program shows a reason code field, but it is designed for reject quantity and machine downtime reasons, not indirect labor reasons.

There is a way around this. With an MES solution you have the ability to setup and report indirect time against a specific reason code.

Baan/LN Tip of the Week: Configuring Items in Infor LN

Kathy Barthelt 0 90144 Article rating: No rating

In Infor LN, the configuration of a generic item not always results into a customized item. Configured items can now be customized items as well as standard items. If users configure items without PCS projects, standard items are generated instead of customized items.

Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance

Kathy Barthelt 0 78770 Article rating: No rating
In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax.

In Infor LN, users can select or clear the new Include Tax in Order Balance check box in the COM Parameters (tccom0000s000) session to indicate whether users want to include tax amounts in the order balance amount. This parameter has an effect on various sessions in Order Management.

BPCS/LX Tip of the Week: Shop Order Status

Anthony Etzel 0 83364 Article rating: No rating

You can see the status of the Shop Order when using SFC300 Shop Order Inquiry. You want to be sure that your shop orders are at the correct status in order to report against them.

The following are the shop order status codes:

04 = The Shop order has been entered.

05 = The Shop order has been released and printed.

14 = The Shop order has been released, but not printed. If a shop order is at this status, you have released it and it is not printed due to a system failure, or the order has been put on hold.

XX = The Shop order is closed.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 85020 Article rating: 4.0
For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.
First120121122123125127128129Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Crossroads RMC

Revamp Your Productivity: Discover Crossroads RMC's Ultimate Solution

In the dynamic landscape of life hacks and evolving routines, finding new ways to enhance productivity is always on our agenda.

Enter Crossroads RMC – your secret weapon for multiplying productivity effortlessly! Imagine elevating your team's output by integrating just ONE additional member, available on-demand. What sets this apart is the convenience of access—our specialists are ready to assist you 24/7, even during weekends and holidays.

Introducing Tailored Staff Augmentation Services by Crossroads RMC:

  • Access to functional and technical support around the clock.
  • In-depth expertise as an Infor Partner across all Infor LN / Baan and Infor LX / BPCS versions.
  • Centralized, dedicated support ensuring quick response times and thorough follow-up.
  • Varied communication channels including phone, text, email, online portals, Microsoft Teams, web meetings, and in-person visits.
  • Transparent monthly reports to monitor service utilization.
  • Comprehensive ERP disaster recovery solutions.
  • Specialized ION support.


Kickstart with a complimentary 1-hour consultation to explore our customizable staff augmentation plans. These plans are crafted to simplify case logging, usage tracking, meeting scheduling, live chatting, Infor resource reviews, and much more.

Ready for a transformative consultation? Secure your free 1-hour session:

Leverage decades of manufacturing ERP and IT expertise for your enterprise. Crossroads RMC designs Staff Augmentation Services with your needs in mind.  Get in touch: 800.762.2077

Explore Our Services:


Client Accolades:

"The support from Crossroads RMC was a highlight in my 20 years in the field; having been a consultant myself, I found Hugh Carty and Luis Diaz not only technically adept but also exceptionally respectful and polite to our team. They embody the ideal consultant profile. We'd eagerly engage them again for future needs." - IT Director

"Our project's success speaks volumes, and Crossroads RMC's contribution was pivotal. Their team brought unparalleled expertise and project management to the table, making them an indispensable part of our journey. Collaborating with Crossroads RMC has been an absolute delight." - IS Manager

Print
12646 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

x

Categories