Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip: Backup and Save options

Anthony Etzel 0 55912 Article rating: No rating

Users are no longer limited to backing up or saving files to a tape or diskette.They can now use a Save File (SAVF) to save data and objects. LX programs that perform saves and/or backups were modernized to add a new SAVF option.  

There were numerous places in LX where users are prompted to save a file or library. These screens have options for tape or diskette. Diskette refers to the old 8” diskettes used on System/38. These devices are outdated and virtually obsolete. The current means of saving objects on the IBM i, is through the use of a Save File (SAVF). This compresses the data into a single object that can be saved and is easily transferred between systems.

These objects were modified and/or created for this enhancement:

  • Backup Simulation (FOR630C, FOR630D, FOR630FM, FOR640HT, and FOR630HT)
  • Month End Close (INV903D, INV903FM, INV901C, and INV903HT)
  • Purge YTH/Restore Archived Lots (INV912C, INV912D, INV912DHT, and INV912FM)
  • Purge and Save ITH records (INV932C, INV932D, INV932FM, and INV932HT)
  • Labor Ticket Save (SFC905D, SFC905FM, SFC901C, and SFC905HT)
  • Backup Infor LX Files (SYS700C, SYS700D, SYS700FM, and SYS700HT)
  • Backup Infor LX Programs (SYS710C, SYS710D, SYS710FM, and SYS710HT)
  • Backup Infor LX Source (SYS740C, SYS740D, SYS740FM, and SYS740HT)
  • Save File Name Selection (SYS912D, SYS912FM, and SYS912HT)


Benefit

Use the Backup Simulation to copy a simulation file to a SAVF or tape. Users may want to do this to transfer simulation data from one system to another, from site to site, or to save the data before permanently deleting it from the system.

Navistar goes global with Crossroads RMC!

Kathy Barthelt 0 26753 Article rating: 4.7

Navistar, a leading manufacturer of commercial trucks, buses, defense vehicles, and engines, has selected Crossroads RMC’s data collection middleware to use for their global data collection solution. Implementation began in late 2018 with Navistar’s Illinois facility and will be completed in all other divisions by the end of 2019.

Don’t Let Malware Destroy Your ERP System!

Crossroads RMC 0 23682 Article rating: 5.0

We just got a report that another one of our customers has been affected by malware. In this case it wiped out their ERP server. We are working with them to restore it an get everything up and running again. It is highly likely that this got into their network by an email attachment. This seemed like a good opportunity to remind everyone to be extremely careful with email attachments. Even if it appears to be from someone that you know, email “From” addresses can be forged.

Best practice is to save the attachment to a folder, and run a virus scan before opening or viewing the file.

Baan/LN Tip: Credit Control Parameters (ACR Parameters)

Kathy Barthelt 0 80514 Article rating: 5.0

In the Credit Control Parameters, you can indicate if the same letter will be sent for reminding and action taken if amounts are zero or negative. The reminder letters work in conjunction with overdue sales invoices and the “Reminder Diary Margin.” When an invoice has passed its due date plus a certain margin of days, LN generates a reminder advice for the invoice. 

Crossroads Welcomes Ridewell Corporation – MES for Infor LX

Anthony Etzel 0 27256 Article rating: 5.0

Crossroads RMC welcomes Ridewell Corporation as our newest client having selected Crossroads MES (Manufacturing Execution System) for their shop floor automation with integration to Infor LX. 

Ridewell engineers and manufactures air-ride, rubber-ride, steel spring and mechanical suspension systems for the truck, trailer, RV and bus industries. The company has served the transportation industry since 1967 and holds many active patents for exclusive features that provide for low maintenance and superior ride quality.

Ridewell’s objective was to eliminate shop floor paperwork and manual processes, obtain real time performance metrics, and achieve greater visibility over manufacturing operations. After carefully conducting their due diligence they selected Crossroads MES to address these challenges.

Crossroads Manufacturing Execution System connects your manufacturing plant to the rest of your enterprise by using touch screen PCs on the shop floor. Powered by IBM I Power Systems, Crossroads MES fills the gap that exists between your ERP system and your lean manufacturing initiatives by modernizing and transforming the ERP experience. It delivers paperless shop packets to your entire workforce, captures live manufacturing data, and then delivers real-time status to your Tablet or PC.

Key Features include:

  • Paperless Shop Floor                               
  • Labor and Machine Time
  • Production Reporting
  • Material Issue
  • Scrap Reporting
  • Scheduling
  • Capacity Load Balancing
  • Label Integration
  • Dashboard Analytics                    

Crossroads MES provides information that helps manufacturing decision makers understand how current conditions on the plant floor can be optimized to improve production output.

Crossroads RMC is proud to have Ridewell Corporation as a client and we look forward to working together to support their company growth and success.

BPCS/LX Tip of the Week: Shelf Life Days and Retest Days

Anthony Etzel 0 55980 Article rating: 5.0

This feature provides the ability to enter information in the shelf life days and retest days fields for non-QMS lot controlled items, even when the QMS product is installed. The purpose of this enhancement is to allow the user to enter information for non-QMS lot controlled items even when QMS is activated in Parameters Generation, SYS800D. In previous versions, when QMS was activated, the Shelf Life Days and Retest Days fields in Facility Planning Maintenance (MRP140) and Item Master Maintenance (INV100) were not maintainable for non-QMS lot controlled items. The user is now able to change non-QMS lot controlled items even when a QMS product is installed.

Baan & LN Integration News: Playing Telephone Can Get You In Trouble

Kathy Barthelt 0 34388 Article rating: 5.0

Somehow information must be relayed from one person to another, and the “connection” (as it turns out) is pretty manual, and error prone.

How about moving into the 21st century and eliminate the manual effort. How about automating your integrations? Learn About Crossroads RMC Consulting

We have tied Baan and Infor LN to:

  • Warranty systems
  • CRM systems
  • Web portals
  • Automated batch picking systems, and so much more!

Contact me to find out how we can automate the communication between your systems, so you don’t have to worry about what got lost in translation.

Baan/LN Tip: New Mapping Scheme

Kathy Barthelt 0 81792 Article rating: 5.0
After a new mapping scheme is copied from an existing one, it is possible to check transactions in a simulation mode, before activating the new scheme. However, before the simulation can take place, the new mapping scheme needs to have completed the “Check Mapping Scheme” step. When the check is completed, a transaction can be simulated by highlighting it and from the Specific menu, selecting “Map with Specific Mapping Scheme.” Any errors can be corrected without having to activate the new mapping scheme.
First7374757678808182Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Companies can decide to involve a subcontractor and subcontract part of their activities. The subcontractor carries out the work and returns the products to your company.

In Infor LN, subcontracting is considered as purchasing labor from a third party. Therefore, if a manufacturer wants to subcontract work, he must generate a purchase order to start the subcontracting process. These are the types of subcontracting:

  • Subcontracting with material flow
    • Operation subcontracting: For operation subcontracting, a part of the production process (one or more operations) is subcontracted.
    • Item subcontracting: For item subcontracting, an item's entire production process is subcontracted. Therefore, it is always used with material flow support.
  • Subcontracting without material flow: The simplest form of subcontracting is to generate a subcontracting purchase order to record the operations outsourced to a subcontractor. The subcontracting purchase order only represents the administrative handling of the subcontracting process. When the subcontracted item is received back from the subcontractor, you must close the subcontracting purchase order, which initiates the production process.
  • Unplanned subcontracting: Unplanned subcontracting is applicable when you subcontract after generating a production order. For unplanned subcontracting, a purchase order is generated from the production order and the material supply lines are populated by Shop Floor Control.
  • Service subcontracting: For service subcontracting, work on an item to be maintained or repaired is subcontracted. This work entails the entire repair process, or only a part of it. Service subcontracting can be used with or without material flow support.

To start the subcontracting process, a purchase order is required.

Categories