Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LN & Baan Tip of the Week: Wrap Toolbar Option

Kathy Barthelt 0 76353 Article rating: 5.0

The Wrap Toolbar option has been added. You can use this option to wrap toolbar buttons to the next line if it becomes too narrow to add on the same line. If this option is selected, every session has the option available in the Personalization menu. This gives the user the possibility to change the wrapping state of the toolbar per session. This setting is saved as a personalization. You can configure this option in the Tools Parameters (ttaad0100m000) session and for specific users in the User Data Template (ttams1110m000) session.

Note: LN UI 12.2.6 or later is required.

An Infor LX upgrade in a month? Crossroads consultants make it happen!

George Moroses 0 36437 Article rating: 5.0

In August, BISCO, Inc. based in IL went live on their new IBMi 9 with Infor LX. This project included a dual migration from IBMi 7 to IBMi 9 and an upgrade from LX 8.3.4 to LX 8.3.5 using webtop. The Crossroads team led by Tim Baker, made this all happen in just a little over a month. BISCO will immediately move into the next phase of the project which will focus on an implementation of the Avalara Tax Interface to LX.

As stated by BISCO’s Senior Manager of Information Technology, “I want to express our complete gratitude for what a great job Crossroads RMC did in helping us get our BPCS LX Upgrade up and running. We were struggling to get over that hump and just couldn’t seem to bring this ERP to life… Crossroads RMC came in and saved the day, a fantastic job and the effort put forth was 2nd to none. Big Shout out to Tim Baker!!  I would highly recommend Crossroads RMC to any company.

BISCO is an ISO 13485 certified manufacturer of medical devices for the dental industry, specializing in adhesive and resin composite technology. Established in 1981, BISCO is an industry leader providing technically innovative aesthetic and restorative products to dental customers in the U.S. and in over 60 countries worldwide.

Learn more about Crossroads RMC Services>

Infor M3 & Movex Tip of the Week: What are M3 Web Services?

Frank Petrasio 0 36972 Article rating: 5.0

M3 Web Services Server is the runtime engine for M3 Web Services, which are wrappers for the business functionality provided by supported backend applications such as M3 Business Engine.

The M3 Web Services Grid Management pages provide some basic administrative capabilities. For example, you can view deployed web services, check the server setup for errors, do some basic configuration management, and manage web service security.

To create your own web services, you must also install the M3 Web Services Designer component, which allows you to design, model, deploy, and test web services.

Is your company on an older version of Infor LX, BPCS, Infor LN, Baan, Infor M3 or Movex?

Crossroads RMC 0 48754 Article rating: 5.0

What will you do when your ERP is no longer supported in 2021?

This is a confusing time for many companies with respect to their ERP system.

"Will I still be able to run my current version?"
"What happens if I want to stay on my version?"
"What options do I have?"

Crossroads RMC is here to help you sort through the confusion and get you to a place where you feel confident about your ERP future.

Let's get started with how we can help. I want Crossroads RMC to…

  • Conduct an Infor ERP Utilization Review – Should I consider moving to the latest version of LX in the cloud, or on prem? If I don’t, what are my options?
     
  • Set up an Infor ERP Demo System – I want to give my employees a chance to try out the latest version to see if it would be of benefit.
     
  • Train My Employees – I want to ensure that we’re operating based on best practices.
     
  • Integrate My ERP to External Systems – My company uses separate systems that don’t talk to one another and that is really inefficient.
     
  • Brainstorm With Me – I’m not sure what to do. I need to talk through some scenarios with someone who has been there, done that.
     
  • Support My Users – I’m short-staffed. I may upgrade, or I may stay where I’m at. Either way, I could use someone to handle our ERP issues. Please help!

Contact us at 800.762.2077 or click here to request a free phone consultation and we'll get you back on track.

Get the Latest Porting Set for Infor LN, Baan V and Baan IV

Kathy Barthelt 0 80315 Article rating: 4.5

Porting set 9.3g has been released and is suitable for use by:
• Infor LN customers
• Infor Baan ERP 5.2a customers who have migrated the Infor Baan ERP 5.2a Tools to Infor Enterprise Server 8
• Infor Baan ERP 5.0b and 5.0c customers who have adopted SLM as described in document U8985F US: User's Guide to upgrade to porting set 8.2b or later
• Infor BaanIV c when the conditions for upgrading from the 6.1c.xx porting set line are met.

Infor M3 & Movex Tip: What is a Start Page?

Frank Petrasio 0 39107 Article rating: 5.0

The Start page is the initial page that you will see when you open M3 H5.
Start pages provide a way to organize and keep track of tasks and programs. It contains widgets, which can give you quick access to the different features available in H5. The type of widgets to be added, their arrangement, and their size can also be customized.

The Start page can be accessed by clicking the home tab located below the Favorites menu. Start pages are available in both Enterprise and Foundation editions. However, H5 Foundation users will only see a static start page that cannot be configured or changed.

A Start page administrator can configure a default start page or a set of start pages for specific users or groups.

Infor LX & BPCS Tip of the Week: Production History Purge

George Moroses 0 40022 Article rating: 5.0

Did you know that you can clear production history?

JIT900 - Production History Purge

To clear field values from Production History Inquiry (JIT300). Run monthly as Day End Run and Month End Run which clears M-T-D fields.  There is an option to clear the average per hour and maximum per hour fields. This program can be run as often as you wish.

First4748495052545556Last

Tips:  LX | BPCS | M3

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: Difference Between a Serialized Item and Unit Effective Item

A serialized item is not the same as a unit effective item. A serialized item has a serial number that is used to identify and track individual items, whereas a unit effectivity item has an effectivity unit that provides some information about the item's configuration. However, an item can be both serialized and unit effective.

Optimize Your Manufacturing Today!
 
Print
134161 Rate this article:
No rating

Contact

Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Tips: LN | Baan

Companies can decide to involve a subcontractor and subcontract part of their activities. The subcontractor carries out the work and returns the products to your company.

In Infor LN, subcontracting is considered as purchasing labor from a third party. Therefore, if a manufacturer wants to subcontract work, he must generate a purchase order to start the subcontracting process. These are the types of subcontracting:

  • Subcontracting with material flow
    • Operation subcontracting: For operation subcontracting, a part of the production process (one or more operations) is subcontracted.
    • Item subcontracting: For item subcontracting, an item's entire production process is subcontracted. Therefore, it is always used with material flow support.
  • Subcontracting without material flow: The simplest form of subcontracting is to generate a subcontracting purchase order to record the operations outsourced to a subcontractor. The subcontracting purchase order only represents the administrative handling of the subcontracting process. When the subcontracted item is received back from the subcontractor, you must close the subcontracting purchase order, which initiates the production process.
  • Unplanned subcontracting: Unplanned subcontracting is applicable when you subcontract after generating a production order. For unplanned subcontracting, a purchase order is generated from the production order and the material supply lines are populated by Shop Floor Control.
  • Service subcontracting: For service subcontracting, work on an item to be maintained or repaired is subcontracted. This work entails the entire repair process, or only a part of it. Service subcontracting can be used with or without material flow support.

To start the subcontracting process, a purchase order is required.

Categories