Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Managing IDF for LX Version 06.03.05.84

21-Jun-2019

George Moroses 0 35740 Article rating: 5.0

Read these instructions prior to beginning your installation or upgrade of IDF for LX 8.4. This document also provides current information related to using, installing, and configuring IDF for LX Version 06.03.05. New information will be added to this document as it becomes available. IDF for LX 06.03.05.84 is compatible with LX 8.4 environments.

Updates
21-Jun-2019 – Fix Patch 06.03.05.84.02.01 and SH16143692
Also see Link Manager Fix Level for 06.03.05.84.02.01 for the list of IDF Client fixes.
BMR 80211 Cumulative Patch 84.02.01 includes changes to support Infor’s Java strategy, see the Infor LX IDF Client Runtime Update for Corretto for special instructions on installing this IDF patch.
For information on LX moving from Oracle to Corretto Java see KB 2069811.

22-May-2019 – Fix Patch 06.03.05.84.01.02 and SH16143692
Also see Link Manager Fix Level for 06.03.05.84.01.02 for the list of IDF Client fixes.
MR 79799 Item gets deleted after pick confirm but does not delete after invoice.
MR 79876 Enhancement - Enterprise Item Relationship to PO Lines.
MR 80001 Attributes associated with a business object are not available to be added to a View if the business object is defined as not being allowed on menu.
MR 80004 IDF issues found while testing enhancement to IDF Change.
MR 80037 Extended Amount incorrect for DWM items in IDF Purchase Order Inquiry.
MR 80105 Integrator Translations need to be added to the “Default” card file.
MR 80039 In IDF Power-link listed under Maintain dropdown are IDF Inquiry business objects that are not maintainable in IDF.
MR 80079 Shop Order has wrong labels/descriptions.
MR 80083 Should not allow users to change an item record to DWM if there is active inventory.
MR 80099 Error: "The field TBBT1F is not maintainable" is received when attempting to change Main toolbar buttons for Net-Link from Standard actions only to IDF.
MR 80116 Host print allows selection of Suspended (Inactive) language and does not return an error message.
MR 80117 Orders details in IDF Customers object under Orders tab doesn't show all 9 digits of the Order Number.
MR 80125 Not able to Create Customer when Multi currency flag is OFF.
MR 80194 The Vendor Tax Code and Customer Tax Code do not fully display in Vendor’s Tax tab and Customer's Tax tab in Ming.le Change mode only.
MR 80208 IDF secondary objects are not setWebCapable(True); therefore customizations do not appear in NetLink.

Information and Instructions
New Installs of IDF
If you don’t have IDF installed please refer to the LX IDF 06.03.05 Installation and Upgrade Guide available on the Infor Support Portal for important instructions.

Upgrading existing IDF installations
If you already have IDF installed for LX 8.3.x environments it needs to be upgraded to 06.03.05 prior to adding LX 8.4 IDF environments. Please refer to the...

Analytics Dashboard: Reports are great, but only provide a snapshots of a specific moment

Don’t you need to know what’s happening right NOW?

Crossroads RMC 0 36459 Article rating: 5.0

Get up-to-date views of your data, graphs, charts, you name it!

All the way YOU want it!  All without touching your ERP!

Learn how Analytics Dashboard for Infor LN & Baan works in your unique environment.
Learn how Analytics Dashboard for Infor LX, BPCS, & M3 works in your unique environment.

The Top 5 Benefits of a Manufacturing Execution System (MES)

by PlanetTogether

Anthony Etzel 0 37945 Article rating: 5.0

MES provides the right information at the right time to show the floor manager how to optimize current conditions to improve production output.

Need 5 more reasons why you should invest in an MES system?
Read the full article by PlanetTogether:

https://www.planettogether.com/blog/the-top-5-advantages-of-a-manufacturing-execution-system

Clearly, an MES does more than simply track the amount of product coming off of your production lines. Improving your facility's efficiency begins with accurately recording production, material usage, and personnel time. Crossroads MES accomplishes this feat with ease and precision.

Infor LX & BPCS Tip of the Week: Trim Leading Zero

George Moroses 0 61833 Article rating: 5.0

In LX 8.4, an enhancement has been included to allow for the expanded Company fields to have the leading zero truncated.

To trim leading zeros, CEA515B is called during macro resolution to trim the leading zero based on the position in the Zero Trim file (GZT). The Zero Trim file contains all the company number fields currently defined in the CEA Cross Reference fie (GXM).

This enhancement provides year over year comparison in financial reports and eliminates the need to setup new companies in programs such as Alias Definition. Financial programs trim the leading zero on Company fields, such as Company 010, on subsystem transactions to process as Company 10 during CEA macro resolution. Clients who prefer to retain the Company value as 010 on financial reports can clear the GZT file.

First6061626365676869Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Introducing VJES (Visual Job Execution Software)

You would be hard-pressed to completely miss the stories in the news recently about quality issues in manufacturing. The crux of the issue has been a complete focus on production and a lack of focus on quality. Yes, it is a wonderful thing to get the goods out the door, but when you’re sacrificing quality, what good is it really?

There are specifications for production for a reason. Engineering exists for a reason. If products are not built according to exact design specifications, scrap is likely to go up, rework goes up, customer returns and/or service requests go up, and customer satisfaction and overall customer confidence in your product plummets.

Is all of that worth it to get the good out the door in the shortest amount of time possible?

Every manufacturer relies on a few core measurements to manage their operations. Measurements like efficiency, productivity, capacity, labor and equipment utilization are used by manufacturers across the globe to benchmark performance and assess the effectiveness of processes.

Quality needs to be part of that mix. Because measurements like efficiency and productivity don’t necessarily mean high quality, incorporating ways to ensure quality from the start can help to eliminate waste and rework.

Manufacturing quality is achieved through quality control using documented, repeatable, and measurable processes.

What if you could incorporate quality control in every operation, at every work center to not only ensure high-quality finished goods but also simultaneously train high-quality operators?

Introducing Crossroads’ ERP independent solution, VJES (Visual Job Execution Software). VJES is an electronic work instruction interface between engineering and the paperless manufacturing floor. VJES makes available only one version of the work instructions – the RIGHT one. By deploying up-to-date, visually rich work instructions, images, and videos, VJES gives production personnel the best opportunity to build it right the first time and provides a way to track worker productivity during the build at every step.

VJES Overview

VJES achieves RESULTS:

  • Turn new hire welders into specialized welders in 2 weeks
  • Improvement of quality score from 68/100 to 93/100 in 12 months
  • During the first month of use, employee training timeframe improved from 1 week, to 3 days.
  • First pass yield percentage at 100% for 8 months straight this year.
  • Able to incorporate a quality cell after productivity increased due to newfound bandwidth received when adopting VJES.


Request a demo or Contact us to learn more.

Print
19800 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories