Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Infor

Infor News You Can Use: Discover the Power of Advanced Planning & Scheduling with industry expert Greg Keating

CloudSuite® Industrial APS - Effective Planning & Scheduling

Learn what it is, how it works, and how it can transform your manufacturing operations.

Logo

Presented by

Greg Keating, Senior Solution Consultant, Infor

About this talk

Bring the future into closer focus If you are like most manufacturers today, managing your planning and scheduling resources has become a major challenge. The disrupted supply chain, workforce availability, equipment capacity, sporadic market demand, and changing customer expectations all contribute to the complexities of planning. Having the right resources available is essential for keeping production flowing and ensuring customers receive orders on time. In this session we will focus on Advanced Planning and Scheduling (APS) capabilities within CloudSuite Industrial. Our Infor expert will share: - What APS is, how it varies from traditional Manufacturing Resource Planning and the difference between Planning and Scheduling within CSI. - The basic configuration requirements needed to effectively utilize APS and available-to-promise/capable-to-promise (ATP/CTP) functionality. We'll also look at the key differences between these solutions - Examples of advanced applications that help identify accurate and reliable commitment dates.

Watch now On-Demand >

Infor On-Demand: 67min talk

Previous Article Bring New Life to Your Infor LN & Baan ERP System
Next Article Infor LN & Baan Tips & Tricks for EXECUTIVES:
Print
9856 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

Categories