Hoffmaster Clintonville Plant Goes Live with Crossroads MES & LX

Anthony Etzel 0 32484 Article rating: No rating

On March 1, 2016, Hoffmaster’s Clintonville plant went live with Crossroads MES and LX. The goal of the project was to convert from another ERP to LX and replace a green screen MES system that required the manual recording of production and labor activity keyed from shop floor terminals.

Hoffmaster achieved their goal by completing a successful data conversion and detailed prototyping of LX and Crossroads. The project team remarked that the Crossroads MES implementation was by far the easiest part of the project. One of the critical requirements of the chosen MES solution was to verify UPC and UCC label formats that called for in-line labeling of product packages and cases. Crossroads MES satisfied that requirement, and also provided an interface to finished goods inventory via the scanning of LPN numbers when reporting production.

The Clintonville plant is a leading manufacturer of disposable tabletop products.

BPCS/LX Tip of the Week: Actual Costs for Manufactured Items

Anthony Etzel 0 52742 Article rating: 5.0

In LX, the actual costs that can be set up fall into three categories: Material, Labor, and Overhead. If your LX database is set up properly with the LX cost accounting, you should be able to identify:

  • How much the item should cost
  • How to track the cost of work underway
  • How much the item actually did cost
  • Why the job cost varied from the expected cost
     

Capturing the data to track activity with associated costs can be time-consuming. With an MES solution, the information you need for costing is tracked instantly.

Baan/LN Tip of the Week:GRINYA Reconciliation – What Could Go Wrong?

Kathy Barthelt 0 77261 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan or LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

To ensure, it’s recommended that the Integrations Setup tables should be audited either through Baan/LN or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Morrison Brothers Goes Live With Crossroads MES in Record Time!

Crossroads RMC 0 31681 Article rating: No rating

On February 18, 2016, the Maquoketa plant of Morrison Brothers went live with the Crossroads MES solution. The goal was to remove all the shop floor paperwork and eliminate the manual recording of production and labor. The company achieved this goal in just 96 days from project kick-off to go live. Included in the go-live was the ability to deliver drawings electronically to the Crossroads MES workstations. This was a critical component of the implementation as it ensured that each workstation would always be operating off the latest revision of the engineering documents.

A rollout of the Crossroads MES solution is planned for Morrison’s Dubuque plants later this year. 

Morrison Brothers is a major producer of petroleum marketing equipment in the United States and abroad.

Baan/LN Tip of the Week: Old Porting Set

Kathy Barthelt 0 72910 Article rating: No rating

Here are some issues that you might run into if you stay on an old porting set too long:

  • Incompatibility because of operating system patches
  • Printing issues because of out-of-date libraries
  • Potential performance issues if binaries are not updated
  • Updating third-party products may not be possible because of dependencies
  • Limited support from Infor
  • Issues with updating database software/patches because of dependencies (if the database is also running on the same server as the application)

Need help getting on a newer porting set? Let us know! We’d be happy to help.

BPCS/LX Tip of the Week: Establish Costing For Purchased Items

Anthony Etzel 0 51131 Article rating: No rating

How Does Infor LX Establish Costing For Purchased Items?

In LX, you will establish a standard cost (you define the standard) that LX will use for the purchase items. You also need to establish in LX the Cost Type, the Cost Bucket, and the Cost Set needed for cost accounting.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 84211 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC Releases NextTrack Sales – Sales Analysis Tool for Baan, Infor LN and IBM i

Kathy Barthelt 0 32679 Article rating: No rating

Crossroads RMC is proud to announce the official release of NextTrack Sales – a sales analysis tool for Baan, LN, and IBM i. NextTrack Sales allows you to get the “big picture”, or get down into the finer details. The tool provides a sophisticated pivot grid and charting functionality, export to Excel, PDF printing, and emailing capabilities to bring your sales data to life. Analyze your Baan Sales data to examine trends, identify market opportunities, and much more. Click here for more details.

First103104105106108110111112Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Considerations for Release to Warehousing for a Cost Item

When there are two Cost Items, one with Release to Warehousing applied and the other with Release to Warehousing not applied, upon approval of the Sales Order, the Cost Item that is released to Warehousing will go straight to Staged status, pending Shipment confirmation, while the Cost Item that is not released to Warehousing will be up for Sales Deliveries.

Apart from this main difference in functionality between having and not having this option to release to Warehousing checked, there are other impacts to consider. Below is some information gathered from various KBs related to the impact of having release to Warehousing applied (or not). KBs used as reference are listed as “– REF: KB XYZ”. Editing the checkbox “Release to Warehousing” itself If there is a Sales Order (in status Free is enough) for a Cost Item, the check box is not editable. As soon as all the Sales Orders for which the Item is involved are Closed (or Canceled or Deleted) the check box becomes editable again. – REF: KB 1439313 & KB 1613780 Simultaneous/separate release to Warehousing with Physical Items In a scenario where a Cost Item (that is released to Warehousing) and a physical Item are released to Warehousing separately, then the shipment confirmation of each of these Items will occur separately. If they are released simultaneously, the shipment of the Cost Item will not be processed unless and until the physical Item is ready to be shipped. – REF: KB 1449001 Note: Ensure a Warehouse is added to Order Lines to ensure Release to Warehousing Activity is applicable. – REF: KB 2229767 Invoicing

To invoice them separately or together, factors to consider are:

  • Composing Criteria, a list of fields that need to match to have a single invoice created – REF: KB 717977
  • Invoicing Methods (tcmcs0555m000) in the General tab, select Combine, for example, Shipments, to combine different Shipments of the same Sales Order into one Invoice. This Invoicing Method is also defined in
  • Invoice-to role of a Business Partner (tccom4112s000) in the Invoicing tab. – REF: KB 812637
  • For a Return Order where a Cost Item and a Physical Item were originally invoiced together, to invoice them together again, consider using Original Document type = Invoice and link the original Invoice to the Return Order. – REF: KB 2072847 

Note: Consider solution in KB 2108605 if Composing Criteria is met, yet still Credit Notes are not combined for a Return Sales Order copied from original Sales Order for one Physical Item and one Cost Item without release to Warehousing. 

ASN ASN cannot be generated for Purchase Order Lines with Cost Item if not released to Warehousing. – REF: KB 1548301 & KB 2111341 Intercompany Trade Intercompany Trade can be applied for a Cost Item that is released to Warehousing, as Intercompany Trade needs a Warehouse and a Department. – REF: KB 2112430 Customs Value Cost Items that are released to Warehousing that are handled via normal Sales Order Lines are considered as delivered goods and will get the customs value assigned like other Items being subject to warehouse handling. Cost Items handled on Shipment Lines as "Additional Cost" are not considered as delivered goods but as pure costs. The customs value of these shipment lines gets defaulted with a zero amount and cannot be modified. The same applies to additional costs on sales order lines. – REF: KB 1600847 Freight  Cost Items cannot be used for Freight handling. – REF: KB 1830170 Additional Cost

  • For automatically generated Additional Costs in Sales Orders, Cost Items that are released to Warehousing are not released to Warehousing. This is because automatic Additional Costs are always generated with 0 quantity, therefore only the amount is filled for these Lines, which leads to the Delivery Type being set to Sales and not Warehouse. As a result, delivery must take place in Sales module. – REF: KB 1995781
  • For Additional Cost Lines added to Shipment for Cost Items, refer to KB 2236856.

Intrastat Record When using Cost Items without release to Warehousing, there is no shipping data within Invoicing. Therefore, the corresponding Intrastat record cannot be found during the printing of the Invoice. To get the Invoice data filled on the Intrastat record, Cost Items with release to warehousing should be used. Otherwise, session Update Intrastat Transactions with Invoicing Data (tccom7271m100) should be ran to update the Invoicing data in Intrastat. – REF: KB 2005482

Previous Article Infor LN & Baan Tip: What conditions must exist before changing an item's inventory unit?
Next Article Infor LN & Baan Tip: Cash Flow Functionality and Setup
Print
53311 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories