Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Baan/LN Tip of the Week: Creating Product Variants

Kathy Barthelt 0 75860 Article rating: No rating

If you specify a configurable item on the sales order line, you can configure or link a product variant.

An item is configurable if the Configurable check box is selected in the Item - General (tcibd0101s000) session.

Manufactured items with theDefault Supply Sourceset to Assembly in the Item - General (tcibd0101s000) session and Generic items, are always configurable.

Purchased items with the Purchase Schedule in Use check box selected in the Item - General (tcibd0101s000) session, can be configurable.

Crossroads RMC, in partnership with Infor, takes Yupo to LX 8.3.4

Crossroads RMC 0 28778 Article rating: 5.0

Yupo Corporation, a leader in synthetic paper, with products that are 100% recyclable, waterproof and tree-free, went live on Infor LX 8.3.4 on April 3, 2017. Yupo partnered with Crossroads RMC for this important technology upgrade. Included in the implementation were the Finance, Supply Chain, Manufacturing and Plant Maintenance (EAM) modules.

Crossroads RMC Takes Polar to LX 8.3.4

Crossroads RMC 0 32015 Article rating: No rating

Polar Beverages, the largest independent soft drink bottler in the United States, went live on Infor LX 8.3.4 on January 16, 2017. Polar partnered with Crossroads RMC for this important technology initiative. Included in the implementation were the Finance Supply Chain and Manufacturing modules. Phase 2 will include Adirondack Beverages, a subsidiary of Polar. This project will begin in Q3 2017.

BPCS/LX Tip of the Week: Handwritten Inventory Tickets

Anthony Etzel 0 48212 Article rating: No rating

Are you still using handwritten tickets for your inventory?  This method of inventory tracking is slow and prone to human error.

Putting a simple barcode system in place speeds up the process of tracking inventory movements, reduces the likelihood of mistakes, and creates a recorded history of the who/what/where that can provide valuable insight to those who make critical business decisions for your business.

Not sure where to start? Contact us and we’d be happy to help you take the first step.

Baan/LN Tip of the Week: Ledger Default Account

Kathy Barthelt 0 72388 Article rating: No rating

If you do not wish to define a detailed mapping to various ledger accounts for specific integration transactions, you can map the corresponding integration document type to a default account. All the transactions of the integration document type for which an account cannot be determined based on the mapping scheme details, are posted to the default account.

 

The mapping of an integration document type to a default account is direct, without the need for element groups and mapping elements. No distinction is made on any of the transaction details.

 

Default accounts can be used in two ways:

  • Instead of a detailed mapping to various ledger accounts. All the transactions are posted to the same account. For example, all warehouse receipts are posted to the Inventory ledger account, without any distinction.
  • In addition to a detailed mapping. If a transaction cannot be mapped based on the detailed mapping scheme, it is posted to the default account.

BPCS/LX Tip of the Week: Email Distribution Lists

Anthony Etzel 0 49126 Article rating: No rating

Email Distribution Lists are new in Infor LX Version 8.

With this feature, users can create groups to which they may add internal or external email addresses, and in turn, use the name of the group when sending out the email.

The email distribution list eliminates the need for a program change if recipients need to be added to or deleted from the group. 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Clusters in LN

Kathy Barthelt 0 72646 Article rating: No rating

A cluster is a group of one or more warehouses in a particular geographical area. You can plan an item by cluster (geographical area).

To enable this, you can set up multiple plan items for one item. You always define one plan item without a cluster indication and multiple plan items with a cluster indication. A plan item with a cluster is called a clustered plan item, and a plan item without cluster is called the non-clustered plan item.

The plan items in the clusters can be supplied not only by distribution, but also through purchase and production. In this way, you can, for example, plan local purchasing in a cluster (geographical area). You can also plan supply from multiple sources.

 

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: When More = Less

Anthony Etzel 0 48381 Article rating: No rating

Do you have bottlenecks in your process due to product changeovers or breakdowns?
Maybe the answer is adding redundancy in the department where you are experiencing the problem. A duplicate machine setup can allow for double the capacity during high production periods. It can also eliminate the need to swap out tools or other materials due to different production runs. When breakdowns occur, equipment can be swapped out to keep production moving while repairs are being made.

Planning for this keeps production levels high.

 

 

Optimize Your Manufacturing Today!

First979899100102104105106Last

Tips:  LX | BPCS | M3

Anthony Etzel
/ Categories: Infor LX & BPCS Tips

BPCS/LX Tip of the Week: Configuration Management

Make to Order? No problem if you use the Configuration Management System. This LX product allows you to define and configure a make to order product during Customer Order Entry. Basically, you have the option to create different products under the same common product item. You will get two completely different common end items that are configured from the same common parent.

The customer orders are planned and turned into shop orders for each end item with all the associated components. With an MES solution in place, the shop order side is easy to schedule and allows you to manage the shop floor.

Previous Article BPCS/LX Tip of the Week: Uses for LX Bill of Material
Next Article BPCS/LX Tip of the Week: How To Capture Re-Work Time (Part 1)
Print
84778 Rate this article:
No rating

Contact

Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Contact author

x

Tips: LN | Baan

Note: The Blocked Operations (tisfc0540m000) session displays the blocked operations.

Introduction

Sometimes a problem occurs that must be solved before an operation proceeds. Examples of such situations are:

  • The quality of an intermediate product must first be inspected.
  • A machine is in repair.
  • A supplier cannot deliver an essential component in time.
  • A customer is late with its payments.

In these situations the operation can get the operation status Blocked.

An operation can be blocked:

  • Manually.
  • Automatically by Quality.

Blocking reasons

Every blocked operation must have a blocking reason. The blocking reason of a blocked operation has two purposes:

  • To indicate why the operation is blocked.
  • To determine which actions you can no longer perform on the operation.

Types of blocking

The following actions can be blocked by means of a blocking reason:

  • Reporting a quantity completed.
  • Reporting a quantity rejected.
  • Reporting a quantity to be inspected.
  • Reporting an operation completed.

You normally carry out these actions in the Report Operations Completed (tisfc0130m000) session.

You can define blocking reasons in the Blocking Reasons (tisfc2100m000) session.

Manual blocking

Use the Report Operations Completed (tisfc0130m000) session to block an operation. When you block an operation, you must also enter a blocking reason. If Quality has already blocked the operation, you can only enter a blocking reason, which is more restrictive than the blocking reason of Quality.

Blocking by Quality Managem

Categories