Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

What if you could make your ERP system work harder for you? How would you improve it?

Crossroads RMC 0 1268 Article rating: 5.0

The answer to this question is often integration to other systems. Why not take advantage of Crossroads RMC's best of breed solutions to take your ERP installation to the next level and really TRANSFORM your business?

Read this great article by NextProcess:
Here’s How You Can Enhance Your ERP with Software Integration

Crossroads RMC has integration experts ready to tackle any integration project!

Contact us today! 800.762.2077

Your Enterprise Resource Planning software lies at the heart of your business

Infor LN & Baan

Kathy Barthelt 0 16669 Article rating: 5.0

How Infor LN & Baan is utilized is critical to operating a stable, well understood, and effective business system. Knowing the current state of your system will enable you to make decisions to either better utilize your current ERP version or upgrade.

Crossroads RMC’s ERP Assessment helps you to flush out issues and areas for improvement. Our findings have resulted in minor procedural changes to a full reimplementation, or system upgrade to Infor LN. If your business requirements and your resources have undergone major change since your original implementation, it is time to take a look at your Infor ERP system to see if it is being utilized properly. The Crossroads RMC Utilization Review is designed to work with your people to identify the best way to apply the powerful capabilities within the Manufacturing, Supply Chain and Financial modules within the LN/Baan software to best suit the needs of your business, not only today, but in years to come.

Learn more>

Infor LN & Baan Tip of the Week: What is the LN Report Designer and what is required to use it?

Kathy Barthelt 0 1430 Article rating: 5.0

The main purpose of the Report Designer is to enable changes to the design of a 4GL application report, without modifying the standard report or using an external reporting solution. The changes are stored as personalizations. Therefore, the effort that is required to implement changes, after the standard is updated, is reduced.

You can also generate new reports that are based on a selection of fields from the application data model. These reports are generated in the extensibility package. You can personalize these reports in the Report Designer, or modify them in LN Studio.

  • The Report Designer is available with LN 10.5 and later.
  • Enterprise Server 10.6 is required.
  • The Report Designer is only supported in LN UI.

Note:  On LN 10.5 you must re-compile the reports once with Enterprise Server 10.6 to enable them for the Report Designer.

OTTO - On-Time Ordering: Q&A with an MIS Manager from a metal fabrication manufacturer

George Moroses 0 429 Article rating: 5.0

OTTO  A Q&A with an MIS Manager from a metal fabrication manufacturer:

1. How difficult was it to initially install OTTO?

"We loaded OTTO on our AS/400 on a Friday morning and demonstrated OTTO's capabilities with our own data that afternoon. That really impressed me from an IS perspective because it was so easy to load and run."

2. Would you install it on a test system or on the production system?

"We installed on the production system in order to use live data. OTTO resides outside of the ERP system and builds its own databases so it is not detrimental to any other system."

3. How difficult was it to implement OTTO, was there a negative impact on daily operations?

"Some reports were being used on the first day of the evaluation. There was only positive impact on our operation. For example, shortages in our final assembly area were eliminated within 30 days of the demonstration."

4. Comments?

"I was greatly surprised OTTO fit so well with our operation. OTTO has worked well in our company (we substantially increased on time shipments at the same time our business was seeing a 3 fold increase), but each company has to judge for themselves how well OTTO fits in with their organization."

Contact us to learn how OTTO can help your company!

Analytics Dashboard News: What is a CFOs Biggest Concern?

Crossroads RMC 0 388 Article rating: 5.0

If you ask CFOs about their biggest concerns, most of them will tell you that increasing cash flow is a high priority.

In order to succeed at this, you have to keep an eye on your accounts receivable. Many companies, however, do not have the means or data to find out where they currently stand.

What if you could have that information at your fingertips?

Learn more about Analytics Dashboard for Infor LN/Baan >

Learn more about Analytics Dashboard for Infor LX/BPCS/M3 >

Your Enterprise Resource Planning software lies at the heart of your business

Infor LX & BPCS

George Moroses 0 13223 Article rating: 5.0

How Infor LX & BPCS is utilized is critical to operating a stable, well understood and effective business system. Knowing the current state of your system will enable you to make decisions to either better utilize your current ERP version or upgrade.

Crossroads RMC’s Utilization Review helps you flush out issues and areas for improvement. Our findings have resulted in minor procedural changes to a full reimplementation, or system upgrade to Infor LX.

If your business requirements and your resources have undergone major change since your original implementation, it is time to take a look at your ERP system to see if it is being utilized properly. The Crossroads RMC Utilization Review is designed to work with your people to identify the best way to apply the powerful capabilities within the Manufacturing, Supply Chain and Financial modules within the LX/BPCS software to best suit the needs of your business, not only today, but in years to come.

Learn more>

First5152535456585960Last

Tips:  LX | BPCS | M3

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: Difference Between a Serialized Item and Unit Effective Item

A serialized item is not the same as a unit effective item. A serialized item has a serial number that is used to identify and track individual items, whereas a unit effectivity item has an effectivity unit that provides some information about the item's configuration. However, an item can be both serialized and unit effective.

Optimize Your Manufacturing Today!
 
Print
134159 Rate this article:
No rating

Contact

Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Tips: LN | Baan

Companies can decide to involve a subcontractor and subcontract part of their activities. The subcontractor carries out the work and returns the products to your company.

In Infor LN, subcontracting is considered as purchasing labor from a third party. Therefore, if a manufacturer wants to subcontract work, he must generate a purchase order to start the subcontracting process. These are the types of subcontracting:

  • Subcontracting with material flow
    • Operation subcontracting: For operation subcontracting, a part of the production process (one or more operations) is subcontracted.
    • Item subcontracting: For item subcontracting, an item's entire production process is subcontracted. Therefore, it is always used with material flow support.
  • Subcontracting without material flow: The simplest form of subcontracting is to generate a subcontracting purchase order to record the operations outsourced to a subcontractor. The subcontracting purchase order only represents the administrative handling of the subcontracting process. When the subcontracted item is received back from the subcontractor, you must close the subcontracting purchase order, which initiates the production process.
  • Unplanned subcontracting: Unplanned subcontracting is applicable when you subcontract after generating a production order. For unplanned subcontracting, a purchase order is generated from the production order and the material supply lines are populated by Shop Floor Control.
  • Service subcontracting: For service subcontracting, work on an item to be maintained or repaired is subcontracted. This work entails the entire repair process, or only a part of it. Service subcontracting can be used with or without material flow support.

To start the subcontracting process, a purchase order is required.

Categories