Baan/LN Tip of the Week: GRINYA

Kathy Barthelt 0 109653 Article rating: 3.0
GRINYA is one of the more complex issues in ERP Finance. GRINYA is the tracking via ledger account of the value of items received on a purchase order that have not been matched to a supplier invoice.

Baan solutions for Baan IV and V were incomplete. To take full advantage of the current GRINYA reconciliation process, check Infor solution #107147, which contains the GRINYA user manual and a link to download the software for your version of Baan. For ERP LN, look at Document Code U8942C US.

It is called User Guide for Reconciliation and Analysis. If you are not running the latest GRINYA solutions, patching will require a good amount of time in filling the Interim tables this solution runs from. Infor has posted several procedural write ups, so check the Support Site and read up before tackling this for the first time.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 81624 Article rating: No rating
For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

BPCS/LX Tip of the Week: The Item Master Requirements Code

Anthony Etzel 0 76385 Article rating: No rating

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

Grindmaster Cecilware Selects Crossroads RMC For Baan IV / Davisware Integration

Crossroads RMC 0 41008 Article rating: No rating

Grindmaster Cecilware, a leader in the development of products for the food and beverage industry, has selected Crossroads RMC to integrate their Baan IV system to Davisware Global Warranty. Davisware is an electronic customizable online solution that fits almost any warranty process. Grindmaster’s customers will be able to access the Davisware software online and process warranty claims which will then automatically feed back into the Baan IV system for further review and processing. The integration is expected to go live in Q1 of 2015.

Huf North America Goes Lives With Next Phase of RMC3 Data Collection

Crossroads RMC 0 42221 Article rating: No rating

Huf North America, a global leader in the production of mechanical and electronic key systems, lock sets, steering locks, and remote control systems for the automotive industry, has gone live with phase 2 of their Crossroads RMC data collection implementation. This go-live included Report Orders Complete, Labor Reporting, Material Issue, Inventory Transfers, barcode label modifications, as well as custom applications for their Paint / Polishing operations. This go-live was paired with the expansion of Huf’s Plastic Injection Molding and Paint Facility in Greeneville, TN. The next phase of this project will include the extension of the Crossroads RMC solution into Huf’s facility in Mexico.

Baan/LN Tip of the Week: Product Configurator - Part 2

Baan Tips

Kathy Barthelt 0 109478 Article rating: 3.0
Who gets involved?
  1. Most commonly Engineering is involved in writing the rules, creating the bills and routings.
  2. Sales or Customer Service determines the questions and the order they are asked in.
  3. Sales or Customer Service determines the rules for the pricing.
  4. Sales, or Customer Service, and Engineering work together in determining the part number, description and text.

What are the steps?

  1. You must start by defining the features and options (questions and answers) and the order in which these are asked. We work this out first using sticky notes and large easel paper. Normally during the process we find that we want to move these questions around. Setting them down on paper makes the process of getting the data into Baan much more efficient. We also then have a record of what decisions were made prior to entering the data. This is normally a joint effort of Engineering and Sales. This is required and must be the first step.
  2. Constraints for features and options. These are the rules for determining what questions are asked and which options are allowed. This is generally done by Engineering or whoever is responsible for the configurator. This is required.
  3. Generic Bill of Material. All possible bill options are entered here and constraints are written to determine which options are selected based on the answers to the questions. This is generally done by Engineering or whoever is responsible for the configurator. This is a required step.
  4. Generic Routing. Similar to the bill of material, but used for generation of the routing steps. This is generally done by Engineering or whoever is responsible for the configurator. This is optional.
  5. Generic Item Data. This consists of creating custom item numbers, descriptions, text, material, size or standard fields in the custom item master. This is generally done by Engineering or whoever is responsible for the configurator though Sales may have some involvement. This is optional.
  6. Generic Pricing. This is used to calculate the selling price based on the answers to the questions. This is normally a responsibility of Sales or whoever determines the pricing. This group is also trained on writing the constraints for this section only. This is optional.
First118119120121123125126127Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Crossroads RMC is proud to introduce our new Production Order Variance Reports package for Infor LN

The package includes numerous reports and sessions to view the variances in a way that Finance can identify problems based on the Finance Integration Transactions in the General Ledger.

There are a few main sessions with many detailed sessions linked to them. The reports can be run from the main Print Production Order Variance Reports or in the individual detailed session.

Sessions included in the report package:

1. Print Finalized Trans – Variance Reports.

a. Financial Trans. by L/Acct – Prod. Order Variances - Recap

b. Financial Trans. by L/Acct – Prod. Order Variances – Details

2. Update Production Order Variances (updates special variance table).

3. Production Order Variance Overview – Main view

a. Production Order Variance Details

b. Price Variance Details – Material Variances

c. Price Variance Details – Operation Variances

d. Efficiency Variance Details – Material Variances

e. Efficiency Variance Details – Operation Variances

f. Efficiency Variance Details – Reject Variances

g. ACO Variance Details – Reject Variances

h. Accept Production Order Variances

i. Un-accept Production Order Variances

j. Finally Accept Production Order Variances

4. Print Production Order Variance Reports:

a. Production Order Variance – Overview

b. Production Order Price Variance – Material Revaluation

c. Production Order Price Variance – Operation Revaluation

d. Production Order Efficiency Variance – Material

e. Production Order Efficiency Variance – Operation

f. Production Order Efficiency Variance – Rejects

g. Production Order ACO Variance – Rejects-Additional Costs

5. Delete Production Order Variances (used to redo a month)

Contact Kathy Barthelt to learn more.

Previous Article About 65% of the world’s population are visual learners. This extends into the ERP software realm, too.
Next Article Infor LN & Baan Tip of the Week: Customer Defined Fields
Print
71709 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories