Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 178 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

BPCS/LX Tip of the Week: Indirect Time

Anthony Etzel 0 1002 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.
 

  1. If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  2. If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

 

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

 

10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 38414 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 75119 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 81628 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 32739 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 68711 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date
First123124125126128130131132Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

It’s Mid-January, and IT’S GO TIME!
Crossroads RMC
/ Categories: Services News

It’s Mid-January, and IT’S GO TIME!

Infor LX | BPCS | Infor LN | Baan

The calendar is fresh, the resolutions are set, and the opportunities are endless!

But before you dive headfirst into tackling your to-do list, take a moment.

Pause.

Now is the perfect time to reflect and plan your ERP strategy.

What’s an ERP Strategy?

An ERP strategy is a roadmap for the steps you should take before, during, and after implementing an ERP system. It’s designed to ensure your ERP delivers on its promise of functionality and success—the backbone of running your business effectively.

Think of it like planning a road trip:

  • Which cities will you visit?
  • Where will you stay?
  • What landmarks do you want to explore?

Without a plan, you’re winging it. While spontaneity might work for a vacation, it’s risky when it comes to your ERP system.

A poorly executed road trip might waste time or cause frustration, but a poorly executed ERP strategy? That can hinder your business growth, create inefficiencies, and lead to costly mistakes.

What if:

  • You never evaluated whether your ERP aligns with your company’s growth strategy?
  • Your employees didn’t fully understand how to use critical features, leading to incomplete or incorrect transactions?
  • You missed out on new ERP features or overlooked opportunities to streamline processes, saving time and money?

Whether your next steps include a major ERP upgrade, integrating new tools, or optimizing the system you have today, there’s always room for improvement.


How Crossroads RMC Can Help

At Crossroads RMC, we provide tailored ERP solutions to ensure your success. Our services include:

  • Implementing New Functionality: Unlock the full potential of your current ERP version.
  • ERP Upgrades: Stay current by upgrading to the latest version.
  • Employee Training: Train new employees or retrain your team with best practices.
  • Process Automation: Reduce manual, time-consuming tasks.
  • System Integration: Connect all your tools into a cohesive system that communicates seamlessly.
  • ERP Add-On Solutions: Save significant time and money with innovative add-ons.

Our mission is to optimize your manufacturing operations by reducing costs, improving quality, and increasing efficiency.


Explore:

Let’s Make This Your Year

Contact Crossroads RMC today to develop an ERP strategy that positions your business for success in 2025 and beyond.

solutions@crossroadsrmc.com | 800.762.2077

IT’S GO TIME!

Print
7800 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

x

Categories