Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 61221 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

BPCS/LX Tip of the Week: Receiving to Inspection

Anthony Etzel 0 68378 Article rating: No rating

If the item being received needs to be inspected prior to being available for use, there are two schools of thought.

The first is to receive the item to a QC hold location. The downside is the item will show up in on hand inventory.

A better method would be to do a PO receipt to inspection. Both Inv500 and Pur550 support this method. Now you have received the item without showing it in inventory. Only the PO quantity in inspection is updated. This method also allows you to create an Inspection Dispatch Report. After the QC process for the item is complete, then the transaction Receipt from Inspection to Stock is processed. That transaction then updates the PO quantity received field and the Item on hand field in inventory.

Baan/LN Tip of the Week: Purchase Inquiry

Kathy Barthelt 0 87135 Article rating: No rating

In Baan IV Purchase Control, the purchase inquiry procedure enables the user to:

  • Request a specific supplier to submit a quotation on the purchase inquiry for the delivery of an item.
  • Compare the prices and discounts of the quotations that are submitted by different suppliers.
  • Copy the inquiry data to a purchase order.


In LN, you can:

  • Request multiple business partners to submit a quotation on a specific request-for-quotation for the delivery of an item.
  • Compare the received quotations based on the following criteria:
  1. Price
  2. Quantity
  3. Vendor rating
  4. Delivery dates
  5. RFQ subjective criteria
  • Copy the quotation data to a purchase order, a purchase contract, or a price book.

BPCS/LX Tip of the Week: Shop Order Release Date

Anthony Etzel 0 60482 Article rating: No rating

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 62997 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

Filtec Selects Crossroads RMC for Baan Data Collection

Kathy Barthelt 0 30189 Article rating: No rating

Filtec, a leading provider of in-line inspection solutions for the food, beverage, and pharmaceutical industries, has selected the Web Collect, formerly RMC3 data collection solution from Crossroads RMC for their Baan IV system. Filtec plans to implement Labor Reporting and Report Operations Complete as part of this project with the goal of eliminating manual data entry and gaining better visibility to gap time. The project is scheduled to go live in early November 2015.

BPCS/LX TIP OF THE DAY: MATERIAL REQUIREMENT DATES AND LEAD TIME OFFSETS IN MRP

Anthony Etzel 0 65886 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

Baan/LN Tip of the Week: Data Sizing Moving to LN

Kathy Barthelt 0 64233 Article rating: No rating

The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume.  Set the autogrowth to a minimum of 10 percent or 1 GB (for each extent) to avoid fragmentation on file system level. Never use the default extent size of 1 MB.

First118119120121123125126127Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE: Copy Received Purchase Invoices (tfacp1210m000)

When the invoice is copied, the status in the Invoice Status field in the Received Purchase Invoices (tfacp1500m000) session is set to Registered. The invoice cannot be copied again.

Note: If you have started this session using the browse arrow, you can only find and select a record.

Field Information

  • Invoice-from Business Partner: The invoice-from business partner
  • Document - The document number: The document number is a sequence number under which the invoice is temporarily recorded. When an invoice is registered officially, you must assign the invoice to a different number, in combination with a transaction type.
  • Business Partner Invoice Number: The invoice-from business partner's invoice number is the invoice identification used in LN: This number is printed as the payment reference when the invoice is paid.
  • Invoice Date: The date printed on the invoice. This date is used as a reference date for the term of credit allowed.
  • Currency: The invoice currency
  • Amount: The invoice amount

OPERATIONS: Production Order Parameters

To avoid having to report quantities also at the order level, set the Post to Inventory when Reporting on Last Operation parameter to Yes in these sessions:

  • Production Order Parameters (tisfc0100s000) > Planning tab
  • Production Settings by Site (timfc0180m000) > Production Order tab

With regard to as-built handling, because JobControl acts as a reporting tool similar to the Machine Work List (tisfc4600m000) session, we recommend these settings in the Production Order Parameters (tisfc0100s000) session (Miscellaneous tab) and Production Settings by Site (timfc0180m000) session (Production Order tab):

  • In the Serials section, set the Generate Serial Numbers parameter to On Printing Documents or On Release as the serial number that can be selected in JobControl to report completed or rejected products must have the Valid status in LN.
  • In the Serials section, we recommend setting the As-Built Status Handling parameter to Manual as the serial number assignment is performed in JobControl.

TECHNOLOGY: Audit Configuration Management

You use LN audit features to fully or partially log changes that users make to the LN database tables when they use LN sessions.

The audit functionality is based on the concept of audit profiles. In an audit profile, you define which tables and fields are audited and when, in the context of an audit profile. To bundle profiles in the same functional area, you can relate the profiles to audit categories. You can export and import audit profiles with various options to enable a quick configuration. The audit trail is stored in sequence files, which are generated for each combination of company and table.

Note: For some important parameter tables it is required that auditing is enabled.

You can view or print the history of modifications.

Previous Article Infor LN & Baan Tips & Tricks for OPERATIONS: Blocking Operations
Next Article Infor LN & Baan Tips & Tricks for FINANCE: Copy Received Purchase Invoices (tfacp1210m000)
Print
58 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories