BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 60893 Article rating: 3.0

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items

Kathy Barthelt 0 67219 Article rating: 3.0

If you have a parts warehouse and prefer to use SIC for planning (re-order point) but need to use MRP/MPS planning for production, create a non-nettable warehouse for the parts warehouse and run the SIC plan against that warehouse.

When running the SIC plan, be sure to set the Order System to “MPS to MRP” for Baan IV and to “Planned to Planned” for Baan V and LN.

Using this method you keep the parts inventory out of the production planning and in the hands of the parts warehouse planner.

BPCS/LX Tip of the Week: Indirect Time Reporting

Anthony Etzel 0 59610 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.

  • If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  • If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

Baan/LN Tip of the Week: Differences Between Constraint Planning in Baan IV and Enterprise Planning in LN

Kathy Barthelt 0 56077 Article rating: No rating

In Baan IV, a distinction is made between the actual ERP system and a separate planning tool which contains the Constraint Planning package. This tool was intended to work with any ERP system, not just with Baan IV. The Enterprise Planning package is now considered to be a package like any other package in Infor LN.

Users of Baan IV could choose whether they wanted to plan their supply in one of the following ways:

  • By using the MPS and MRP modules in the Manufacturing package.
  • By using the RPD and RMP modules in the Constraint Planning package.

Users of Infor LN can only use the Enterprise Planning package. The distinction between the MPS items and MRP items has been abandoned. In Infor LN, all items can be planned by using a combination of master-based planning methods and order-based planning methods.

Baan/LN Tip of the Week: Setting Up New Employees in LN

Kathy Barthelt 0 55798 Article rating: No rating

In LN, the People package is used to register the employee’s hours and expenses. To support the People package, the Employees - General (tccom0101m000) session only contains the general employee data.

The title of the Employees - General (tccom0101m000) session was changed to Employees – General (tccom0101m000).

From the Employees - General (tccom0101m000) session, users can start the following sessions to define the more specific employee data:

  • Employees - People (bpmdm0101m000).
  • Employees - Project (tppdm8101m000).
  • Employees - Service (tsmdm1140m000).
  • Skills by Employee (tcppl0120m000).
  • Employees by Team (tcppl0150m000).
  • Roles by Employee (tcppl0170m000).

After users define the employees, users can also start the listed sessions from the Employees Dashboard (bpmdm0101m100) session in People.

BPCS/LX Tip of the Week: Understanding What Goes On – Out on the Factory Floor

Anthony Etzel 0 59484 Article rating: No rating

Ok… so you want to know the status of a specific shop order that was released two days ago.

What do you do?

It’s a sure bet that you have a manager, supervisor, or planner who can walk the floor and find the order at whatever work center it happens to be at. He/she can then answer “what operations have been completed and how many were completed?” All this requires leg work, and of course, a fair amount of time.

Now, if you have setup your BPCS master files properly, and you report transaction activity, you should be able to get those shop order statuses much faster using the SFC300 Shop Order Inquiry Screen.

At your fingertips you can see:

  • Release date & due date
  • How many hours remain in total and at each operation
  • The quantity required, what was finished and the remaining quantity
  • What components (materials) have been issued

Pretty basic information, right? Are you getting what you need to know? If not, then you may want to reexamine how your BPCS files are setup and what transactions along with their frequency are captured.

BPCS/LX Tip of the Week: Changing the Master Schedule

Anthony Etzel 0 760 Article rating: No rating

You can change your master schedule by specifying the type of master schedule update to perform. You can run a Net Change or Regenerative Schedule.

You also have the ability to clear the lower level requirements out of the Planned and Firm-Planned Order file.

First109110111112114116117118Last

Tips:  LX | BPCS | M3

New IDF Inquiries 

Infor LX has a long history of providing IDF inquiries over most critical business areas, but there are still some areas that lack this capability.
The following IDF inquiries are now available in 8.4.2:

  • Customer Quote
  • Customer Quote Line
  • RMA (Return Material Authorization)
  • RMA Line

Benefits

  • Ability to sort, subset, filter, and view information in a modern and intuitive way
  • Point and click navigation to related information – 360 views
    • Exceptional personalization and extensibility capabilities

New IDF Inquiries 

Infor LX has a long history of providing IDF inquiries over most critical business areas, but there are still some areas that lack this capability.
The following IDF inquiries are now available in 8.4.2:

  • Customer Quote
  • Customer Quote Line
  • RMA (Return Material Authorization)
  • RMA Line

Benefits

  • Ability to sort, subset, filter, and view information in a modern and intuitive way
  • Point and click navigation to related information – 360 views
    • Exceptional personalization and extensibility capabilities
Last

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE Tip: Remap Posted Integration Transactions (tfgld4282m100)

Use this session to remap Posted transactions that were mapped incorrectly.

To remap integration transactions successfully, several conditions must be fulfilled. For details, refer to To remap integration transactions.

Enter the ranges of selection criteria for the integration transaction or range of integration transactions to be remapped. You can select the integration transactions of a range of business objects or of a specific business object.

You must select a specific integration document type or an integration document type group.

To evaluate the remapping before you perform the actual remapping, you can select the Simulate check box and the Error Report check box. After you solve the errors, you can run the session again and clear the Simulate check box.

After remapping the integration transactions, you can use the Post Integration Transactions (tfgld4282m000) session to create the postings in the General Ledger.

OPERATIONS Tip: Using Country of Origin for Purchase Orders

For purchase orders, information about the COO allows you to track the related import duties, tariffs, and compliance with sourcing requirements. You can maintain the COO of an item when creating an order or the release level of a purchase order.

When you create a purchase order line in the Purchase Order Lines (tdpur4101m000) session, the COO related details are defaulted based on the item-purchase data defined in the Items - Purchase (tdipu0101m000) session. To view this data, you can use the Country of Origin option from the References menu in the Purchase Order Lines (tdpur4101m000) session.

After the order line is released to Warehousing, an inbound line is created in the Inbound Order Lines (whinh2110m000) session with the COO information. A receipt line is created in the Warehouse Receipt Lines (whinh3512m100) session when the inbound order line is received. To view the actual COO for the item specified on the receipt line, you can use the Country of Origin option from the References menu in this session.

You can view the country of origin (COO) data for the inventory received in a warehouse in the Item - Country of Origin Inventory (tcitu6600m000) session based on the data specified in the header section such as, warehouse, item, and so on.

In the Inventory Tracking Receipt (tcitu2610m000) session, you can view the information related to the purchase order, inventory quantity, and actual COO of the item. You can use the Intrastat Transactions (tccom7171m000) session to view the COO that is reported for an order line and is used for the Intrastat declaration.

TECHNOLOGY Tip: Impact of Configuration Changes on Audit Trails:

Impact of Configuration Changes on Audit Trails

The impact of changes in the audit settings varies depending on the specific circumstances. The issues typically arise when changes made to audit settings are implemented at runtime without requiring all users to exit the system (LN). As a result, some users may continue to generate audit trails using the old configuration, while those who log in after the changes take effect will create audit trails based on the new configuration.

Changes in User Profiles

Below is a summary table that illustrates the effects of these changes for a specific table within a company:

Change Description Impact
Add a table Users that still use the old settings do not audit some transactions.
Remove a table Some transactions that must not be audited with the new settings are still audited by users that use the old settings.
Change the audit type for a table or field Some transactions are audited according to the old settings, and other transactions are audited according to the new settings.
Add or remove a field After you audit transactions in the table with the new settings, users that use the old settings can no longer perform transactions on this table. Therefore, users with the old settings can be forced to restart LN.

Note on Changes in Field-Specific Auditing:
When you toggle field-specific auditing on or off for a table, which alters the number of fields being audited, the effect is analogous to adding or removing a field. However, not every modification to the audit settings impacts the runtime settings. Converting the new settings to runtime might result in no net change for the entire configuration if the overall effect of the adjustments neutralizes each other.

Previous Article Infor LN & Baan Tips & Tricks for TECHNOLOGY: Impact of Configuration Changes on Audit Trails
Next Article Infor LN & Baan Tips & Tricks for EXECUTIVES
Print
36103 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories