Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LX/BPCS Tips & Tricks for OPERATIONS: Multi-Level Shop Order Release Due Dates

George Moroses 0 12552 Article rating: 5.0

Previously, Material Requirements Planning (MRP) preferred practices meant that the component's due date was the same as the parent's shop order release date. Because MRP trends have changed, the preference for this due date is the day before the release date of the parent. Although Infor LX already has this functionality in Shop Order Maintenance programs (SFC500), users could not change how due dates were determined for lower-level shop orders in Multi-Level Shop Order Release, SFC530D.

This enhancement provides an additional parameter for Multi-Level Shop Order Release. This parameter allows the user to change how the due date of the child components is determined. The Multi-Level Shop Order Release, SFC5302, has a new parameter for shop orders. The Due Date of Children = Release Date of Prent (Due Date of Children) field allows the user to set the due date determined for multi-level shop orders.

Infor LX/BPCS Tips & Tricks for FINANCE: Override Exchange Rate

George Moroses 0 10205 Article rating: 5.0

This feature uses different exchange rates in the user's inventory processes by using new macros in Post Inventory to G/L, INV920D. INV920 used macros limited by the Override Exchange Rate parameter set on the book in Book Definition, CEA105D3. If the Override Exchange rate parameter is set to No, the macro uses the Rate Type of the Book. If the Override Exchange parameter is set to Yes, the macro uses the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Warehouse Company, Order Company, or the Book regardless of the Override Exchange Rate parameter in the Book.

Infor LX/BPCS Tips & Tricks for TECHNOLOGY: Change SyncBillofMaterial BOD

George Moroses 0 12971 Article rating: 5.0

This enhancement provides the ability to enable setting facility-specific bill of material BOD's accounting entity from the facility's stocking warehouse's company. The bill of material BOD can be consistent with the bill of resources BOD which sets its accounting entity from the company associated with the facility's stocking warehouse.

Crossroads RMC Presents 4 Must-Attend Sessions at inPOWER 2024

September 23-26, 2024

George Moroses 0 10623 Article rating: 5.0

Crossroads RMC Presents 4 Must-Attend Sessions at inPOWER 2024
Empower Your Business with Innovation

September 23-26, 2024

As a Gold Sponsor, Crossroads RMC is thrilled to present four impactful LX Track sessions this year, designed to inspire and empower attendees to drive success within their organizations:

Infor LN & Baan Tips & Tricks for TECHNOLOGY: Adding a Timestamp to LN Standard Tables

Kathy Barthelt 0 31075 Article rating: 5.0

Table Timestamp Definitions (ttadv4136m000)

Use this session to define timestamps for Infor LN tables. A timestamp is an additional column that stores the date and time of the last change for each record.

Timestamps are utilized by features like the extraction logic of CPM Enterprise Analytics. They enable CPM to perform incremental data extractions. For example, CPM can use the timestamps to extract records that were changed during the last week in a weekly extraction process.

To Create Timestamps...

Infor LN & Baan Tips & Tricks for OPERATIONS: Absorbing Cost Items into Projects

Kathy Barthelt 0 20732 Article rating: 5.0

Operations: To absorb the cost of cost items into specific projects, you'll need to handle them as customized items. However, cost items cannot directly be defined as customized items. Customized items must be physical, either manufactured or purchased.

That said, it's still possible to absorb cost items into a project, although indirectly. Here's how:

  1. Set Up Ledger Account: First, create a new ledger account in session tfgld0508m000 and set the type to "PCS" (project) in the operations management integrations. This account will be used for matching and approving purchase orders for cost items.

  2. Create and Activate Projects: Ensure that the necessary projects are created and set to active status.

  3. Purchasing Cost Items...

First7891012141516Last

Tips:  LX | BPCS | M3

Finance:  Enhancement Summary: Tax Code Table Window (WINZRTD)

Overview
A significant enhancement has been introduced to the Tax Code Table window (WINZRTD) to improve usability, accuracy, and customer support capabilities within the Finance module. This update includes new tax rate visibility features, streamlined prompts, and improved integration across the Order Entry and Purchase Order modules.

Enhancements Introduced

1. Tax Code Table (WINZRTD)

  • Added ‘Total Tax Rate’ column to...
Last

Tips: LN | Baan

Kathy Barthelt

Get the Latest Porting Set for Infor LN, Baan V and Baan IV

Porting set 9.3g has been released and is suitable for use by:
• Infor LN customers
• Infor Baan ERP 5.2a customers who have migrated the Infor Baan ERP 5.2a Tools to Infor Enterprise Server 8
• Infor Baan ERP 5.0b and 5.0c customers who have adopted SLM as described in document U8985F US: User's Guide to upgrade to porting set 8.2b or later
• Infor BaanIV c when the conditions for upgrading from the 6.1c.xx porting set line are met.

Previous Article Infor LN & Baan Tip of the Week: What Am I Able to “Extend” in Infor LN?
Next Article Is your company on an older version of Infor LX, BPCS, Infor LN, Baan, Infor M3 or Movex?
Print
79808 Rate this article:
4.5
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories