BPCS/LX Tip of the Week: The Item Master Requirements Code

Anthony Etzel 0 77095 Article rating: No rating

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

Grindmaster Cecilware Selects Crossroads RMC For Baan IV / Davisware Integration

Crossroads RMC 0 41107 Article rating: No rating

Grindmaster Cecilware, a leader in the development of products for the food and beverage industry, has selected Crossroads RMC to integrate their Baan IV system to Davisware Global Warranty. Davisware is an electronic customizable online solution that fits almost any warranty process. Grindmaster’s customers will be able to access the Davisware software online and process warranty claims which will then automatically feed back into the Baan IV system for further review and processing. The integration is expected to go live in Q1 of 2015.

Huf North America Goes Lives With Next Phase of RMC3 Data Collection

Crossroads RMC 0 42327 Article rating: No rating

Huf North America, a global leader in the production of mechanical and electronic key systems, lock sets, steering locks, and remote control systems for the automotive industry, has gone live with phase 2 of their Crossroads RMC data collection implementation. This go-live included Report Orders Complete, Labor Reporting, Material Issue, Inventory Transfers, barcode label modifications, as well as custom applications for their Paint / Polishing operations. This go-live was paired with the expansion of Huf’s Plastic Injection Molding and Paint Facility in Greeneville, TN. The next phase of this project will include the extension of the Crossroads RMC solution into Huf’s facility in Mexico.

Baan/LN Tip of the Week: Product Configurator - Part 2

Baan Tips

Kathy Barthelt 0 111647 Article rating: 3.0
Who gets involved?
  1. Most commonly Engineering is involved in writing the rules, creating the bills and routings.
  2. Sales or Customer Service determines the questions and the order they are asked in.
  3. Sales or Customer Service determines the rules for the pricing.
  4. Sales, or Customer Service, and Engineering work together in determining the part number, description and text.

What are the steps?

  1. You must start by defining the features and options (questions and answers) and the order in which these are asked. We work this out first using sticky notes and large easel paper. Normally during the process we find that we want to move these questions around. Setting them down on paper makes the process of getting the data into Baan much more efficient. We also then have a record of what decisions were made prior to entering the data. This is normally a joint effort of Engineering and Sales. This is required and must be the first step.
  2. Constraints for features and options. These are the rules for determining what questions are asked and which options are allowed. This is generally done by Engineering or whoever is responsible for the configurator. This is required.
  3. Generic Bill of Material. All possible bill options are entered here and constraints are written to determine which options are selected based on the answers to the questions. This is generally done by Engineering or whoever is responsible for the configurator. This is a required step.
  4. Generic Routing. Similar to the bill of material, but used for generation of the routing steps. This is generally done by Engineering or whoever is responsible for the configurator. This is optional.
  5. Generic Item Data. This consists of creating custom item numbers, descriptions, text, material, size or standard fields in the custom item master. This is generally done by Engineering or whoever is responsible for the configurator though Sales may have some involvement. This is optional.
  6. Generic Pricing. This is used to calculate the selling price based on the answers to the questions. This is normally a responsibility of Sales or whoever determines the pricing. This group is also trained on writing the constraints for this section only. This is optional.

BPCS/LX Tip of the Week: How To Capture Re-Work Time (Part 1)

Anthony Etzel 0 89516 Article rating: No rating
In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.

BPCS/LX Tip of the Week: Configuration Management

Anthony Etzel 0 82311 Article rating: No rating

Make to Order? No problem if you use the Configuration Management System. This LX product allows you to define and configure a make to order product during Customer Order Entry. Basically, you have the option to create different products under the same common product item. You will get two completely different common end items that are configured from the same common parent.

The customer orders are planned and turned into shop orders for each end item with all the associated components. With an MES solution in place, the shop order side is easy to schedule and allows you to manage the shop floor.

First121122123124126128129130Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

VJES (Visual Job Execution Software) for Infor LN & Baan

In a recent study on employee training and trends in manufacturing, the following results were obtained:

  1. Improved Learning Retention: People retain about 80% of what they see and do, compared to only 20% of what they read. This makes VWIs, which combine visuals and hands-on action, significantly more effective for training.
  2. Reduced Errors: VWIs help minimize mistakes by providing clear, step-by-step guidance. Companies that have switched from traditional text-heavy instructions to visual formats report a notable decrease in errors, leading to better quality assurance. 
  3. Faster Onboarding: New employees can reach full productivity much quicker with VWIs. Some organizations have cut training time by nearly 50%, allowing workers to learn at their own pace with minimal supervision.

​Every manufacturer relies on a few core metrics to manage operations: efficiency, productivity, capacity, and labor and equipment utilization. These benchmarks are used worldwide to assess performance and process effectiveness.

What if you could integrate quality control into every operation at every work center to ensure high-quality finished goods and simultaneously train high-quality operators? Manufacturing quality can be achieved using documented, repeatable, and measurable processes.

Introducing Crossroads RMC's ERP-independent solution, VJES (Visual Job Execution Software). VJES is an electronic work instruction interface that bridges engineering and the paperless manufacturing floor. VJES ensures that only one version of the work instructions is available—the correct one. By deploying up-to-date, visually rich work instructions, images, and videos, VJES provides personnel the best opportunity to build it right the first time and tracks worker productivity throughout the build process.

VJES Achieves RESULTS - Reported by VJES Customers:

  • Turn new hire welders into specialized welders in 2 weeks
  • Improve quality scores from 68/100 to 93/100 in 12 months
  • Reduce employee training time from 1 week to 3 days within the first month of use
  • Maintain a first-pass yield percentage of 100% for 8 consecutive months this year
  • Incorporate a quality cell after productivity increases due to the bandwidth gained from adopting VJES
     

Contact us800.762.2077 to learn more, or Request a Demo today!

Print
11470 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories