Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Indirect Time

Anthony Etzel 0 1002 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.
 

  1. If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  2. If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

 

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

 

10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 37289 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 71833 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 78750 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 31149 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 66732 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 99757 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

First114115116117119121122123Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Performance improvement by setting the First Free Number Cache (tcmcs0651m000)

Many transactions in all kinds of modules use order numbers or serial numbers. These order numbers are most often automatically generated. In the Number Groups (tcmcs0151m000) session you can define groups of order numbers used for dedicated areas. A Number Group is a group of the first free number series that you can assign to a specific use. All the numbers that Infor LN generates in the number groups that are dedicated to the same purpose are unique.

All the first free numbers are stored in the table tcmcs050.

As many different processes can request a free number from the number groups, we often see delays in the performance, due to locking on the first free number records. This locking issue can have a severe impact on the performance of huge batch-type transactions, but also on the performance perceived by individual users in many areas in LN.

For example:

  • Processing warehouse transactions. Single or in-batch
  • Completing / closing orders
  • Backflushing of production orders
  • Generate Order Planning
  • Cost calculation and warehouse revaluation


How this performance can be improved?

Resolution

In the Number Groups (tcmcs0151m000) session you can open the details of a specific Number Group (tcmcs0651m000) or start the session stand-alone.

In the Number Group, you define the Series with the related First Free Numbers. Per Serie in the First Free Number, you have the option to define the Cache Size.

This Cache size is defaulted on a value of 0 (zero). A cache size of zero means No Cache. How does the First Free Number caching works:

  • When the Cache Size is zero: With this setting a process requests a Free Number from the Serie and the first free number is issued to the process. But the first free number record is not updated yet. At the moment the requesting process is finished, without errors, it reports back that the number is used and the first free number record is updated. All the time that the process is working on the transactions the first free number record is locked. If another process is requesting a free number from the same series, it must wait (retries) until the record is updated and released by the previous process. This is the locking which is causing delays in the other processes.  
  • Setting the Cache Size to a higher value then zero activates the caching. When the Cache Size is set to 1 or higher, the requested free number is sent to the requesting process, the first free number is updated, with the number as defined in the Cache size, and the record is saved. It does not wait until the requesting process has reported back that is finished, with or without errors. In this way the record is immediately released and no locking will occur. If another process is requesting a free number, it does not need to wait until the free number record is released by the earlier process. If the process is ended with errors and therefor the number is not used, this number from the series is lost. This can result in gaps in the numbering. When the cache size is greater than 1, for example it is set to 5, the requesting process receives 5 free numbers. Even if it only needs less than 5. In this way the process only has to request for a new free number after it has used the first 5 numbers from the cache. This will also speedup the process in case of large batch transactions. For ‘warehouse integration users’, like for example Factory Track or WMS users we advise to set the cache size to 5.  

Note that financial documents are not based on number group series / first free numbers. Instead they are based on transaction type series, for which the caching functionality does not exist. Financial documents, like sales invoices, bank transactions, are thus not cached.

The caching is especially important to improve the performance of all logistical processes.

It is strongly recommended (mandatory) to set the Cache Size for all Number Groups to a minimum of 1.

Previous Article Infor LX / BPCS & Infor LN / Baan Tip: A New Wave of Cyber Attacks: Five Actions to Take Now
Next Article ​Infor LN & Baan Tip: Determining What Data to Archive or Delete
Print
26210 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories