Baan/LN Tip of the Week: Plan Codes

Kathy Barthelt 0 62281 Article rating: No rating

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

Filtec Selects Crossroads RMC for Baan Data Collection

Kathy Barthelt 0 29766 Article rating: No rating

Filtec, a leading provider of in-line inspection solutions for the food, beverage, and pharmaceutical industries, has selected the Web Collect, formerly RMC3 data collection solution from Crossroads RMC for their Baan IV system. Filtec plans to implement Labor Reporting and Report Operations Complete as part of this project with the goal of eliminating manual data entry and gaining better visibility to gap time. The project is scheduled to go live in early November 2015.

BPCS/LX TIP OF THE DAY: MATERIAL REQUIREMENT DATES AND LEAD TIME OFFSETS IN MRP

Anthony Etzel 0 65415 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

Baan/LN Tip of the Week: Data Sizing Moving to LN

Kathy Barthelt 0 60228 Article rating: No rating

The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume.  Set the autogrowth to a minimum of 10 percent or 1 GB (for each extent) to avoid fragmentation on file system level. Never use the default extent size of 1 MB.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 62676 Article rating: 3.0

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items

Kathy Barthelt 0 69952 Article rating: 3.0

If you have a parts warehouse and prefer to use SIC for planning (re-order point) but need to use MRP/MPS planning for production, create a non-nettable warehouse for the parts warehouse and run the SIC plan against that warehouse.

When running the SIC plan, be sure to set the Order System to “MPS to MRP” for Baan IV and to “Planned to Planned” for Baan V and LN.

Using this method you keep the parts inventory out of the production planning and in the hands of the parts warehouse planner.

BPCS/LX Tip of the Week: Indirect Time Reporting

Anthony Etzel 0 61594 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.

  • If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  • If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

Baan/LN Tip of the Week: Differences Between Constraint Planning in Baan IV and Enterprise Planning in LN

Kathy Barthelt 0 58091 Article rating: No rating

In Baan IV, a distinction is made between the actual ERP system and a separate planning tool which contains the Constraint Planning package. This tool was intended to work with any ERP system, not just with Baan IV. The Enterprise Planning package is now considered to be a package like any other package in Infor LN.

Users of Baan IV could choose whether they wanted to plan their supply in one of the following ways:

  • By using the MPS and MRP modules in the Manufacturing package.
  • By using the RPD and RMP modules in the Constraint Planning package.

Users of Infor LN can only use the Enterprise Planning package. The distinction between the MPS items and MRP items has been abandoned. In Infor LN, all items can be planned by using a combination of master-based planning methods and order-based planning methods.

First117118119120122124125126Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

An ERP System Review is NOT a Report Card

It's a no-judgment-review - we promise!

report card C minusWe all remember our school days and the nervousness that we felt when it came time to get our grades. Even if we were doing well, we were still nervous. Sometimes we experienced that same nervousness when it came time for a performance review on our job. Nervousness…sometimes dread…knowing that our performance was not what we wanted it to be, or others expected it to be. 

Somehow I think the feelings that we felt in our past often find ways to creep into our present. I have seen this recently when I suggested an ERP system review to one of our customers. They immediately became flustered and thought about every possible problem that they knew existed within the software and how they were currently using it. I asked them to consider the purpose of the ERP system review.

An ERP Utilization Review will:

  • Document how your company is using your ERP system (or a particular aspect of the system) and to what extent the system meets the needs of the business.
  • Identify challenges encountered using the software.
  • Create opportunities for improving business processes and generating additional value.
  • Identify potential risks and areas that need improvement.


key hole to the futureSo, if the result of ERP system review is to establish a path forward for growth based on current status, then why doesn’t every company take advantage of it? I think for some, the answer lies in the feelings of nervousness and dread still stuck in the recesses of our brains.

An ERP system review or more specifically a utilization review is NOT a personal report card, or performance review showing how well a particular individual does his/hers/their job, nor is it an attack on the team that implemented the software. 

As they say, hindsight is 20/20. What we view now to be a less than ideal implementation methodology may have been absolutely appropriate at the time the software was originally deployed. The software has likely matured and the skillsets of the individuals responsible for the system have likely matured as well. In some cases, those resources are no longer with the company, leaving those that remain with no back story as to how and why implementation decisions were made.

Instead of viewing the ERP utilization review as a reason to find fault in previous decisions, think of it as discovering untapped potential – both of the ERP system and the people who use it. Viewing an ERP utilization review in this way puts a positive spin on it and allows us to challenge ourselves to identify opportunities for growth far greater than anything we imagined before. This means not only moving our businesses forward faster but also advancing the strength of the company as individuals and as a team.

What untapped potential lies within your company?

Consider a utilization review of your entire ERP system, or just a part of it like Finance, Technology, Materials Management, Order Processing, or Shop Floor Control. You just might be surprised at what greatness can be achieved… far greater than anyone could have imagined.  

Get a free phone consultation button

800.762.2077

Print
30672 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories