Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

Kathy Barthelt 0 100826 Article rating: 5.0

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)

George Moroses 0 49781 Article rating: 5.0

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT

Welcome to Our New Website - Please Take a Look Around!

Crossroads RMC 0 43024 Article rating: 5.0

We proudly announce the launch of Crossroads RMC’s brand new website!

We have been fortunate to serve customers for over 30 years and over that time, we have developed software solutions and consulting expertise to become your Go-To Experts for Infor LN / Baan, and Infor LX / BPCS and M3. 

Our website design focuses on our products and services simply and succinctly, while accentuating the reasons why working with Crossroads RMC has been the right choice for so many manufacturers and distributors worldwide. 

So come on in and take a look around! We hope you enjoy the new site and explore all of the information it has to offer.

If you think our new website is COOL, please leave a comment!If you think our new website is COOL, please leave a comment! 

Keep up-to-date with our latest announcements, industry news, and Infor ERP tips here on Crossroads Connections, Subscribe to our bi-monthly Newsletter and follow us on Facebook, LinkedInTwitter and YouTube.

Infor will no longer support LX or BPCS on IBM i 7.2 after April 30, 2021

George Moroses 0 50086 Article rating: 5.0

On September 10, 2019, IBM® announced the end of support of IBM i 7.2 effective April 30, 2021. In line with IBM’s support policy, Infor will no longer support LX, BPCS, SSAEAM, PRMS, BOSS and related products on IBM i 7.2 after April 30, 2021.

All releases, patches, and solutions are expected to be delivered and compiled for IBM i 7.3 effective May 1, 2021. These deliverables should install and function on version 7 release 3 (IBM i 7.3) and above. This will require that your operating system be at a minimum release level of IBM i 7.3.

This policy extends to other Infor LX related technologies including WebTop, System i Workspace (SIW), and Infor Development Framework (IDF).

If you have not done so already, we recommend you start planning and completing your upgrade to IBM i 7.3 or above prior to April 30, 2021. After this date, if you register a support call with Infor Support, and your application still runs on IBM i 7.2, you may be requested to upgrade to a supported version of the IBM i operating system.

In addition, we invite you to log on to Infor Concierge to view and download important information regarding Infor LX, BPCS, and Infor SSAEAM. General KB Articles have been created to proactively provide you with information regarding this Announcement (1397381) and the Infor BPCS/LX Product Lifecycle Policy (1947086).

Infor LX & BPCS Tip of the Week: Journal Upload – EGLi

George Moroses 0 52430 Article rating: 5.0

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

Infor LN & Baan Tip: Open Transactions Check – LN 10.7

Kathy Barthelt 0 56962 Article rating: 5.0

When closing a project, users were informed about open transactions blocking the closure process. To proactively check on open transactions, the Show Open Transactions option has been introduced in the Project Status (tppdm6107s000) session. With this option, issues can be resolved before changing the status.

First5051525355575859Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Collaborate IN-PERSON With Infor LN Users

LN North America User Group - Face-to-Face 2022 (lnnaug.org)

Registration is open for the face-to-face LN North America User Group Annual Meeting!

Things are finally turning around and opening up! We're looking forward to the day when the pandemic stays firmly in the rearview mirror.

It's definitely exciting to be buttoning up the details of the agenda for this event. This is our chance to discuss successes and roadblocks with one another.

This is also an opportunity to spend time with the Infor team. We will have members of the Product Management and Product Development team in-house for presentations, discussion, and questions.

Catch this: Marco Hoogenraad & Bram Vijfhuizen are scheduled to join us on-site!

Seats are limited. Registration closes on April 8th or sooner if we hit that limit.

Don't miss out, register today! We are looking forward to seeing everyone again and hope to see YOU there!

Curious about the agenda? Find it here: https://www.lnnaug.org/events-underway/agenda

Catch the details:

When: 2 full days | April 19 & 20, 2022

Sponsored dinners: April 18 & 19

Registration fee: To attend this event, there is NO COST to customers other than arranging and covering their own travel & lodging at a hotel in Columbus, Ohio.

Registration: Registration is open!

Agenda: The agenda will be a mix of learning sessions, customer stories, discussion groups, and networking time. If you have any questions shoot us an email at lnbaan.naug@gmail.com.

Travel Information

Where: Columbus, Ohio | Brookshire: The Venue at 405 Greif Pkwy, Delaware, OH 43015

Airport Code: CMH - a 20-minute drive from this airport to local hotels. 10 minutes from the hotel to the event location.

Hotels
Cambria Hotel Columbus - Polaris | 9100 Lyra Drive, Columbus, OH, 43240, US | Phone (614) 841-9100 Fax (614) 841-9107
Hilton Garden Inn | 8535 Lyra Dr, Columbus, OH 43240 | Phone: (614) 846-8884
Other hotels that are in Polaris, Columbus, OH would work fine as well.

Print
25329 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories