Infor ERP Tips and Infor ERP News for Infor LX, BPCS, Infor ERP LX, Infor LN, Infor ERP LN, Baan, Infor M3, and Movex

Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 78164 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 86222 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 34517 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 70056 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 106282 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance

Kathy Barthelt 0 101067 Article rating: No rating

In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax.

 

In Infor LN, users can select or clear the new Include Tax in Order Balance check box in the COM Parameters (tccom0000s000) session to indicate whether users want to include tax amounts in the order balance amount. This parameter has an effect on various sessions in Order Management.

BPCS/LX Tip of the Week: Product Routing

Anthony Etzel 0 73869 Article rating: No rating

Defining the Product Routing first requires the items to be setup in the Item Master file. Other master files also need to be defined prior to creating the routing.
These include:

  • The Facility defined with a SYS program
  • The Warehouses defined with an INV program
  • Locations defined with an INV program
  • The Machines (required if using capacity planning or an MES interface) defined with an MDM program

After the above data is set up, the Department file and Work Center files can be setup in MDM. Now you are ready to define a product route.

First126127128129131133134135Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Streamline Your Shipping Processes – Boost Efficiency and Reduce Errors

with RMCship

Are you manually entering shipping data between your Baan or Infor LN system and UPS/FedEx? If so, you’re likely facing challenges with efficiency, accuracy, and wasted time on redundant tasks. We understand these pain points and want to introduce a solution to transform your workflow: RMCship.

According to a recent report by The Manufacturer and IBM, 92% of manufacturers are prioritizing efficiency. However, the manual entry of shipment details—like transportation mode, weight, and tracking numbers—into logistics systems, only to re-enter data back into Baan and Infor LN, is a major bottleneck. This process not only consumes valuable time but also increases the risk of costly errors and delays in shipping and invoicing.

Here’s how RMCship can help:

  • Eliminate Redundant Data Entry: RMCship integrates seamlessly with Baan IV, Baan V, and Infor LN to automatically send shipment details to UPS and FedEx. Once the shipment is prepared, tracking data, freight costs, and other pertinent information are automatically updated with your ERP.

  • Save Valuable Time: By automating data transfer, RMCship can rescue between 1.5 to 2.5 hours per day, 30-50 hours a month.

  • Reduce Errors and Shipping Delays: RMCship removes manual entry, reducing errors and ensuring shipping and invoicing happen promptly. Faster invoicing means improved cash flow and better customer satisfaction.

  • Access Real-Time Shipping Information: With instant updates on shipping details, your customer service team can access real-time information to enhance customer communication.

Why RMCship?

RMCship offers a complete integration solution for Baan and Infor LN systems, enabling you to streamline your shipping processes from start to finish. With on-premise and cloud deployment options, RMCship adapts to your needs, whether you're handling single, partial, or multiple order shipments per carton or pallet.

Don’t let inefficiencies hold you back. Automate your shipping workflow with RMCship, and see the difference in operational speed, accuracy, and customer satisfaction.

Give us a quick call or request a demo to discuss how RMCship can specifically benefit your operations!

800.762.2077 

Request a demo


 

Print
16631 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories