Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Baan/LN Tip of the Week: Transaction Accounts – Commissions

Kathy Barthelt 0 77857 Article rating: No rating

In Baan IV, if a link with Financials exists for commissions and rebates, invoices are created directly in the Commission Control System (CMS) module and posted to Financials. As a result, users must specify the ledger accounts that are used for posting commissions and rebates in the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session.

In LN, the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session is removed from the Commission Control System (CMS) module, because invoices are no longer created directly in the Commission Control System module.

BPCS/LX Tip of the Week: Vendor Maintenance Security Option for Company or Program

Anthony Etzel 0 40240 Article rating: No rating

The Vendor Maintenance Security option is in the Purchasing System Parameters program(PUR820D). The purpose of this program is to provide an additional security option for VendorMaster Maintenance. To access this program, the user selects the Parameters Generation option from the System Functions menu, SYS500. The user can modify the Vendor Maintenance Security parameter from PUR820D-04 in the Purchasing System Parameters program.This feature provides an additional security parameter for Vendor Master Maintenance.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: 6 Powerful Steps to Win With Automation

Anthony Etzel 0 36529 Article rating: No rating

1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.  

2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.

3. Easy electronic scheduling by sequence and changing job priorities.

4. Evaluate differences using actual times compared to standards.

5. Improve data accuracy and eliminate the need to chase and fix errors.

6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: GRINYA Reconciliation – What Could Go Wrong?

Kathy Barthelt 0 79439 Article rating: No rating

One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan or LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error.

To ensure, it’s recommended that the Integrations Setup tables should be audited either through Baan/LN or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Purchase Order Receive All Processing

Anthony Etzel 0 30275 Article rating: No rating

With this enhancement, the Purchase Receipts screens are optionally shown with the quantity and weight fields populated with the open value on the purchase order.

Previously the user had tomanually enter the quantity received or, for a dynamic weight and measure items, the weightreceived for each line on the purchase order.

Now the screens are populated with the open valueand if the open value is the same as the value received, the user can simply accept the line.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: 4 Reasons You Need Timely & Accurate Data

Kathy Barthelt 0 85870 Article rating: No rating

Seems obvious – you want real time data and you want it to be accurate. Do you have the systems in place to allow for this?

Here are 4 reasons you need a data collection system:

  1. See the differences between actuals and standards
  2. Determine the source of project overruns
  3. Prevent mis-shipments to customers
  4. Avoid unnecessary reordering of parts

An automated data collection system will analyze your current data, allowing you to efficiently optimize your manufacturing and the benefits will be huge and far reaching.

Optimize Your Manufacturing Today!

Blonder Tongue Looks for Success on LX With Crossroads MES

Anthony Etzel 0 31194 Article rating: No rating

Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.

Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.  

Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.  
Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements company wide in phase 2. Crossroads MES will go live over 6.0.04 in Q4 2017 with a planned cutover to LX as part of the ERP go live in Q1 2018.  
Blonder Tongue, a global communications equipment supplier for TV broadcasters and cable system operators, has selected Crossroads RMC to upgrade their ERP from BPCS 6.0.04 to the latest version of Infor LX. As part of this project, they will implement FIN, MFG, SCM and Webtop on LX, and will incorporate process improvements com

BPCS/LX Tip of the Week: Estimates Versus Actuals

Anthony Etzel 0 33680 Article rating: No rating

So, how many of you have updated the estimated cost of material and labor in your ERP system recently? ……Hmmmm. That’s what I thought.

Do you have any idea how accurate those numbers are? Are you making business decisions based on estimates that are completely inaccurate?

Consider switching from estimates to actuals. Furthermore, consider implementing an automated data collection system to make this easy. By collecting production and labor data real time, you can gain real insight into your business and you gain the ability to look at the profitability of individual jobs, projects and employees.

Optimize Your Manufacturing Today!

First8990919294969798Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Use this session to define simulated purchase prices for purchased items per site.

Field Information:

  • Cost Calculation Code - price calculation code
  • Item

The raw materials, subassemblies, finished products, and tools that can be purchased, stored, manufactured, and sold.

An item can also represent a set of items handled as one kit, or which exist in multiple product variants.

You can also define nonphysical items, which are not retained in inventory but can be used to post costs or to invoice services to customers. The examples of nonphysical items:

  • Cost items (for example, electricity)
  • Service items
  • Subcontracting services
  • List items (menus/options)
     
  • ​Site - The site for which the purchase price is simulated.
  • Purchase Currency - The currency of the simulated purchase price.
  • Simulated Price - Purchase price

The simulated purchase price and currency are recorded twice.

  • Simulated Price Multi Currency - The purchase price in multiple currencies.

The simulated purchase price and currency are recorded twice. The amount in this field is related to the price of the supplier.

  • Unit - Purchase price unit
  • Cost Component - The cost component that must be of the type Material Costs.

Note: The cost component specified in this field does not become part of the standard cost detail structure if it is part of the cost component scheme of the selected item. If calculations are performed with a calculation code not used for actualization (simulations only), the simulated purchase price is mapped to the cost component defined in the records for this session.

Categories